Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-Finance | ₹4.8 L | L1 | Accepted-Finance Lowest Bidder |
| 2 | L2₹5.0 LRejected-Finance | ₹5.0 L | L2 | Rejected-Finance Highest Bidder |
| 3 | L3₹5.4 LRejected-Finance | ₹5.4 L | L3 | Rejected-Finance Highest Bidder |
| Sl No | Description | Qty | Unit | Veeraa Constructions L3 | G VAIRAVELU L2 | V.Murugan Contractor L1 |
|---|---|---|---|---|---|---|
| 1.00Attending the routine Pump Operation for water supply distribution to the flats, pipe line repair work and cleaning work as per the instruction of the Departmental Officers then and there etc., all complete | ||||||
| 1.01 | Pump operator & sweeper cum scavangers 90 Houses for the period from 01.06.2026 to 31.03.2027 | 304 | Days | 900 ₹2.7 L | 841 ₹2.6 L | 820 ₹2.5 L |
| 2.00Attending the routine maintenance work of Sweeping around the Building, Cleaning the drains arround the Blocks: removal of sewage blockages between the buildings to the main sewer line and maintaining general hygene etc., as per the instruction of the Departmental Officers then and there etc., all complete. | ||||||
| 2.01 | Pump operator & sweeper cum scavangers 90 Houses for the period from 01.06.2026 to 31.03.2027 | 244 | Days | 750 ₹1.8 L | 689 ₹1.7 L | 650 ₹1.6 L |
| 3.00 | GST 18% | 1 | Tax | - | - | - |
Tender Value
Refer Docs
EMD Value
₹5,050
Closing Date
20 May 2026, 11:00 amClosed
EE ADO TNHB
Hosur Housing Unit, Hosur
Engaging Essential Labour for the maintenance of 90 Houses at Phase XV, zone IV, Hosur for the period from 01.06.2026 to 31.03.2027
2026_TNHB_676942_1
D1/0596/2026
Open Tender
Civil Works
Hosur Housing Unit, Hosur
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹5,050
20 May 2026
14 May 2026
20 May 2026
14 May 2026
20 May 2026
14 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Attending the routine Pump Operation for water supply distribution to the flats, pipe line repair work and cleaning work as per the instruction of the Departmental Officers then and there etc., all complete | |||||
| 1.01 | Pump operator & sweeper cum scavangers 90 Houses for the period from 01.06.2026 to 31.03.2027 | 304 | Days | 761.93 | ₹2,31,626.72 |
| 2Attending the routine maintenance work of Sweeping around the Building, Cleaning the drains arround the Blocks: removal of sewage blockages between the buildings to the main sewer line and maintaining general hygene etc., as per the instruction of the Departmental Officers then and there etc., all complete. | |||||
| 2.01 | Pump operator & sweeper cum scavangers 90 Houses for the period from 01.06.2026 to 31.03.2027 | 244 | Days | 761.93 | ₹1,85,910.92 |
| 3 | GST 18% | 1 | Tax | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_813393.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
TENDERSCHEDULE90.pdf
Tender Documents • 0.35 MB
BOQ_813393.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid