Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹4.1 LAccepted-AOC | l1 | Accepted-AOC Qualify in financial bid | |
| 2 | l2₹4.5 L+₹33,790.54 (8.20%)Rejected-AOC C 90 2 MOTHER TERESA NAGAR GATOR ROAD JAIPUR | JAIPUR | JAIPUR | RAJASTHAN | l2 | Rejected-AOC Not Qualify in financial bid | |
| 3 | l3₹4.5 L+₹34,868.04 (8.46%)Rejected-AOC | l3 | Rejected-AOC Not Qualify in financial bid | |
| 4 | Rejected-Technical | - | Rejected-Technical Non Responsive regarding Not submitt registration certificate requirment as per tender document |
Tender Value
₹4.8 L
Closing Date
26 Jul 2021, 5:00 pmClosed
Chief Executive Officer, ADMA
Amber Development and Management Authority Old Vidhan Sabha Bhawan, Near Hawa Mahal, Jaipur
SITC of 250 LPH plant and 380 Ltr. storage/ 170 Ltr. cooling per Hr. water cooler and Amber Mahal, Jaipur
2021_Amber_232768_5
03/2021-22
Open Tender
Electrical Works
Percentage
90 days
Amber Mahal
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
Chief Executive Officer, ADMA
Yes
5 Oct 2021
19 Jul 2021
28 Jul 2021
19 Jul 2021
26 Jul 2021
19 Jul 2021
Amount
SITC of centralized commercial RO plant 250 LPH capacity, completely assembled/pre-piped/ pre-wired, MCB for protection, Auto start/stop based on water level in tank micro processor based control panel for ease of operation and inbuilt process logic, making connection, installation, testing and commissioning Make- Eureka Forbs, Kent, Thermax
SITC of water cooler 380 ltr storage and 170 ltr cooling per hour Make -Blur Star, Voltas, Usha
P&F PVC storage tank 1000 Liter capacity, with cover, 25mm dia 1m long G.I over flow pipe & 25 cm long was out pipe with plug & socket, including making connection etc.
Copper Conductor 2.5 Sq. mm. 4 Core for electric supply connection including MCB etc.
P&F un plasticized polychloride (UPVC) SHC80, Having stablity for R.O application water supply including all UPVC plain & fitting i/c fixing the pipe with clamps at 1.00m spacing. This includes jointing of pipes & fittings with one steps UPVC solvent cement and testing of joints complete as per direction of engineerin charge (internal /outer work exposed on wall) for use of R.O
SITC of Foundation for RO system and water cooler with closed fensing of iron
M/S RAAPS CONSTRUCTION
karni trade solutions (p) ltd
M/S RAAPS CONSTRUCTION
karni trade solutions (p) ltd
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .