Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC 20 1ST A CROSS SAI NAGAR AREHLLI UTTARHALLI BANGALORE 560 061 | BENGALURU URBAN | KARNATAKA | 560061 | ₹2.0 Cr | L1 | Accepted-AOC Lowest |
| 2 | L2₹2.0 CrRejected-Finance FLAT NO 4 VIRGINIA CO OP HOUSING SOCIETY AIR PORT ROAD CHICALIM VASCO DA GAMA GOA 403 711 | SOUTH GOA | GOA | 403711 | ₹2.0 Cr | L2 | Rejected-Finance Not lowest |
| 3 | L3₹2.1 CrRejected-Finance | ₹2.1 Cr | L3 | Rejected-Finance Not lowest |
| 4 | L4₹2.1 CrRejected-Finance | ₹2.1 Cr | L4 | Rejected-Finance Not lowest |
| 5 | L5₹2.2 CrRejected-Finance FLAT NO 03 PANCHAVATI BUILDING ADARSH NAGAR CHICALIM GOA 403711 | SOUTH GOA | GOA | 403711 | ₹2.2 Cr | L5 | Rejected-Finance Not lowest |
| Sl No | Description | Qty | Unit | B5BUILDING SOLUTIONS L6 | M/S jvsr constructions L2 | M/s M Munivenkatappa and Company L3 | K. VENKATESH NAIDU L1 | C R R CONSTRUCTIONS L4 | Lucky Enterprises L7 | ROY CONSTRUCTION CO L9 | M/s. P S REDDY L5 | HRISHIKESA INFRATECH PRIVATE LIMITED L8 | SPAAN Infratech L10 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling stone slab flooring laid in cement mortar including removal of dismantled material from site complete all as specified and as directed. | 5,311 | SQUARE METRE | 59 ₹3.1 L | 36 ₹1.9 L | 50 ₹2.7 L | 29 ₹1.5 L | 90 ₹4.8 L | 40 ₹2.1 L | 80 ₹4.2 L | 70 ₹3.7 L | 106 ₹5.6 L | 320 ₹17.0 L |
| 2.00 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of dismantled material from site complete all as specified and directed. | 447 | SQUARE METRE | 60 ₹26,820 | 36 ₹16,092 | 50 ₹22,350 | 15 ₹6,705 | 60 ₹26,820 | 40 ₹17,880 | 75 ₹33,525 | 200 ₹89,400 | 82 ₹36,654 | 146 ₹65,262 |
| 3.00 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of dismantled material from site complete all as specified and as directed. | 1,835 | RUNNING METRE | 35 ₹64,225 | 54 ₹99,090 | 100 ₹1.8 L | 19 ₹34,865 | 50 ₹91,750 | 50 ₹91,750 | 60 ₹1.1 L | 100 ₹1.8 L | 23 ₹42,205 | 40 ₹73,400 |
| 4.00 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50m and lift upto 1.5 m, for all kinds of soil, complete all as specified and as directed. | 5,977 | SQUARE METRE | 90 ₹5.4 L | 90 ₹5.4 L | 40 ₹2.4 L | 129 ₹7.7 L | 45 ₹2.7 L | 60 ₹3.6 L | 130 ₹7.8 L | 90 ₹5.4 L | 118 ₹7.1 L | 170 ₹10.2 L |
| 5.00 | Supplying and laying for 100mm thick broken boulders hardcore of gauge n exc. 63 mm, deposited, spread and levelled in layers n exc. 15 cm thick, watered and rammed to a true surface, complete all as specified and as directed. | 598 | CUBIC METRE | 1,550 ₹9.3 L | 1,440 ₹8.6 L | 1,600 ₹9.6 L | 1,199 ₹7.2 L | 1,900 ₹11.4 L | 1,240 ₹7.4 L | 2,200 ₹13.2 L | 1,500 ₹9.0 L | 2,124 ₹12.7 L | 2,700 ₹16.1 L |
| 6.00 | Material and Labour for providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - for all work 1:3:6 (1 Cement : 3 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 6 graded stone aggregate 40 mm nominal size Recycled Aggregate (RA), complete all as specified and as directed. | 598 | CUBIC METRE | 6,600 ₹39.5 L | 4,860 ₹29.1 L | 5,650 ₹33.8 L | 4,409 ₹26.4 L | 5,700 ₹34.1 L | 6,900 ₹41.3 L | 7,300 ₹43.7 L | 5,700 ₹34.1 L | 6,962 ₹41.6 L | 5,800 ₹34.7 L |
| 7.00 | Material and Labour for centering and shuttering including strutting, propping etc. and removal of form for sub base concrete complete all as specified and as directed. | 200 | SQUARE METRE | 500 ₹1 L | 540 ₹1.1 L | 500 ₹1 L | 249 ₹49,800 | 450 ₹90,000 | 540 ₹1.1 L | 550 ₹1.1 L | 450 ₹90,000 | 472 ₹94,400 | 595 ₹1.2 L |
| 8.00 | Material and Labour for chequered precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand) finished with dark shade pigment using ordinary cement, complete all as specified and as directed. | 4,252 | SQUARE METRE | 1,170 ₹49.7 L | 900 ₹38.3 L | 1,200 ₹51.0 L | 1,129 ₹48.0 L | 970 ₹41.2 L | 1,255 ₹53.4 L | 980 ₹41.7 L | 900 ₹38.3 L | 1,286 ₹54.7 L | 1,300 ₹55.3 L |
| 9.00 | Supply and Fix factory made chamfered edge 80 mm thick C.C. paver block of M-40 grade with approved colour design and pattern in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size / shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding / laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand, complete all as specified and as directed. | 1,525 | SQUARE METRE | 1,050 ₹16.0 L | 1,080 ₹16.5 L | 1,350 ₹20.6 L | 1,309 ₹20.0 L | 1,390 ₹21.2 L | 1,360 ₹20.7 L | 1,650 ₹25.2 L | 1,100 ₹16.8 L | 1,298 ₹19.8 L | 1,450 ₹22.1 L |
| 10.00 | Material and Labour for providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. all as specified and as directed. Note : length of finished kerb edging shall be measured for payment. Precast C.C. kerb stone shall be approved by Garrison Engineer. | 58 | CUBIC METRE | 7,900 ₹4.6 L | 12,600 ₹7.3 L | 12,000 ₹7.0 L | 12,499 ₹7.2 L | 12,000 ₹7.0 L | 13,300 ₹7.7 L | 18,000 ₹10.4 L | 10,000 ₹5.8 L | 11,800 ₹6.8 L | 13,500 ₹7.8 L |
Updated dates
Tender Value
₹2.7 Cr
EMD Value
₹3.5 L
Closing Date
10 Feb 2026, 6:00 pmClosed
CHIEF ENGINEER RND SECUNDERABAD
CHIEF ENGINEER RND SECUNDERABAD PICKET OPP JUBILEE BUS STATION SECUNDERABAD 500003
PROVISION OF CHEQUERED TILE FOOTPATH AND IMPROVEMENTOF DRAINAGE SYSTEM ALONGWITH ALLIED WORK FROM CDA RND OFFICE GATE TO SURANJANDAS ROAD JUNCTION IN DRDO TOWNSHIP, PHASE-I,CV RAMAN NAGAR, BANGALORE UNDER GE I RND WEST BANGALORE
2025_MES_746166_1
82674
Open Tender
Civil Works
180 days
WEST BANGALORE
Class B
category a(i)
8 documents required · 8 mandatory
₹2,000
GARRISON ENGINEER I RND WEST BANGALORE
₹3.5 L
Yes
28 Apr 2026
26 Dec 2025
12 Feb 2026
26 Dec 2025
10 Feb 2026
3 Feb 2026
SQUARE METRE
SQUARE METRE
RUNNING METRE
SQUARE METRE
CUBIC METRE
CUBIC METRE
SQUARE METRE
SQUARE METRE
SQUARE METRE
CUBIC METRE
RUNNING METRE
SQUARE METRE
CUBIC METRE
CUBIC METRE
KILO GRAM
KILO GRAM
PER 10 RUNNINGMETRE
KILO GRAM
RUNNING METRE
CUBIC METRE
CUBIC METRE
CUBIC METRE
CUBIC METRE
CUBIC METRE
CUBIC METRE
SQUARE METRE
KILO GRAM
CUBIC METRE
CUBIC METRE
CUBIC METRE
stage.html
html • 0.08 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.51 MB
82674Tender.pdf
Tender Documents • 1.38 MB
BOQ_835508.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid