Tender Value
₹2.7 Cr
EMD Value
₹2.7 L
Closing Date
4 Mar 2026, 5:00 pmClosed
CHIEF ENGINEER
POLICE HEAD QUARTERS DGP OFFICE SAIFABAD
Construction of 1 DSP Quarter, 1DSP Admin Quarter, 1 RI Quarter, 1RSI Quarter at Mahabubabad of Mahabubbad District.
680570
T93/2025-26
OPEN
Civil Engineering Works
MAHABUBABAD, TELANGANA
15 documents required · 15 mandatory
₹9,475
₹2.7 L
17 Feb 2026
17 Feb 2026
17 Feb 2026
EARTH WORK EXCAVATION FOR FOUNDATIONS AND DEPOSITING ON BANK, FOR ALL LIFTS AND WITH AN INITIAL LEAD OF 10M INCLUDING ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS SHORING, SHEETING, PLANKING, STRUTTING, DEWATERING SITE CLEARANCE, CLEARING SHURBS, BRUSHWOOD, UNDER GROWTH AND SMALL TREES NOT EXCEEDING 300 MM GIRTH, MEASURED AT ONE METRE ABOVE GROUND ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK INCLUDING DEWATERING CHARGES ETC AS PER SS - 20 B FOR STIFF BLOCK COTTON SOIL , HARD RED EARTH, MURRAM, ORDINARY GRAVEL - MANUAL MEANS UP TO 3M DEPTH - FOUNDATION OF BUILDING (APSS 308).
CEMENT CONCRETE (1:4:8) PROP. USING 40MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOUNDATIONS & UNDER STONE SLAB FLOORING .(APSS NO: 402).
EARTH WORK EXCAVATION FOR HARD ROCK (BLASTING PROHIBITED) WITH 1.00 ROCK BREAKERS INCLUDING BREAKING ROCK AND LOADING IN TIPPERS AND DISPOSAL WITHIN ALL LIFTS AND LEAD UP TO 1000MTS, TRIMMING BOTTOM AND SIDE SLOPES IN ACCORDANCE WITH REQUIREMENTS OF LINES, GRADES AND CROSS SECTIONS AND INCLUDING HIRE AND OPERATIONAL CHARGES OF T & P,. COMPLETE FOR FINISHED ITEM OF WORK FOR TRENCH CUTTING AS PER THE MORT&H SPECIFICATION NO.301 AS DIRECTED BY THE ENGINEER-IN-CHARGE.
DRILLING OF 25MM DIA HOLES IN HARD GRANITE USING PNEUMATIC COMPRESSOR EXCLUDING COST OF STEEL INCLUDING ALL INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING GST.
GROUTING THE DRILLED HOLES WITH NEAT CEMENT SLURRY OR WITH APPROVED GROUT ADMIXTURE USING PUMP -EXCLUDING COST OF DRILLING HOLES AFTER FIXING NOZZLES AS TECHNICAL SPECIFICATION APPROVED BY THE DEPARTMENT BUT EXCLUDING GST.
RE-FILLING WITH USEFUL AVAILABLE EXCAVATED EARTH OTHER THAN EXPANSIVE SOILS LIKE RED EARTH AND ORDINARY GRAVEL ETC., (EXCLUDING ROCK) IN TRENCHES, SIDES OF FOUNDATIONS AND BASEMENT WITH INITIAL LEAD IN LAYERS NOT EXCEEDING 15 CM THICK, CONSOLIDATING EACH DEPOSITED LAYER BY WATERING AND RAMMING INCLUDING COST AND CONVEYANCE OF WATER TO WORK SITE AND ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES , HIRE CHARGES OF T & P ETC., BUT EXCLUDING GST - COMPLETE FOR FINISHED ITEM OF WORK. (APSS NO. 309 & 310)
FILLING WITH CARTED GRAVEL IN TRENCHES, SIDES OF FOUNDATIONS AND BASEMENT WITH INITIAL LEAD IN LAYERS NOT EXCEEDING 15 CM THICK, CONSOLIDATING EACH DEPOSITED LAYER BY WATERING AND RAMMING INCLUDING COST AND CONVEYANCE OF WATER TO WORK SITE AND ALL OPERATIONAL, INCIDENTAL, SEIGNORAGE, LABOUR CHARGES, HIRE CHARGES OF T & P ETC., COMPLETE FOR FINISHED ITEM OF WORK. (APSS NO. 309 & 310)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING CENTERING WITH STEEL PLATES, SHUTTERING, VIBRATING, CURING ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR FINISHED ITEM OF WORK. FOR FOOTINGS. (APSS NO. 403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE, INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING CENTERING WITH STEEL PLATES, SHUTTERING, VIBRATING, CURING ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR FINISHED ITEM OF WORK.FOR PEDESTALS (APSS NO. 403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR COLUMNS UPTO PLINTH BEAM LEVEL (APSS NO.403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR PLINTH BEAM (APSS NO.403)
MASONRY WORK IN CM (1:6) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZES 290 X 225 X 140 MM AND 290 X 100 X 140 MM WITH A COMPRESIVE STRENGTH NOT LESS THAN 50 KG/SQM INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SCAFFOLDING AND CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS COMPLETE FOR FINISHED ITEM 0F WORK. 335MM THICK WALLS FOR - BASEMENT (APSS No. 501 & 504)
PROVIDING "HYSD/TMT" STEEL BARS OF DIFFERENT DIAMETERS BELOW 36MM DIAMETER Fe 500 GRADE (AS PER IS 1786 - 2008 AND ALL ITS LATEST AMMENDMENTS) FROM Steel Manufacturers with minimum installed Production Capacity of 2 Lakh MT/annum to 10 Lakh MT Per annum (GOEL, SHYAM, JAI BALAJI, AFSTAR/MSLIFE TMT, RADHA TMT, SUGNA TMT, SHREE TMT) FOR REINFORCEMENT INCLUDING CUTTING, BENDING TO REQUIRED SIZES AND SHAPES, PLACING THEM IN POSITION WITH COVER BLOCKS OF APPROVED SHAPE AND SIZE, TYING FIRMLY WITH M.S BINDING WIRE OF SWG, FORMING GRILLS FOR REINFORCEMENT WORKS AS PER APPROVED DESIGNS AND DRAWINGS TO BE SUPPLIED AT THE TIME OF EXECUTION OF WORK INCLUDING COST AND CONVEYANCE OF DEFORMED BARS, BINDING WIRE, COVER BLOCKS AND ALL WASTAGES SUCH AS OVER LAPS, COUPLINGS, WELDED JOINTS, CHAIRS, SPACE BARS ETC., AS DIRECTED BY THE ENGINEER-IN-CHARGE AND ALL OPERATIONAL, INCIDENTAL LABOUR CHARGES SUCH AS CUTTING, BENDING, PLACING IN POSITION, TYING ETC., EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK FOR ALL LENGTHS AS PER DRAWINGS AND TECHNICAL SPECIFICATIONS FOR BARS BELOW 36MM DIA WHERE THEY ARE NOT WELDED.
PLASTERING TO SUPERSTRUCTURE 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. with sponze finishing, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE.FOR FINISHED ITEM OF WORK. FOR BASEMENT (APSS NO: 901&904)
MASONRY WORK IN CM (1:6) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 225 X 140 MM FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SCAFFOLDING AND CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR SUPERSTRUCTURE WALLS OF 225MM THICK GROUND FLOOR FOR FINISHED ITEM OF WORK(APSS NO. 501&504)
MASONRY WORK IN CM (1:4) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 100 X 140 MM FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SCAFFOLDING AND CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR SUPERSTRUCTURE WALLS OF 100MM THICK GROUND FLOOR. FOR FINISHED ITEM OF WORK(APSS NO. 501&504)
PLAIN CEMENT CONCRETE (1:3:6) PROP. USING 20MM GRADED HARD GRANITE MACHINE CRUSHED METAL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, CENTERING, MACHINE MIXING, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR CHARGES ETC.,BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. BED BLOCKS IN GROUND FLOOR (APSS NO: 402).
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR COLUMNS GROUND FLOOR (APSS NO.403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR BEAMS GROUND FLOOR (APSS NO.403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR GROUND FLOOR SLABS 125MM THICK (APSS NO.403).
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR GROUND FLOOR SLABS 175MM THICK (APSS NO.403).
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR GROUND FLOOR SLABS 150MM THICK (APSS NO.403).
RCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR GROUND FLOOR LINTELS
RCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR GROUND FLOOR RACKS OF 25 MM THICK
RCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL), LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK - FOR SUNSHADES OF 50MM AVERAGE THICK INCLUDING DRIP COURSE OF SIZE 40MM WIDE X 20MM HEIGHT IN CEMENT MORTAR (1:4)PROP FOR GROUND FLOOR (APSS NO. 403)
PROVIDING "HYSD/TMT" STEEL BARS OF DIFFERENT DIAMETERS BELOW 36MM DIAMETER Fe 500 GRADE (AS PER IS 1786 - 2008 AND ALL ITS LATEST AMMENDMENTS) FROM Steel Manufacturers with minimum installed Production Capacity of 2 Lakh MT/annum to 10 Lakh MT Per annum (GOEL, SHYAM, JAI BALAJI, AFSTAR/MSLIFE TMT, RADHA TMT, SUGNA TMT, SHREE TMT) FOR REINFORCEMENT INCLUDING CUTTING, BENDING TO REQUIRED SIZES AND SHAPES, PLACING THEM IN POSITION WITH COVER BLOCKS OF APPROVED SHAPE AND SIZE, TYING FIRMLY WITH M.S BINDING WIRE OF SWG, FORMING GRILLS FOR REINFORCEMENT WORKS AS PER APPROVED DESIGNS AND DRAWINGS TO BE SUPPLIED AT THE TIME OF EXECUTION OF WORK INCLUDING COST AND CONVEYANCE OF DEFORMED BARS, BINDING WIRE, COVER BLOCKS AND ALL WASTAGES SUCH AS OVER LAPS, COUPLINGS, WELDED JOINTS, CHAIRS, SPACE BARS ETC., AS DIRECTED BY THE ENGINEER-IN-CHARGE AND ALL OPERATIONAL, INCIDENTAL LABOUR CHARGES SUCH AS CUTTING, BENDING, PLACING IN POSITION, TYING ETC., EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK FOR ALL LENGTHS AS PER DRAWINGS AND TECHNICAL SPECIFICATIONS FOR BARS BELOW 36MM DIA WHERE THEY ARE NOT WELDED.
ORNAMENTAL PLASTERING 12MM THICK WITH A BASE COAT OF 8 MM THICK IN CM (1:5) PROP. AND FINISH COAT OF 4MM THICK IN CM (1:3) PROP. WITH DUBARA SPONGE FINISHING COMPLETE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING (MANNUAL), CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE. FOR FINISHED ITEM OF WORK (APSS NO: 901 & 904) GROUND FLOOR
PROVIDING IMPERVIOUS COAT TO EXPOSED RCC ROOF SLAB SURFACE IN CM(1:3), 20MM THICK WITH 1KG OF WATER PROOF COMPOUND PER BAG OF CEMENT LAID OVER ROOF WHEN IT IS GREEN, INCLUDING COST OF ALL MATERIALS, COST & CONVEYANCE OF ALL MATERIALS, INCIDENTAL, OERATIONAL AND LABOUR CHARGES FOR MIXING MORTAR, LAYING, RENDERING SMOOTH AND THREAD LINING, , CURING, ROUNDING OFF JUNCTIONS OF WALL AND SLAB ETC, BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE FOR FINISHED ITEM OF WORK. FOR GROUND FLOOR (APSS.NO: 901&903)
PLASTERING TO SUPERSTRUCTURE 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. with sponze finishing, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE.FOR FINISHED ITEM OF WORK. GROUND FLOOR (APSS NO: 901&904)
PAINTING TO NEW WALLS WITH THREE (3) COATS OF Synthetic Polymer luxury Plastic emulsion /solvent based lustre paint of superior grade having (VOC < 50 Gms./Lit) OF APPROVED BRAND AND SHADE (ASIAN /BERGER /NEROLAC /SAICOAT /INDOCEM OR EUIVALENT) OVER ONE COAT OF PRIMER OF APP BRAND AFTER THOUROULY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDER MATERIALS INCLUDING COST OF ALL MATERIALS TO THE INTERIOR FACES OF WALLS AS DIECTED 2COATS BY DILUTING 1LIT OF EMULSION PAINT WITH A MAXIMUM 750ML OF WATER WITH AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS (TOTAL3 COATS) WITH SURFACE PREPARATION ETC., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, BRUSHES, LABOUR CHARGES, CURING, SCAFFOLDING LIFTING(MANUAL) AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK FOR GROUND FLOOR' (APSS NO. 911)
PAINTING WITH Acrylic Emulsion paint Exterior grade silicon additives having (VOC < 50 Gms/Lit) OF APPROVED MAKE AND COLOUR TO THE EXTERIOR FACES OF WALLS AS DIECTED 2COATS BY DILUTING 1LIT OF EMULSION PAINT WITH A MAXIMUM 750 Ml OF WATER WITHIN AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS OVER 1COAT OF ASIAN EXTERIOR WALL PRIMER BY DILUTING 1LIT. OF PRIMER WITH 1LIT. OF WATER (TOTAL 3 COATS) WITH SURFACE PREPARATION Etc., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, BRUSHES, LABOUR CHARGES, CURING, SCAFFOLDING AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK FOR GROUND FLOOR (APSS NO:908).
FLOORING WITH NANO POLISHED /STAIN FREE SOLUBLE SALT PORCELAIN VITRIFIED TILES SCREEN PRINTED OF SIZE 600 X600 MM AND THICKNESS BETWEEN 8-10 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES ETC., COMPLETE, INCLUDING LIFTING (MANUAL) AND ALL LABOUR CHARGES, ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR GROUND FLOOR
PROVIDING SKIRTING TO INTERNAL WALLS TO 10 CM HEIGHT/RISERS OF STEPS WITH NANO POLISHED /STAIN FREE SOLUBLE SALT/ STAIN FREE PORCELAIN VITRIFIED TILES SCREEN PRINTED OF SIZE 600 X 600 MM AND THICKNESS BETWEEN 8-10 MM 1ST 1ST QUALITY LENGTH EQUAL TO FLOORING STONES, SET OVER BASE COAT OF CM (1:5) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., COMPLETE INCLUDING , ETC., COMPLETE FOR FINISHED ITEM OF WORK, FOR GROUND FLOOR
FLOORING WITH HIGH POLISHED GRANITE SLABS 16 TO 18MM THICK UPTO 8'-00"(2.43M) BLACK REGULAR COLOUR SET OVER BASE COAT OF CEMENT MORTAR (1:8), 20 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILESETC., COMPLETE, , LABOUR CHARGES FOR DRESSING OF TILES ETC., COMPLETE FOR FINISHED ITEM OF WORK, .FOR GROUND FLOOR KITCHEN PLATFORM
PROVIDING SKIRTING TO INTERNAL WALLS TO 15 CM HEIGHT / RISERS OF STEPS WITH HIGH POLISHED GRANITE SLAB16 TO 18MM THICK UPTO 8'-00"(2.43M) BLACK REGULAR LENGTH EQUAL TO FLOORING STONES, SET OVER BASE COAT OF CM (1:3) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., COMPLETE , ETC., COMPLETE FOR FINISHED ITEM OF WORK,FOR GROUND FLOOR KITCHEN PLAT FORM
FLOORING WITH FLAMED GRANITE SLABS OF 18MM THICK SET OVER BASE COAT OF CEMENT MORTAR (1:8), 20 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, , INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILESETC., COMPLETE, INCLUDING SEIGNIORAGE CHARGES, LABOUR CHARGES FOR DRESSING OF TILES ETC., COMPLETE FOR FINISHED ITEM OF WORK.FOR GROUND FLOOR STAIRCASE & ENTRANCE STEPS
PROVIDING SKIRTING TO INTERNAL WALLS TO 15 CM HEIGHT / RISERS OF STEPS FLAMED GRANITE SLABS OF 18MM THICK SET OVER BASE COAT OF CM (1:3) 12 MM THICK WITHWITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., COMPLETE , ETC., COMPLETE FOR FINISHED ITEM OF WORK, FOR GROUND FLOOR STAIRCASE & ENTRANCE STEPS
PROVIDING DODOOING TO INTERNAL WALLS WITH GLAZED RED OR WHITE FULL BODY CERAMIC WALL TILES OF SIZE 300 X 600 MM AND THICKNESS BETWEEN 6-8 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS I ST QUALITY, SET OVER BASE COAT OF CM (1:3) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., COMPLETE , ETC., COMPLETE FOR FINISHED ITEM OF WORK, FOR GROUND FLOOR
FLOORING WITH SUPPLY OF NON-SKID RED OR WHITE FULL BODY CERAMIC FLOOR TILES OF SIZE 300 X 300 MM AND THICKNESS BETWEEN 7-8 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS OR AS APPROVED BY THE ENGINEER - IN -CHARGE ,OF APPROVED PATTERN FOR FLOORING SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES, INCLUDING LIFTING (MANUAL) AND ALL LABOUR CHARGES, ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK, FOR GROUND FLOOR (APSS.NO:701&707).
SUPPLYING AND FIXING IN POSITION OF STAIRCASE RAILING AS PER DRAWING USING STAINLESS STEEL TUBES, SECTIONS, PLATES SHEETS & PIPES OF ALL DIAMETERS OF 304 GRADE INCLUDING LABOUR CHARGES FOR FABRICATION OF STAINLESS STEEL RAILING WORKS USING STAINLESS STEEL WELDING RODS INCLUDING BUFFING, POLISHING, LACQUER FINISHING, TO PRESENT SEAMLESS FINISH ETC., COMPLETE AS DIERCTED BY THE ENGINEER-IN-CHARGE FOR FINISHED ITEM OF WORK FOR GROUND FLOOR.
MASONRY WORK IN CM (1:6) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 225 X 140 MM FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SCAFFOLDING AND CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR SUPERSTRUCTURE WALLS OF 225MM THICK FIRST FLOOR FOR FINISHED ITEM OF WORK(APSS NO. 501&504)
MASONRY WORK IN CM (1:4) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 100 X 140 MM FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SCAFFOLDING AND CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR SUPERSTRUCTURE WALLS OF 100MM THICK FIRST FLOOR. FOR FINISHED ITEM OF WORK(APSS NO. 501&504)
PLAIN CEMENT CONCRETE (1:3:6) PROP. USING 20MM GRADED HARD GRANITE MACHINE CRUSHED METAL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, CENTERING, MACHINE MIXING, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR CHARGES ETC.,BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. BED BLOCKS IN FIRST FLOOR (APSS NO: 402).
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR COLUMNS FIRST FLOOR (APSS NO.403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR BEAMS FIRST FLOOR (APSS NO.403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR FIRST FLOOR SLABS 175MM THICK (APSS NO.403).
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR FIRST FLOOR SLABS 150MM THICK (APSS NO.403).
RCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR FIRST FLOOR LINTELS
RCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR FIRST FLOOR RACKS OF 25 MM THICK
RCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL), LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK - FOR SUNSHADES OF 50MM AVERAGE THICK INCLUDING DRIP COURSE OF SIZE 40MM WIDE X 20MM HEIGHT IN CEMENT MORTAR (1:4)PROP FOR FIRST FLOOR (APSS NO. 403)
PROVIDING "HYSD/TMT" STEEL BARS OF DIFFERENT DIAMETERS BELOW 36MM DIAMETER Fe 500 GRADE (AS PER IS 1786 - 2008 AND ALL ITS LATEST AMMENDMENTS) FROM Steel Manufacturers with minimum installed Production Capacity of 2 Lakh MT/annum to 10 Lakh MT Per annum (GOEL, SHYAM, JAI BALAJI, AFSTAR/MSLIFE TMT, RADHA TMT, SUGNA TMT, SHREE TMT) FOR REINFORCEMENT INCLUDING CUTTING, BENDING TO REQUIRED SIZES AND SHAPES, PLACING THEM IN POSITION WITH COVER BLOCKS OF APPROVED SHAPE AND SIZE, TYING FIRMLY WITH M.S BINDING WIRE OF SWG, FORMING GRILLS FOR REINFORCEMENT WORKS AS PER APPROVED DESIGNS AND DRAWINGS TO BE SUPPLIED AT THE TIME OF EXECUTION OF WORK INCLUDING COST AND CONVEYANCE OF DEFORMED BARS, BINDING WIRE, COVER BLOCKS AND ALL WASTAGES SUCH AS OVER LAPS, COUPLINGS, WELDED JOINTS, CHAIRS, SPACE BARS ETC., AS DIRECTED BY THE ENGINEER-IN-CHARGE AND ALL OPERATIONAL, INCIDENTAL LABOUR CHARGES SUCH AS CUTTING, BENDING, PLACING IN POSITION, TYING ETC., EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK FOR ALL LENGTHS AS PER DRAWINGS AND TECHNICAL SPECIFICATIONS FOR BARS BELOW 36MM DIA WHERE THEY ARE NOT WELDED.
ORNAMENTAL PLASTERING 12MM THICK WITH A BASE COAT OF 8 MM THICK IN CM (1:5) PROP. AND FINISH COAT OF 4MM THICK IN CM (1:3) PROP. WITH DUBARA SPONGE FINISHING COMPLETE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING (MANNUAL), CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE. FOR FINISHED ITEM OF WORK (APSS NO: 901 & 904) FIRST FLOOR
PROVIDING IMPERVIOUS COAT TO EXPOSED RCC ROOF SLAB SURFACE IN CM(1:3), 20MM THICK WITH 1KG OF WATER PROOF COMPOUND PER BAG OF CEMENT LAID OVER ROOF WHEN IT IS GREEN, INCLUDING COST OF ALL MATERIALS, COST & CONVEYANCE OF ALL MATERIALS, INCIDENTAL, OERATIONAL AND LABOUR CHARGES FOR MIXING MORTAR, LAYING, RENDERING SMOOTH AND THREAD LINING, , CURING, ROUNDING OFF JUNCTIONS OF WALL AND SLAB ETC, BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE FOR FINISHED ITEM OF WORK. FOR FIRST FLOOR (APSS.NO: 901&903)
PLASTERING TO SUPERSTRUCTURE 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. with sponze finishing, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE.FOR FINISHED ITEM OF WORK. FIRST FLOOR (APSS NO: 901&904)
PAINTING TO NEW WALLS WITH THREE (3) COATS OF Synthetic Polymer luxury Plastic emulsion /solvent based lustre paint of superior grade having (VOC < 50 Gms./Lit) OF APPROVED BRAND AND SHADE (ASIAN /BERGER /NEROLAC /SAICOAT /INDOCEM OR EUIVALENT) OVER ONE COAT OF PRIMER OF APP BRAND AFTER THOUROULY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDER MATERIALS INCLUDING COST OF ALL MATERIALS TO THE INTERIOR FACES OF WALLS AS DIECTED 2COATS BY DILUTING 1LIT OF EMULSION PAINT WITH A MAXIMUM 750ML OF WATER WITH AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS (TOTAL3 COATS) WITH SURFACE PREPARATION ETC., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, BRUSHES, LABOUR CHARGES, CURING, SCAFFOLDING LIFTING(MANUAL) AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK FOR FIRST FLOOR(APSS NO. 911)
PAINTING WITH Acrylic Emulsion paint Exterior grade silicon additives having (VOC < 50 Gms/Lit) OF APPROVED MAKE AND COLOUR TO THE EXTERIOR FACES OF WALLS AS DIECTED 2COATS BY DILUTING 1LIT OF EMULSION PAINT WITH A MAXIMUM 750 Ml OF WATER WITHIN AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS OVER 1COAT OF ASIAN EXTERIOR WALL PRIMER BY DILUTING 1LIT. OF PRIMER WITH 1LIT. OF WATER (TOTAL 3 COATS) WITH SURFACE PREPARATION Etc., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, BRUSHES, LABOUR CHARGES, CURING, SCAFFOLDING AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC.,BUT EXCLUDING GST,
FLOORING WITH NANO POLISHED /STAIN FREE SOLUBLE SALT PORCELAIN VITRIFIED TILES SCREEN PRINTED OF SIZE 600 X600 MM AND THICKNESS BETWEEN 8-10 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES ETC., COMPLETE, INCLUDING LIFTING (MANUAL) AND ALL LABOUR CHARGES, ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR FIRST FLOOR
PROVIDING SKIRTING TO INTERNAL WALLS TO 10 CM HEIGHT/RISERS OF STEPS WITH NANO POLISHED /STAIN FREE SOLUBLE SALT/ STAIN FREE PORCELAIN VITRIFIED TILES SCREEN PRINTED OF SIZE 600 X 600 MM AND THICKNESS BETWEEN 8-10 MM 1ST 1ST QUALITY LENGTH EQUAL TO FLOORING STONES, SET OVER BASE COAT OF CM (1:5) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., COMPLETE INCLUDING , ETC., COMPLETE FOR FINISHED ITEM OF WORK, FOR FIRST FLOOR
FLOORING WITH HIGH POLISHED GRANITE SLABS 16 TO 18MM THICK UPTO 8'-00"(2.43M) BLACK REGULAR COLOUR SET OVER BASE COAT OF CEMENT MORTAR (1:8), 20 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILESETC., COMPLETE, , LABOUR CHARGES FOR DRESSING OF TILES ETC., COMPLETE FOR FINISHED ITEM OF WORK, .FOR FIRST FLOOR KITCHEN PLATFORM
PROVIDING SKIRTING TO INTERNAL WALLS TO 15 CM HEIGHT / RISERS OF STEPS WITH HIGH POLISHED GRANITE SLAB16 TO 18MM THICK UPTO 8'-00"(2.43M) BLACK REGULAR LENGTH EQUAL TO FLOORING STONES, SET OVER BASE COAT OF CM (1:3) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., COMPLETE , ETC., COMPLETE FOR FINISHED ITEM OF WORK,FOR FIRST FLOOR KITCHEN PLAT FORM
FLOORING WITH FLAMED GRANITE SLABS OF 18MM THICK SET OVER BASE COAT OF CEMENT MORTAR (1:8), 20 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, , INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILESETC., COMPLETE, INCLUDING SEIGNIORAGE CHARGES, LABOUR CHARGES FOR DRESSING OF TILES ETC., COMPLETE FOR FINISHED ITEM OF WORK.FOR FIRST FLOOR STAIRCASE & ENTRANCE STEPS
PROVIDING SKIRTING TO INTERNAL WALLS TO 15 CM HEIGHT / RISERS OF STEPS FLAMED GRANITE SLABS OF 18MM THICK SET OVER BASE COAT OF CM (1:3) 12 MM THICK WITHWITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., COMPLETE , ETC., COMPLETE FOR FINISHED ITEM OF WORK, FOR FIRST FLOOR STAIRCASE & ENTRANCE STEPS
PROVIDING DODOOING TO INTERNAL WALLS WITH GLAZED RED OR WHITE FULL BODY CERAMIC WALL TILES OF SIZE 300 X 600 MM AND THICKNESS BETWEEN 6-8 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS I ST QUALITY, SET OVER BASE COAT OF CM (1:3) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., COMPLETE , ETC., COMPLETE FOR FINISHED ITEM OF WORK, FOR FIRST FLOOR
FLOORING WITH SUPPLY OF NON-SKID RED OR WHITE FULL BODY CERAMIC FLOOR TILES OF SIZE 300 X 300 MM AND THICKNESS BETWEEN 7-8 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS OR AS APPROVED BY THE ENGINEER - IN -CHARGE ,OF APPROVED PATTERN FOR FLOORING SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES, INCLUDING LIFTING (MANUAL) AND ALL LABOUR CHARGES, ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK, FOR FIRST FLOOR (APSS.NO:701&707).
SUPPLYING AND FIXING IN POSITION OF STAIRCASE RAILING AS PER DRAWING USING STAINLESS STEEL TUBES, SECTIONS, PLATES SHEETS & PIPES OF ALL DIAMETERS OF 304 GRADE INCLUDING LABOUR CHARGES FOR FABRICATION OF STAINLESS STEEL RAILING WORKS USING STAINLESS STEEL WELDING RODS INCLUDING BUFFING, POLISHING, LACQUER FINISHING, TO PRESENT SEAMLESS FINISH ETC., COMPLETE AS DIERCTED BY THE ENGINEER-IN-CHARGE FOR FINISHED ITEM OF WORK FOR FIRST FLOOR
SUPPLYING AND FIXING OF UNPLASTICISED POLY VINYL CHLORIDE (UPVC) 3TRACK SLIDING WINDOWS WITH MESH SHUTTER – (2-GLASS SHUTTERS AND 1- MESH SHUTTER) DULY MANUFACTURED USING UPVC REINFORCED PROFILES (COMPOSITION OF PROFILE SHALL CONSISTS A MINIMUM OF 5.5 PHR OF TIO2 AND NOT MORE THAN 12 PHR OF CACO3 FOR EVERY 100 PARTS OF PVC RESIN)OF (94 MM X 45 MM)/(80 MM X 52 MM) X 2.20 MM FOR OUTER FRAMES, (58 MM X 39 MM)/(54 MM X 38 MM) X 2.20 MM FOR SLIDING SHUTTER FRAMES CAPABLE OF MOUNTING SINGLE GLAZING SYSTEM STRUCTURALLY REINFORCED WITH HOT DIP GALVANIZED UP TO 50 MICRONS OF MINIMUM THICKNESS OF 1.0/1.2 MM PREFABRICATED & WELDED THROUGH FUSION WELDING. THE WINDOW SASH SHALL BE FITTED WITH 5 MM THICK CLEAR FLOAT GLASS OF REPUTED MAKE AND MESH SHUTTER FRAME SHALL BE (42 MM X 25 MM)/(52 MM X 21.5 MM) X 2.0 MM FITTED WITH VINYL COATED FIBRE MESH- ON ROLLERS/ PULLEY DULY FIXED WITH GREY COLOUR TPV GASKET FOR SASH & GLAZING BEAD SHALL BE CO-EXTRUDED WITH GREY COLOUR SOFT PVC. SYSTEM SHALL HAVE SINGLE POINT LOCKING WITH TOUCH LOCK AND THE SYSTEM IS TO BE INSTALLED AT THE SITE USING ANCHOR FASTENERS, SILICON RUBBER SEALANT, EASY GLAZING/ DEGLAZING AT SITE ETC., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, ACCESSORIES, LABOUR CHARGES FOR TRANSPORTATION, ERECTION AT SITE, BUT EXCLUDING GST. COMPLETE FOR FINISHED ITEM OF WORK. FOR ALL FLOORS
SUPPLYING AND FIXING OF UNPLASTICIZED POLY VINYL CHLORIDE (UPVC) 2 TRACK–2 PANEL SLIDING WINDOWS DULY MANUFACTURED USING UPVC REINFORCED PROFILES(COMPOSITION OF PROFILE SHALL CONSISTS A MINIMUM OF 5.5 PHR OF TIO2 AND NOT MORE THAN 12 PHR OF CACO3 FOR EVERY 100 PARTS OF PVC RESIN) OF (62 MM X 60 MM)/(60 MM X 45 MM) X 2.20 MM FOR OUTER FRAMES, (66 MM X 38 MM)/(58 MM X 39 MM) X 2.20 MM FOR SLIDING SHUTTER FRAMES CAPABLE OF MOUNTING SINGLE GLAZING SYSTEM, STRUCTURALLY REINFORCED WITH HOT DIP GALVANIZED UP TO 50 MICRONS OF MINIMUM THICKNESS OF 1.0/1.2 MM PREFABRICATED & WELDED THROUGH FUSION WELDING. THE WINDOW SASH SHALLBE FITTED WITH 5 MM THICK CLEAR FLOAT GLASS OF REPUTED MAKE DULY FIXED WITH GREY COLOUR TPV GASKET FOR SASH & GLAZING BEAD SHALL BE COEXTRUDED WITH GREY COLOUR SOFT PVC. SYSTEM SHALL HAVE SINGLE POINT LOCKING WITH TOUCH LOCK AND THE SYSTEM IS TO BE INSTALLED AT THE SITE USING ANCHOR FASTENERS, SILICON RUBBER SEALANT, EASY GLAZING/ DEGLAZING AT SITE ETC., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, ACCESSORIES, LABOUR CHARGES FOR TRANSPORTATION, ERECTION AT SITE COMPLETE FOR FINISHED ITEM OF WORK.
PAINTING TO NEW IRON WORK WITH ONE COAT OF RED OXIDE PRIMER COAT AND TWO COATS WITH SYNTHETIC ENAMEL PAINT OF APPROVED BRAND AND SHADE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR PREPARING AND CLEANING THE SURFACE OF DIRT WITH SOAP AND BRUSHES INCLUDING PUTTY, ALL INCIDENTAL, OPERATIONAL CHARGES ETC., COMPLETE (THE RATE INCLUDES TWO COATS OF PAINT AND ONE COAT PRIMER) BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK IN ALL FLOOR. (APSS NO.1201, 1207, 1212)
PAINTING TO NEW WOOD WORK TWO COATS WITH SYNTHETIC ENAMEL PAINT OVER ONE COAT OF WOOD PRIMER OF APPROVED BRAND AND SHADE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR PREPARING AND CLEANING THE SURFACE OF DIRT WITH SOAP AND BRUSHES INCLUDING PUTTY AND ALL INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING GST., (THE RATE INCLUDES ONE COAT OF WOOD PRIMER AND TWO COATS OF PAINT ) (APSS NO.1201, 1207, 1212).COMPLETE FOR FINISHED ITEM OF WORK
DOUBLE SHUTTER DOOR : MANUFACTURING,SUPPLYING AND FIXING OF PANNELED DOOR SHUTTER USING MEDIUM TEAKWOOD STYLES & TOP RAILS OF SIZE 100 X 35 MM,BOTTOM AND LOCK RAIL OF SIZE 150 X 35MM, PANNELS OF 20MM THICK INCLUDING SUPPLYING AND FIXING OF THE DOOR FRAME OF SIZE 1.20 X 2.10 M MADE WITH MEDIUM TEAK WOOD SCANTLINGS OF OF SIZE 125 X 75 MM INCLUDING 6 NOS. OF MS 'Z' HOLD FASTS OF 40X5 MM FLAT OF 230MM LONG EACH,INCLUDING 8 NOS. OF 125 MM M.S POWDER COATED BUTT HINGES, 2 NO.BRASS HEAVY DOOR STOPER, 2 NO. 200 MM LONG BRASS FANCY DOOR HANDLES , 2 NO. BRASS ALDROP OF SIZE 300 MM LONG , 4 NOS. OF 200 MM LONG BRASS TOWER BOLTS, WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, TRANSPORTATION TO SITE LABOUR CHARGES FOR MAKING AND FIXING FRAME AND SHUTTER INCLUDING EXTRA MINOR FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER-IN-CHRGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF BRASS , STANDARD MAKE, GOT APPROVED BY THE ENGINEER-IN-CHARGE) (APSS NO: 1001 & 1002) BUT EXCLUDING GST
INTERNAL DOOR (SINGLE SHUTTER): 1.050 X2.10M: SUPPLYING, POSITIONING AND FIXING OF ISI MARK, STANDARD MAKE, FLUSH DOOR SHUTTER OF 35 MM THICK WITH TEAK VENEER ONE SIDE AND COMMERCIAL PLY ON ANOTHER FACE INCLUDING DOOR FRAME MADE WITH MEDIUM TEAK WOOD SCANTLING OF SIZE 125 MM X 75 MM, 6 NOS. OF MS 'Z' HOLD FASTS OF SIZE 230 X 40 X 3 MM, 3 NOS. OF 125 MM BUTT HINGES, 2NOS. 150 MM LONG DOOR HANDLES, 1 NO. ALDROP OF SIZE 250 MM LONG, 1 NO. 200 MM LONG TOWER BOLTS, 1 NO. DOOR STOPPER WITH BOLTS, NUTS, NF SCREWS, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR MAKING THE FRAME AND FIXING FRAME AND SHUTTER, MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER-IN-CHRGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF ALUMINIUM, ISI MARK, GOT APPROVED BY THE ENGINEER-IN-CHARGE). (APSS NO: 1001&1002).
DOOR: 0.80X2.1 SUPPLY AND FIXING OF WPC SINGLE DOOR SHUTTER OF 30MM THICK FOR EXISTING DOOR FRAME OF WPC OF SIZE 100MM X 65 MM, INCLUDING 4NOS. OF 125 MM BUTT HINGES, 1 NO. DOOR STOPER, 2NOS. 150 MM LONG DOOR HANDLES, 2NOS ALDROP OF SIZE 300 MM LONG, 1NOS. OF 250 MM LONG TOWER BOLTS WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR FIXING THE FRAME AND SHUTTER ETC., INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER-IN-CHRGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF ALLUMINUM, ISI MARK, GOT APPROVED BY THE ENGINEER-IN-CHARGE) (APSSNO:1001&1002) BUT EXCLUDING GST
PROVIDING AND FIXING FACTORY MADE SOLID WOOD POLYMER COMPOSITE (WPC) SINGLE EXTRUDED DOOR FRAME SECTION OF 100*65 MM WITH ENCAPSULATION OF 6 MM RIGID LAYER ON ALL EXTERNAL SURFACES. THE DOOR FRAME WILL HAVE A REBATE OF 32MM/ 37 MM. THE TWO VERTICAL MEMBERS ARE TO BE JOINED TOGETHER WITH THE HORIZONTAL MEMBER USING 8X75 MM LONG MS STAR FULL THREAD SCREWS TO BE USED WITH REVERSE FORWARD SPEED CONTROL HAND DRILLING MACHINE THE READY/ASSEMBLED DOOR FRAME IS FIXED TO WALL USING Z HAND FAST 300 MM LONG HOLD FAST BUT EXCLUDING GST
PROVIDING, SUPPLYING & FIXING OF FIXED LOUVERED VENTILATOR MADE OUT OF MULTI CHAMBERED UPVC SECTIONS WITH GLAZING BEAD SHALL BE CO-EXTRUDED WITH GREY COLOUR SOFT PVC. HAVING ISOLATED DRAINAGE AND REINFORCED WITH GALVANIZED IRON PROFILES THROUGHOUT THE WINDOW. THE OUTERFRAME HAVING AN OVERALL SIZE OF 60 MM X 55 MM X 2.40 WITH REINFORCEMENT OF 1 MM THICKNESS ANDMULLION WITH OVERALL SIZE OF 74 MM X 60 MM X 2.40 MM WITH REINFORCEMENT OF 1 MM THICKNESS. (COMPOSITION OF PROFILE SHALL CONSISTS A MINIMUM OF 5.5 PHR OF TIO2 AND NOT MORE THAN 12 PHR OF CACO3 FOR EVERY 100 PARTS OF PVC RESIN).VENTILATOR SHALL BE PROVIDED WITH 4.5 MM PIN HEAD GLASS, STANDARD HARDWARE. WALL THICKNESS OF FRAME & MULLION SHALL BE 2.4 MM., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, ACCESSORIES, LABOUR CHARGES FOR TRANSPORTATION, ERECTION AT SITE BUT EXCLUDING GST COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING AND FIXING MS GRILLS FOR WINDOWS/VENTILATORS OF ALL SIZES AS DIRECTED BY THE ENGINEER-IN- CHARGE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES FOR FABRICATION, FIXING BUT EXCLUDING GST. COMPLETE FOR FINISHED ITEM OF WORK M.S.FLATS of ALL SIZES
SUPPLYING AND FIXING MS GRILLS FOR WINDOWS/VENTILATORS OF ALL SIZES AS DIRECTED BY THE ENGINEER-IN- CHARGE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES FOR FABRICATION, FIXING BUT EXCLUDING GST . COMPLETE FOR FINISHED ITEM OF WORK M.S. SQUARE BARS of ALL SIZES
SUPPLYING MS STRUCTURAL STEEL WORKS LIKE HEAVY STEEL WORKS LIKE TRUSSES, STANCHIONS, HEAVY BEAMS AND GIRDERS INCLUDING COST OF WELDING RODS, POWER CHARGES, FOR ERECTING & FIXING ALL STRUCTURAL STEEL WORKS LIKE HEAVY IRON GRILLS, TRUSSES, STANCHIONS, HEAVY BEAMS AND GIRDERS ERECTING IN POSITION AND FIXING BY USING CHAIN PULLEY BLOCKS, DEREK POLE ARRANGEMENTS AND CRANES ETC., COMPLETE IN POSITION ETC COMPLETE FOR ALL SIZES AS DIRECTED BY THE ENGINEER-IN- CHARGE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES FOR FABRICATION, FIXING ETC., COMPLETE FOR THE FINISHED ITEM OF WORK M.STUBES OF ALL SIZES
HALF ROUNDING THE EDGES OF GRANITE STONE SLABS OF ALL THICKNESS INCLUDING POLISHING THE SAME
SUPPLY AND FIXING OF 54.00MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL FLOW GUARD OR EQUIVALENT CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLY AND FIXING OF 22.20MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL FLOW GUARD OR EQUIVALENT CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLY AND FIXING OF 28.60MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL FLOW GUARD OR EQUIVALENT CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING AND FIXING 15MM BRASS BIB TAP CP FINISH - INDIAN MAKE HEAVY DUTY FULL TURN 300GMS AS DIRECTED BY THE ENGINEER-IN-CHARGE, INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING AND FIXING GM GATE (PEET) VALVES - 25 MM NB SIZEINDIAN MAKE HEAVY DUTY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK
SUPPLYING AND FIXING GM GATE (PEET) VALVES - 20 MM NB SIZEINDIAN MAKE HEAVY DUTY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK
SUPPLYING AND FIXING 76.2MM (3") DIA UV RESISTANT UPVC SWR NAHANI TRAP WITH JALI OF APPROVED ISI BRAND INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING AND LAYING 75 MM DIA SINGLE SOCKET PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND LABOUR CHARGES FOR LAYING, FIXING, AND COMMISSIONING THE PVC PIPES INCLUDING COUPLERS/ BENDS/TEES ETC., INCLUDING FIXING NECCESSARY FITTINGS LIKE BENDS, PLUGS, COUPLERS, JUNCTIONS, TEES ETC., WITH SOLVENT JOINTING AS PER STANDARDS INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST., COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING AND FIXING APPROVED MAKE WASH DOWN EUROPEAN WATER CLOSET OF 1ST QUALITY CONFORMING TO IS:2556-PART-2-2004 OF WHITE GLAZED WITH 'P' TRAP, INCLUDING SUPPLYING AND FIXING BEST INDIAN MAKE PLASTIC SEAT AND LID FOR EUROPEAN WATER CLOSETS WITH RUBBER OR PLASTIC BUFFERS AS PER IS 2548-1996 AND SUPPLY & FIXING OF PVC LOW LEVEL SYSTEM WITH INTERNAL COMPONENTS & SHORT BEND: 8 LITERS CAPACITY SINGLE FLUSH & SUPPLYING & FIXING 15 MM NOMINAL SIZE PVC CONNECTION WITH BRASS UNION NUT C.P COATED INCLUDING CUTTING THE WALLS AND FLOORS AND MAKING GOOD THE SAME, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK
SUPPLYING & FIXING INDIAN MAKE FLAT BACK WASH HAND BASIN 1ST QUALITY CONFORMING TO IS:2556-PART-4:1972 WITH WASTE FITTINGS LIKE RUBBER PLUG, CHAIN, 32 MM NOMINAL SIZE C.P. FITTING WITH PARALLEL PIPE THREAD CONFORMING TO IS:2963-1979 AND FITTED WITH 15 MM NOMINAL BORE CHROMIUM PLATED PILLAR TAP OF 1ST QUALITY INDIAN MAKE 400 GRAMS COMPLETE WITH STANDARD CI BRACKETS INCLUDING WOODEN BLOCK: 550 X 400 MM - SINGLE C.P. PILLAR COCK AS APPROVED BY EXECUTIVE ENGINEER WITH WASTE FITTINGS LIKE RUBBER PLUG, CHAIN, AND PAINTING TO ALL IRON FITTINGS WITH 2 COATS OF SYNTHETIC ENAMEL PAINT OF APPROVED COLOUR AND MAKE INCLUDING CUTTING THE WALLS WHEREVER NECESSARY AND MAKING THE SAME GOOD FOR FINISHED ITEM OF WORK. INCLUDING WOODEN BLOCK INCLUDING CUTTING THE WALLS WHEREVER NECESSARY AND MAKING THE SAME GOOD. BUT EXCLUDING GST., FOR FINISHED ITEM OF WORK
S&F OF CHROMIUM PLATED FINISH BRASS BODY QUARTER TURN BIBCOCK CUM HEALTH FAUCET WITH 1M LONG TUBE AND WALL HOOK WITH 10 YEARS WARRANTY ,INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST ., COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING AND FIXING BEST INDIAN MAKE 609.6X457.2mm T.V SHAPE MIRROR WITH PLASTIC FRAME MIRROR INCLUDING WOODEN BLOCKS, SCREWS ETC., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK
SUPPLYING AND LAYING 110 MM DIA SINGLE SOCKET PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND JOINTED WITH SOLVENT CEMENT INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, AND LABOUR CHARGES FOR LAYING, FIXING, AND COMMISSIONING THE PVC PIPES INCLUDING COUPLERS/ BENDS/TEES ETC., INCLUDING FIXING NECCESSARY FITTINGS LIKE BENDS PLUGS, COUPLERS, JUNCTIONS, TEES ETC., WITH SOLVENT JOINTING AS PER STANDARDS,INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST., COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING AND FIXING NP SOAP DISH HEAVY TYPE WITH NP SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST., COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING AND FIXING 19.04 MM DIA, 609.60 MM LONG ALUMINUM ANODISED TOWEL ROD WITH BRACKETS AND SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK .
SUPPLYING AND FIXING OF 150MMX100MM SWG GULLY TRAP CONFIRMING TO ISI 651 & 4127 WITH CI GRATING AND CONSTRUCTION OF BRICK MASONRY INTERMEDIATE CHAMBER OF SIZE 20"X14"X12" IN CM (1:6) OVER CC (1:5:10) PROP. BED OF SIZE 20"X14"X4" AND PLASTERING WITH 12MM THICK IN CM (1:4) PROP. BOTH INSIDE AND OUTSIDE SURFACES AND FITTED WITH 9"X12" (230X305MM) RCC (1:11/2:3) 1 1/2" THICK COVER INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, FOR FINISHED ITEM OF WORK COMPLETE.
CONSTRUCTING 1'-6" X 1'-6" BRICK MASONARY INSPECTION CHAMBER WITH CM (1:6) PROP. USING FLY ASH BRICKS OF 225MM THICK , AND FITTED WITH 457.2 X 457.2 MM (1'-6'' X 1'-6") RCC COVER UP TO A DEPTH OF 914.4 MM (3'-0") AND LAYING CEMENT CONCRETE (1:4:8) 150 MM THICK USING 40 MM HBG METAL AND PCC (1:2:4) BENCHING AND CHANNEL 100 MM THICK INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, SAND, BRICKS, WATER ETC.,TO SITE ,COST OF LABOUR CHARGES LIKE MIXING CEMENT MORTAR, CONSTUCTING MASONARY, LIFT CHARGES, CURING ETC., COMPLETE INCLUDING COST OF STEEL AND ITS FABRICATION, BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, FOR FINISHED ITEM OF WORK AS PER STANDARD SPECIFICATION
PROVIDING AND PLACING ON TERRACE POLYTHELENE WATER STORAGE TANKS (AT ALL FLOOR LEVELS) DOUBLE LAYER APPROVED BRAND AND MNUFACTURE WITH COVER AND SUITABLE LOCKING ARRANGEMENTS MAKING NECESSARY HOLES FOR INLET & OUTLETS AND OVERFLOW PIPES BUT WITHOUT FITTINGS & BASE SUPPORT FOR TANKS, MAKING GOOD THE SAME TO ENSURE LEAK PROOF WITH AN APPROPRIATE MASONARY PLATFORM INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK AS DIRECTED BY THE ENGINEER -IN- CHARGE
SUPPLY AND FIXING OF 28.60MM OD PIPE - SDR 13.5 ASHIRVAD / ASTRAL FLOW GUARD OR EQUIVALENT CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 13.5 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLY AND FIXING OF22.20MM OD PIPE - SDR 13.5 ASHIRVAD / ASTRAL FLOW GUARD OR EQUIVALENT CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 13.5 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.
CONSTRUCTING 914.0 MM ( 3'-0") DIA BRICK MASONARY MAN HOLE AS PER IS-4111:PART-1:1986 WITH CM (1:6) PROP. USING FLY ASH BRICKS OF 225MM THICK FROM APPROVED SOURCE HAVING A MINIMUM CRUSHING STRENGTH OF 5N/SQ.MM INCLUDING PLASTERING WIH CM(1:3) PROP. 12 MM THICK BOTH INSIDE AND OUTSIDE, FITTED WITH 20'' DIA RCC COVERS AND FRAMES, INCLUDING EXCAVATING PITS UP TO A DEPTH OF 914.4 MM (3'-0") IN ALL SORTS OF SOILS (EXCLUDING ROCK) AND LAYING CEMENT CONCRETE (1:4:8) 150 MM THICK USING 40 MM HBG METAL AND PCC (1:2:4) BENCHING AND CHANNEL 100 MM THICK AS PER STANDARD SPECIFICATION AND INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, COST OF ALL INCIDENTAL AND OPERATIONAL, LABOUR CHARGES LIKE MIXING CEMENT MORTAR, CONSTRUCTING MASONRY, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK AS PER STANDARD SPECIFICATION.
CONSTRUCTING 914.0 MM ( 3'-0") DIA BRICK MASONARY MAN HOLE AS PER IS-4111:PART-1:1986 WITH CM (1:6) PROP. USING FLY ASH BRICKS OF 225MM THICK FROM APPROVED SOURCE HAVING A MINIMUM CRUSHING STRENGTH OF 5N/SQ.MM INCLUDING PLASTERING WIH CM(1:3) PROP. 12 MM THICK BOTH INSIDE AND OUTSIDE, FITTED WITH 20'' DIA RCC COVERS AND FRAMES, INCLUDING EXCAVATING PITS UP TO A DEPTH OF 1524 MM (5'-0") IN ALL SORTS OF SOILS (EXCLUDING ROCK) AND LAYING CEMENT CONCRETE (1:4:8) 150 MM THICK USING 40 MM HBG METAL AND PCC (1:2:4) BENCHING AND CHANNEL 100 MM THICK AS PER STANDARD SPECIFICATION AND INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, COST OF ALL INCIDENTAL AND OPERATIONAL, LABOUR CHARGES LIKE MIXING CEMENT MORTAR, CONSTRUCTING MASONRY, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK AS PER STANDARD SPECIFICATION.
SUPPLYING, LAYING, JOINTING AND TESTING OF 152.40 MM DIA SWG SP-1 PIPES OF ISI MAKE CONFIRMING TO ISI:651&4127, WITH AIRTIGHT CEMENT JOINTS IN CM(1.5:1) PROP. INCLUDING EXCAVATION OF TRENCHES AND SOCKET PITS IN ANY SOIL (EXCEPT ROCK REQUIRING BLASTING) UP TO 1.52M (5'-0") DEPTH AND REFILLING WITH EXCAVATED SOILS, WATERING, TAMPING, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST , COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING, LAYING, JOINTING AND TESTING OF 110 MM DIA PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, AND JOINTING WITH SOLVENT CEMENT INCLUDING EXCAVATION OF TRENCHES AND SOCKET PITS IN ANY SOIL (EXCEPT ROCK REQUIRING BLASTING) UP TO 0.91M DEPTH AND REFILLING WITH EXCAVATED SOILS, WATERING, TAMPING, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST., COMPLETE FOR FINISHED ITEM OF WORK.
EARTH WORK EXCAVATION AND DEPOSITING ON BANK, FOR ALL LIFTS AND WITH AN INITIAL LEAD OF 10M INCLUDING ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS SHORING, SHEETING, PLANKING, STRUTTING, DEWATERING SITE CLEARANCE, CLEARING SHURBS, BRUSHWOOD, UNDER GROWTH AND SMALL TREES NOT EXCEEDING 300 MM GIRTH, MEASURED AT ONE METRE ABOVE GROUND ETC., COMPLETE FOR FINISHED ITEM OF WORK INCLUDING DEWATERING CHARGES ETC AS PER SS - 20 B FOR STIFF BLOCK COTTON SOIL , HARD RED EARTH, MURRAM, ORDINARY GRAVEL - MANUAL MEANS UP TO 3M DEPTH FOR OPEN EXCAVATION -EXCLUDING GST. (APSS 308).
CEMENT CONCRETE (1:4:8) PROP. USING 40MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR FOUNDATIONS .(APSS NO: 402).
RE-FILLING WITH USEFUL AVAILABLE EXCAVATED EARTH OTHER THAN EXPANSIVE SOILS LIKE RED EARTH AND ORDINARY GRAVEL ETC., (EXCLUDING ROCK) IN TRENCHES, SIDES OF FOUNDATIONS AND BASEMENT WITH INITIAL LEAD IN LAYERS NOT EXCEEDING 15 CM THICK, CONSOLIDATING EACH DEPOSITED LAYER BY WATERING AND RAMMING INCLUDING COST AND CONVEYANCE OF WATER TO WORK SITE AND ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES , HIRE CHARGES OF T & P ETC., BUT EXCLUDING GST - COMPLETE FOR FINISHED ITEM OF WORK. (APSS NO. 309 & 310)
SUPPLYING AND LAYING 75 MM DIA SINGLE SOCKET PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND LABOUR CHARGES FOR LAYING, FIXING, AND COMMISSIONING THE PVC PIPES INCLUDING COUPLERS/ BENDS/TEES ETC., INCLUDING FIXING NECCESSARY FITTINGS LIKE BENDS, PLUGS, COUPLERS, JUNCTIONS, TEES ETC., WITH SOLVENT JOINTING AS PER STANDARDS INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST , COMPLETE FOR FINISHED ITEM OF WORK -FOR SEPTIC TANK
CEMENT CONCRETE (1:2:4) PROP. USING 20MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR SEPTIC TANK (APSS NO: 402).
VRCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR TOP SLAB 125MM OF SEPTIK TANK
VRCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR BOTTOM SLAB 200 MM
VRCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR SIDE WALLS 230 MM
ORNAMENTAL PLASTERING 12MM THICK WITH A BASE COAT OF 8 MM THICK IN CM (1:5) PROP. AND FINISH COAT OF 4MM THICK IN CM (1:3) PROP. WITH DUBARA SPONGE FINISHING COMPLETE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING (MANNUAL), CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE. FOR FINISHED ITEM OF WORK (APSS NO: 901 & 904) GROUND FLOOR
PLASTERING TO SUPERSTRUCTURE 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. with sponze finishing, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE.FOR FINISHED ITEM OF WORK. GROUND FLOOR (APSS NO: 901&904)
PROVIDING IMPERVIOUS COAT TO EXPOSED RCC ROOF SLAB SURFACE IN CM(1:3), 20MM THICK WITH 1KG OF WATER PROOF COMPOUND PER BAG OF CEMENT LAID OVER ROOF WHEN IT IS GREEN, INCLUDING COST OF ALL MATERIALS, COST & CONVEYANCE OF ALL MATERIALS, INCIDENTAL, OERATIONAL AND LABOUR CHARGES FOR MIXING MORTAR, LAYING, RENDERING SMOOTH AND THREAD LINING, CURING, ROUNDING OFF JUNCTIONS OF WALL AND SLAB ETC,, BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. SEPTIC TANK (APSS.NO: 901&903)
MASONRY WORK IN CM (1:6) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 225 X 140 MM FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SCAFFOLDING AND CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR SUPERSTRUCTURE WALLS OF 225MM THICK GROUND FLOOR FOR FINISHED ITEM OF WORK(APSS NO. 501&504)
PROVIDING "HYSD/TMT" STEEL BARS OF DIFFERENT DIAMETERS BELOW 36MM DIAMETER Fe 500 GRADE (AS PER IS 1786 - 2008 AND ALL ITS LATEST AMMENDMENTS) FROM Steel Manufacturers with minimum installed Production Capacity of 2 Lakh MT/annum to 10 Lakh MT Per annum (GOEL, SHYAM, JAI BALAJI, AFSTAR/MSLIFE TMT, RADHA TMT, SUGNA TMT, SHREE TMT) FOR REINFORCEMENT INCLUDING CUTTING, BENDING TO REQUIRED SIZES AND SHAPES, PLACING THEM IN POSITION WITH COVER BLOCKS OF APPROVED SHAPE AND SIZE, TYING FIRMLY WITH M.S BINDING WIRE OF SWG, FORMING GRILLS FOR REINFORCEMENT WORKS AS PER APPROVED DESIGNS AND DRAWINGS TO BE SUPPLIED AT THE TIME OF EXECUTION OF WORK INCLUDING COST AND CONVEYANCE OF DEFORMED BARS, BINDING WIRE, COVER BLOCKS AND ALL WASTAGES SUCH AS OVER LAPS, COUPLINGS, WELDED JOINTS, CHAIRS, SPACE BARS ETC., AS DIRECTED BY THE ENGINEER-IN-CHARGE AND ALL OPERATIONAL, INCIDENTAL LABOUR CHARGES SUCH AS CUTTING, BENDING, PLACING IN POSITION, TYING ETC., EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK FOR ALL LENGTHS AS PER DRAWINGS AND TECHNICAL SPECIFICATIONS FOR BARS BELOW 36MM DIA WHERE THEY ARE NOT WELDED.
EARTH WORK EXCAVATION AND DEPOSITING ON BANK, FOR ALL LIFTS AND WITH AN INITIAL LEAD OF 10M INCLUDING ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS SHORING, SHEETING, PLANKING, STRUTTING, DEWATERING SITE CLEARANCE, CLEARING SHURBS, BRUSHWOOD, UNDER GROWTH AND SMALL TREES NOT EXCEEDING 300 MM GIRTH, MEASURED AT ONE METRE ABOVE GROUND ETC., COMPLETE FOR FINISHED ITEM OF WORK INCLUDING DEWATERING CHARGES ETC AS PER SS - 20 B FOR STIFF BLOCK COTTON SOIL , HARD RED EARTH, MURRAM, ORDINARY GRAVEL - MANUAL MEANS UP TO 3M DEPTH FOR OPEN EXCAVATION -EXCLUDING GST. (APSS 308).
CEMENT CONCRETE (1:4:8) PROP. USING 40MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR FOUNDATIONS .(APSS NO: 402).
RE-FILLING WITH USEFUL AVAILABLE EXCAVATED EARTH OTHER THAN EXPANSIVE SOILS LIKE RED EARTH AND ORDINARY GRAVEL ETC., (EXCLUDING ROCK) IN TRENCHES, SIDES OF FOUNDATIONS AND BASEMENT WITH INITIAL LEAD IN LAYERS NOT EXCEEDING 15 CM THICK, CONSOLIDATING EACH DEPOSITED LAYER BY WATERING AND RAMMING INCLUDING COST AND CONVEYANCE OF WATER TO WORK SITE AND ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES , HIRE CHARGES OF T & P ETC., BUT EXCLUDING GST - COMPLETE FOR FINISHED ITEM OF WORK. (APSS NO. 309 & 310)
SUPPLYING AND LAYING 75 MM DIA SINGLE SOCKET PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND LABOUR CHARGES FOR LAYING, FIXING, AND COMMISSIONING THE PVC PIPES INCLUDING COUPLERS/ BENDS/TEES ETC., INCLUDING FIXING NECCESSARY FITTINGS LIKE BENDS, PLUGS, COUPLERS, JUNCTIONS, TEES ETC., WITH SOLVENT JOINTING AS PER STANDARDS INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST , COMPLETE FOR FINISHED ITEM OF WORK -FOR SEPTIC TANK
CEMENT CONCRETE (1:2:4) PROP. USING 20MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR SEPTIC TANK (APSS NO: 402).
VRCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR TOP SLAB 125MM OF SEPTIK TANK
VRCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR BOTTOM SLAB 200 MM
VRCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR SIDE WALLS 230 MM
ORNAMENTAL PLASTERING 12MM THICK WITH A BASE COAT OF 8 MM THICK IN CM (1:5) PROP. AND FINISH COAT OF 4MM THICK IN CM (1:3) PROP. WITH DUBARA SPONGE FINISHING COMPLETE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING (MANNUAL), CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE. FOR FINISHED ITEM OF WORK (APSS NO: 901 & 904) GROUND FLOOR
PLASTERING TO SUPERSTRUCTURE 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. with sponze finishing, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE.FOR FINISHED ITEM OF WORK. GROUND FLOOR (APSS NO: 901&904)
PROVIDING IMPERVIOUS COAT TO EXPOSED RCC ROOF SLAB SURFACE IN CM(1:3), 20MM THICK WITH 1KG OF WATER PROOF COMPOUND PER BAG OF CEMENT LAID OVER ROOF WHEN IT IS GREEN, INCLUDING COST OF ALL MATERIALS, COST & CONVEYANCE OF ALL MATERIALS, INCIDENTAL, OERATIONAL AND LABOUR CHARGES FOR MIXING MORTAR, LAYING, RENDERING SMOOTH AND THREAD LINING, CURING, ROUNDING OFF JUNCTIONS OF WALL AND SLAB ETC,, BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. SEPTIC TANK (APSS.NO: 901&903)
PROVIDING "HYSD/TMT" STEEL BARS OF DIFFERENT DIAMETERS BELOW 36MM DIAMETER Fe 500 GRADE (AS PER IS 1786 - 2008 AND ALL ITS LATEST AMMENDMENTS) FROM Steel Manufacturers with minimum installed Production Capacity of 2 Lakh MT/annum to 10 Lakh MT Per annum (GOEL, SHYAM, JAI BALAJI, AFSTAR/MSLIFE TMT, RADHA TMT, SUGNA TMT, SHREE TMT) FOR REINFORCEMENT INCLUDING CUTTING, BENDING TO REQUIRED SIZES AND SHAPES, PLACING THEM IN POSITION WITH COVER BLOCKS OF APPROVED SHAPE AND SIZE, TYING FIRMLY WITH M.S BINDING WIRE OF SWG, FORMING GRILLS FOR REINFORCEMENT WORKS AS PER APPROVED DESIGNS AND DRAWINGS TO BE SUPPLIED AT THE TIME OF EXECUTION OF WORK INCLUDING COST AND CONVEYANCE OF DEFORMED BARS, BINDING WIRE, COVER BLOCKS AND ALL WASTAGES SUCH AS OVER LAPS, COUPLINGS, WELDED JOINTS, CHAIRS, SPACE BARS ETC., AS DIRECTED BY THE ENGINEER-IN-CHARGE AND ALL OPERATIONAL, INCIDENTAL LABOUR CHARGES SUCH AS CUTTING, BENDING, PLACING IN POSITION, TYING ETC., EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK FOR ALL LENGTHS AS PER DRAWINGS AND TECHNICAL SPECIFICATIONS FOR BARS BELOW 36MM DIA WHERE THEY ARE NOT WELDED.
SUPPLY AND FIXING OF ISI 25MM OUTER DIA HEAVY GRADE WITH IS:9537 PART 3 RIGID PVC PIPE CONCEALED IN ROOF SLABS WITH ALL REQUIRED ACCESSORIES INCLUDING LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST. MAKES : SUDHAKAR / MODI / VIP/PRECISION.
SUPPLY AND FIXING OF ISI 25MM OUTER DIA HEAVY GRADE WITH IS:9537 PART 3 RIGID PVC PIPE CONCEALED IN WALL WITH ALL REQUIRED ACCESSORIES [LIKE 'U' NAILS, JUNCTION BOX, PVC BENDS AND CEMENT] INCLUDING MASONARY WORK FOR LIGHT, FAN, COMMON, SEPARATE PLUG POINT AND SWITCH / POWER BOARDS ETC., INCLUDING ALL LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST. MAKES: SUDHAKAR / MODI / VIP/PRECISION.
SUPPLY AND FIXING OF ISI 25MM OUTER DIA HEAVY GRADE WITH IS:9537 PART 3 RIGID PVC PIPE CONCEALED IN UNDERNEETH THE FLOOR WITH ALL REQUIRED ACCESSORIES INCLUDING MASONARY WORK AND LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST. MAKES: SUDHAKAR / MODI / VIP/PRECISION.
WIRING WITH 2 RUNS OF 1.5 SQMM HFFR PVC INSULATED 1100V GRADE AS PER IS:694/2010, IS 17048 SPECIFICATION FOR COPPER CABLE IN EXISTING PIPE WITH 6A / 10A 1 WAY 1 MODULE MODULAR SWITCH CONTROL WITH SUITABLE MODULE HOT DIP GALVANIZED MODULAR TYPE METAL BOX COVERED WITH SUITABLE MODULAR COVER FRAME, WITH 3 PLATE JUMBO CEILING ROSE INCLUDING ALL LABOUR CHARGES ETC., COMPLETE FOR LIGHT AND BELL POINTS IN RESIDENTIAL BUILDINGS BUT EXCLUDING GST. COPPER CABLE MAKE: RR KABEL / SUDHAKAR / NAKODA/KEI/POLYCAB. MODULAR SWITCH, SOCKET, METAL BOX & COVER FRAME MAKE: LEGRAND LYNCUS/GM FOUR FIVE/GOLD MEDAL CURVE/ANCHOR ROMA PLUS CEILING ROSE MAKE: GOLD MEDAL OLIVE / MILLION ZOOM / ANCHOR PENTA CHERRY.
WIRING WITH 3 RUNS OF 1.5 SQMM HFFR PVC INSULATED 1100V GRADE AS PER IS:694/2010, IS 17048 SPECIFICATION FOR COPPER CABLE IN EXISTING PIPE WITH 6A / 10A 1 WAY 1 MODULE MODULAR SWITCH CONTROL WITH SUITABLE MODULE HOT DIP GALVANIZED MODULAR TYPE METAL BOX COVERED WITH SUITABLE MODULAR COVER FRAME, WITH 3 PLATE JUMBO CEILING ROSE INCLUDING ALL LABOUR CHARGES ETC., COMPLETE FOR CEILING FAN AND EXHAUST FAN POINTS IN RESIDENTIAL BUILDINGS BUT EXCLUDING GST. COPPER CABLE MAKE: RR KABEL / SUDHAKAR / NAKODA/KEI/POLYCAB. MODULAR SWITCH, SOCKET, METAL BOX & COVER FRAME MAKE: LEGRAND LYNCUS/GM FOUR FIVE/GOLD MEDAL CURVE/ANCHOR ROMA PLUS CEILING ROSE MAKE: GOLD MEDAL OLIVE / MILLION ZOOM / ANCHOR PENTA CHERRY.
WIRING WITH 2 RUNS OF 1.5 SQMM HFFR PVC INSULATED 1100V GRADE AS PER IS:694/2010, IS 17048 SPECIFICATION FOR COPPER CABLE IN EXISTING PIPE WITH 6A / 10A 1 WAY 1 MODULE MODULAR SWITCH CONTROL WITH SUITABLE MODULE HOT DIP GALVANIZED MODULAR TYPE METAL BOX COVERED WITH SUITABLE MODULAR COVER FRAME, WITH 3 PLATE JUMBO CEILING ROSE INCLUDING ALL LABOUR CHARGES ETC., COMPLETE FOR LIGHT AND BELL POINTS IN NON-RESIDENTIAL BUILDINGS FOR STAIR CASE POINTS IN RESIDENTIAL BUILDINGS BUT EXCLUDING GST. COPPER CABLE MAKE: RR KABEL / SUDHAKAR / NAKODA/KEI/POLYCAB. MODULAR SWITCH, SOCKET, METAL BOX & COVER FRAME MAKE: LEGRAND LYNCUS/GM FOUR FIVE/GOLD MEDAL CURVE/ANCHOR ROMA PLUS CEILING ROSE MAKE: GOLD MEDAL OLIVE / MILLION ZOOM / ANCHOR PENTA CHERRY.
SUPPLY AND FIXING OF 6 / 10A 3/2 PIN 2 MODULE MODULAR SOCKET WITH SHUTTER. WITH 6 / 10A 1 WAY 1 MODULE MODULAR SWITCH CONTROL ON A COMMON SWITCH BOARD WITH SUITABLE MODULE HOT DIP GALVANIZED MODULAR METAL BOX COVERED WITH SUITABLE MODULAR COVER FRAME WITH EARTH CONTINUITY INCLUDING WIRE LEADS, EARTH CONNECTIONS ALONG WITH ALL LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST. MODULAR SWITCH, SOCKET, METAL BOX & COVER FRAME MAKE: LEGRAND LYNCUS/GM FOUR FIVE/GOLD MEDAL CURVE/ANCHOR ROMA PLUS
SUPPLY AND FIXING OF 20A 2 MODULE MODULAR SOCKET WITH SHUTTER AND 16A / 20A 1 WAY 1 MODULE MODULAR SWITCH DULY RECESSED IN WALL WITH 3 MODULE HOT DIP GALVANIZED MODULAR METAL BOX SIZE COVERED WITH 3 MODULAR COVER FRAME INCLUDING EARTH CONNECTIONS AND ALL LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST. [POWER PLUG] MODULAR SWITCH, SOCKET, METAL BOX & COVER FRAME MAKE: LEGRAND LYNCUS/GM FOUR FIVE/GOLD MEDAL CURVE/ANCHOR ROMA PLUS
SUPPLY AND FIXING DISTRIBUTION BOARD WITH 20A SP PLUG AND SOCKET WITH SS ENCLOSURE WITH 10/16/20A 10KA SP MCB, C/D CURVE ISI MARK INCLUDING INTERNAL CONNECTION AND LABOUR CHARGES FOR SURFACE / FLUSH MOUNTING ETC., COMPLETE BUT EXCLUDING GST.20A SP PLUG AND SOCKET MAKE: HAVELLS/HPL/INDO ASIAN(GOLD PLUS) / C&S MCB MAKE: ABB/HAVELLS/C&S
SUPPLY AND RUN OF 3 OF 2.5 SQMM HFFR PVC INSULATED 1100V GRADE AS PER IS:694 / 2010, IS 17048 SPECIFICATION FOR COPPER CABLE IN EXISTING PIPE FOR 2 RUNS OF MAINS & 1 RUN OF EARTH CONTINUITY INLCUDING ALL LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST. MAKE: RR KABEL / SUDHAKAR / NAKODA/KEI/POLYCAB.
SUPPLY AND RUN OF 3 OF 4.0 SQMM HFFR PVC INSULATED 1100V GRADE AS PER IS:694 / 2010, IS 17048 SPECIFICATION FOR COPPER CABLE IN EXISTING PIPE FOR 2 RUNS OF MAINS & 1 RUN OF EARTH CONTINUITY INLCUDING ALL LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST. MAKE: RR KABEL / SUDHAKAR / NAKODA/KEI/POLYCAB.
SUPPLY AND RUN OF 3 OF 6.0 SQMM HFFR PVC INSULATED 1100V GRADE AS PER IS:694 / 2010, IS 17048 SPECIFICATION FOR COPPER CABLE IN EXISTING PIPE FOR 2 RUNS OF MAINS & 1 RUN OF EARTH CONTINUITY INLCUDING ALL LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST. MAKE: RR KABEL / SUDHAKAR / NAKODA/KEI/POLYCAB.
SUPPLY AND RUN OF 5 OF 10.0 SQMM HFFR PVC INSULATED 1100V GRADE AS PER IS:694 / 2010, IS 17048 SPECIFICATION FOR COPPER CABLE IN EXISTING PIPE FOR 4 RUNS OF MAINS & 1 RUN OF EARTH CONTINUITY INLCUDING ALL LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST. MAKE: RR KABEL / SUDHAKAR / NAKODA/KEI/POLYCAB.
SUPPLY AND FIXING OF BATTEN HOLDER / SLANTING HOLDER IN LIEU OF CEILING ROSE OF LIGHT POINT COMPLETE WITH ALL CONNECTIONS AND ALL LABOUR CHARGES WITHOUT BULB (FOR NEW INSTALLATION) BUT EXCLUDING GST. BH MAKE: GOLD MEDAL OLIVE / MILLION ZOOM / ANCHOR PENTA CHERRY.
SUPPLY, TRANSPORTATION OF ENERGY EFFICIENT FAN, 1200 MM SWEEP, ALUMINIUM BODY, CONSUMING 28 W, BEE 5 STAR RATED, CEILING FAN WITH BRUSH LESS DIRECT CURRENT (BLDC) MOTOR, CLASS OF INSULATION: B, 3 NO'S BLADES, 30 CM LONG DOWN ROD, 2 NO'S CANOPIES, SHACKLE'KIT, COPPER WINDING, POWER FACTOR GREATER THAN 0.90, SERVICE VALUE (CMMAV) GREATER THAN 8.0, AIR DELIVERY MINIMUM 235 CMM, 350 RPM (TOLERANCE AS PER IS:374-2019), THD LESS THAN 10%. WITH REMOTE OR COMPATIBLE TO ELECTRONIC STEP TYPE REGULATOR UNIT FOR SPEED CONTROL AND ALL REMAINING ACCESSORIES INCLUDING SAFETY PIN, NUT BOLTS, WASHERS, TEMPERATURE RISE=75°C(MAX), INSULATION RESISTANCE MORE THAN 2 MEGA OHM, SUITABLE FOR 230V, 50 HZ, SINGLE PHASE AC SUPPLY, EARTHING ETC., INCLUDING ALL STANDARD ACCESSORIES ETC., COMPLETE BUT EXCLUDING GST. MAKES : CROMPTON / HAVELLS / ORIENT.
SUPPLY OF 2 MODULE MODULAR TYPE ELECTRONIC FAN REGULATOR WITH 2 MODULE HOT DIP GALVANIZED MODULAR METAL BOX COVERED WITH 2 MODULAR COVER FRAME ETC., COMPLETE BUT EXCLUDING GST. MAKE: LEGRAND LYNCUS/GM FOUR FIVE/GOLD MEDAL CURVE/ANCHOR ROMA PLUS
LABOUR CHARGES FOR FIXING OF CEILING FAN AND REGULATOR INCLUDING TRANSPORTATION AND GIVING CONNECTIONS WITH TWIN CORE WIRE ETC., COMPLETE BUT EXCLUDING GST.
SUPPLY AND FIXING OF 12 / 15 MS PLAIN ROD FAN HOOK WITH ALL REQUIRED ACCESSORIES ETC., COMPLETE BUT EXCLUDING GST.
SUPPLY AND ERECTING 19/20MM STEEL TUBE DOWN ROD OF REQUIRED LENGTH WITH BOLTS & NUTS DULY PAINTED WITH MATCHING COLOUR OF FAN ETC., COMPLETE BUT EXCLUDING GST.
SUPPLY OF 9" (225 MM +/- 5%) LIGHT DUTY EXHAUST FAN WITH METAL BLADES ETC., COMPLETE BUT EXCLUDING GST. MAKE : CROMPTON / HAVELLS VENTILLAIR DB/ORIENT HILL AIR
LABOUR CHARGES FOR FIXING OF EXHAUST FAN IN WALL WITH NECESSARY CONNECTIONS ETC., COMPLETE BUT EXCLUDING GST. (FOR HOLE ALREADY MADE AVAILABLE)
SUPPLY AND TRANSPORTATION OF 20W +/- 10%, >/ 2000 LUMENS, 1200MM LENGTH LED RETRO TUBE LIGHT, HOUSING MADE WITH ALLUMINIUM ANODISED BODY, WIDE OPERATING VOLTAGE WITH DOUBLE SIDE CONNECTION, PF≥0.9, SURGE PROTECTION: > 2KV, THD<15%, WITH INBUILT DRIVER AND FROSTED COVER CCT: 3000K - 6500K AS DESIRED BY THE DEPARTMENT AND AS PER IS SPECIFICATIONS, MINIMUM CRI≥80 ETC., COMPLETE WITH 5 YEARS WARRANTY WITH BIS CERTIFICATION.LUMINAIRE MAKE: CROMPTON /HAVELLS / OSRAM/WIPRO LED MAKE: : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM.
FIXING OF 20W LED TUBE LIGHT LUMINAIRE ON WALL / CEILING WITH ALL ACCESSORIES INCLUDING GIVING CONNECTIONS AND ALL LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST.
SUPPLY AND FIXING OF 4 WAY TPN DB HORIZONTAL WITH IP 43 PROTECTION AS PER IS:13032 AND SUITABLE FOR 12 NOS S.P. OUTGOINGS AND FOR 1 NO 4 POLE INCOMER (FP ISOLATOR / MCB) WITH 100 A TINNED COPPER BUSBAR, NEUTRAL BAR, EARTH BAR AND CABLE TIES FOR CABLE MANAGEMENT, FULLY SHROUDED NEUTRAL BAR, PROFILE BLANKING MODULES FOR UNUSED MCB WAYS, DIN BARS AND DETACHABLE GLAND PLATE ETC., COMPLETE WITH INTER CONNECTIONS BUT EXCLUDING GST. [LDB] INCOMMER: 40A DP ISOLATOR - 1NO. OUTGOING: 6-32A SP MCB, 10KA ISI MARK - 12 NOS. DB MAKES: ABB/C&S/ LK (L&T). ISOLATOR MAKE: ABB/HAVELLS/ LK (L&T)/C&S. MCB MAKE: ABB/HAVELLS/ LK (L&T)./C&S
SUPPLY AND FIXING OF 8 WAY TPN DB HORIZONTAL WITH IP 43 PROTECTION AS PER IS:13032 AND SUITABLE FOR 24 NOS S.P. OUTGOINGS AND FOR 1 NO 4 POLE INCOMER (FP ISOLATOR / MCB) WITH 100 A TINNED COPPER BUSBAR, NEUTRAL BAR, EARTH BAR AND CABLE TIES FOR CABLE MANAGEMENT, FULLY SHROUDED NEUTRAL BAR, PROFILE BLANKING MODULES FOR UNUSED MCB WAYS, DIN BARS AND DETACHABLE GLAND PLATE ETC., COMPLETE WITH INTER CONNECTIONS BUT EXCLUDING GST. [PDB] INCOMMER: 63A FP ISOLATOR - 1NO. OUTGOING: 6-32A SP MCB, 10KA ISI MARK - 24 NOS. DB MAKES: ABB/C&S/ LK (L&T). ISOLATOR MAKE: ABB/C&S/ LK (L&T). MCB MAKE:ABB/C&S/ LK (L&T).
SUPPLY OF 16 SQMM 4 CORE XLPE INSULATED, 1100V GRADE ARMOURED ALLUMINIUM CABLE WITH ISI MARK AS PER SPECIFICATION CONFIRMING TO IS:7098 (PART - I) BUT EXCLUDING GST. MAKES : UNIVERSAL / TORRENT / POLYCAB / GLOSTER.
EARTH WORK EXCAVATION OF TRENCH IN HARD GROUND SOIL, LAYING OF U.G CABLES FROM 70 SQMM TO 400 SQMM FOR LAYING OF HUME PIPES AND BACK FILLING OF TRENCH INCLUDING COST AND CONVEYANCE OF MATERIALS AND LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST.
LABOUR CHARGES FOR RUN OF U.G CABLE ON WALL / EXISTING PIPE WITH NECESSARY FIXING ARRANGMENTS SUCH AS SADDLES, CLAMPS,WOODEN SEPARATORS ETC., (AS DIRECTED BY DEPARTMENTAL OFFICIAL) ETC., COMPLETE BUT EXCLUDING GST.
SUPPLY AND FIXING OF HEAVY DUTY TYPE DOUBLE COMPRESSION WEATHER SUPPLY AND FIXING OF HEAVY DUTY TYPE DOUBLE COMPRESSION WEATHER PROOF TYPE BRASS CABLE GLANDS DULY NICKEL PLATED AS PER BS 6121 AND IP66 COMPLETE WITH BRASS CHECKNUT, OUTER SHEATH SEALING GASKET SUITABLE FOR 16 SQMM 4 CORE XLPE INSULATED ARMOURED CABLE AND HEAVY DUTY LONG BARREL ALLUMINIUM LUGS CONFIRMING TO I.S SPECIFICATIONS SUITABLE FOR 16 SQMM 4 CORE XLPE INSULATED ARMOURED CABLE ETC COMPLETE WITH NUTS, BOLTS AND WASHERS ETC., COMPLETE BUT EXCLUDING GST. GLANDS MAKES: SMI / COMMET / DOWELS. LUGS MAKES: DMI / JAINSON / DOWELS.
PROVIDING INDEPENDENT EARTHING FOR IMPORTANT EQUIPMENT WITH 40MM DIA 'B' CLASS 2.5M LONG G.I PIPE AND 19MM DIA 'B' CLASS G.I PIPE OF 0.3MTR. LONG CONNECTED WITH REDUCER PROVIDING G.I FUNNEL WITH MESH ENCLOSED IN C.C/ BRICK MASSONRY CHAMBER OF 450M X 450M X 400MM WITH R.C.C. SLAB COVER DULY PROVIDING STAGGERED HOLES FILLING WITH 20KG SALT AND 40KG CHARCOAL OR 40KG BENTONITE POWDER FROM THE BOTTOM OF THE PIPE GIVING EARTH CONNECTION FROM ELECTRODE THROUGH G.I STRIP OF 40 X 6MM X 200MM LENGTH WITH ALL ACCESSORIES AND LABOUR CHARGES COMPLETE, AS PER IS SPECIFICATIONS 732/1982 (PART II) BUT EXCLUDING GST.
SUPPLY AND RUN OF NO.8 SWG G.I WIRE INCLUDING COST OF ALL ACCESSORIES AND LABOUR CHARGES ETC.COMPLETE.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Final BOQ MAHABUBABAD T93.xls
TENDER_DOCUMENT • 0.16 MB
drawings.pdf
TENDER_DOCUMENT • 2.79 MB
Tender Conditions T93.docx
TENDER_DOCUMENT • 0.30 MB
Download all tender documents and submit your bid