| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC | ₹7.1 L | L1 | Accepted-AOC Accept |
| 2 | L2₹7.1 L+₹8,327.91 (1.18%)Rejected-AOC | ₹7.1 L+₹8,327.91 (1.18%) | L2 | Rejected-AOC Reject |
| 3 | L3₹7.6 L+₹56,212.04 (7.96%)Rejected-AOC | ₹7.6 L+₹56,212.04 (7.96%) | L3 | Rejected-AOC Reject |
| 4 | L4₹7.7 L+₹60,987.04 (8.63%)Rejected-AOC 42 641 009 | COIMBATORE | TAMIL NADU | 641009 | ₹7.7 L+₹60,987.04 (8.63%) | L4 | Rejected-AOC Reject |
| 5 | L5₹8.0 L+₹90,280.04 (12.8%)Rejected-AOC | ₹8.0 L+₹90,280.04 (12.8%) | L5 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | M/s.MS ENGINEERS AND BUILDERS L4 | T.L.NARAYANASAMY L6 | M.S.& CO L2 | SRI KUMARAGURU INFRA L3 | MJ Infrastructures L1 | GANAPATHY ENTERPRISES L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation of the surface to a depth of 5cm to 10cm and form the camber etc., complete as per standard specifications. | 50 | m3 | 100 ₹5,000 | 116.16 ₹5,808 | 104.06 ₹5,203 | 120 ₹6,000 | 102.85 ₹5,142.5 | 15 ₹750 Lowest |
| 2.00 | Providing and laying ,spreading and compacting graded stone aggregate to Wet mix macadam (WMM ) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base /base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 50 | M3 | 1,900 ₹95,000 Lowest | 2,650.6 ₹1,32,530 | 2,374.5 ₹1,18,725 | 2,500 ₹1,25,000 | 2,346.88 ₹1,17,344.2 | 2,670 ₹1,33,500 |
| 3.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder,including labour charges for applying the required quantity of bituminous binder as prime coat manually etc., complete as per 502 of MORTH Rev V Specifications | 496 | M2 | 110 ₹54,560 | 105.6 ₹52,377.6 | 94.6 ₹46,921.6 | 92 ₹45,632 | 93.5 ₹46,376 | 85 ₹42,160 Lowest |
| 4.00 | Providing and laying Tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications | 496 | M2 | 28 ₹13,888 | 26.88 ₹13,332.48 | 24.08 ₹11,943.68 | 25 ₹12,400 | 23.8 ₹11,804.8 Lowest | 25 ₹12,400 |
| 5.00 | Providing and laying Tack coat of 2 kgs/10 sqm over the Existing BT surface treated with binder using 2 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications | 737 | M2 | 37 ₹27,269 | 35.52 ₹26,178.24 | 31.82 ₹23,451.34 | 30 ₹22,110 | 31.45 ₹23,178.65 | 25 ₹18,425 Lowest |
| 6.00 | Providing and laying Bituminous Concrete to 30mm thick using 10% of Plastic Waste and 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 45.27kgs of VG30 / VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. | 37 | M3 | 15,400 ₹5,69,800 | 15,290.4 ₹5,65,744.8 | 13,697.65 ₹5,06,813.05 | 14,850 ₹5,49,450 | 13,537.95 ₹5,00,904.15 Lowest | 15,925 ₹5,89,225 |
| 7.00 | Removal of Excavated Excess Earth away from the site to 2 K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 30 | M3 | 65 ₹1,950 | 65.12 ₹1,953.6 | 58.34 ₹1,750.2 | 70 ₹2,100 | 57.66 ₹1,729.66 | 10 ₹300 Lowest |
| 8.00Add :- GST @ 18% | |||||||||
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
29 Jun 2026, 3:00 pmClosed
Asst Commissioner
East Zone Singanallur-641005
Restoration of B.T.Surface at Co Operative Colony 1 2 and 3 in Ward No.60 East Zone
2026_MAWS_681272_28
E3/2026/EZ
Open Tender
Civil Works - Roads
Item Rate
East Zone Singanallur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,000
Yes
18 Sept 2026
17 Jun 2026
30 Jun 2026
17 Jun 2026
29 Jun 2026
17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation of the surface to a depth of 5cm to 10cm and form the camber etc., complete as per standard specifications. | 50 | m3 | - | - |
| 2 | Providing and laying ,spreading and compacting graded stone aggregate to Wet mix macadam (WMM ) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base /base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 50 | M3 | - | - |
| 3 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder,including labour charges for applying the required quantity of bituminous binder as prime coat manually etc., complete as per 502 of MORTH Rev V Specifications | 496 | M2 | - | - |
| 4 | Providing and laying Tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications | 496 | M2 | - | - |
| 5 | Providing and laying Tack coat of 2 kgs/10 sqm over the Existing BT surface treated with binder using 2 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications | 737 | M2 | - | - |
| 6 | Providing and laying Bituminous Concrete to 30mm thick using 10% of Plastic Waste and 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 45.27kgs of VG30 / VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. | 37 | M3 | - | - |
| 7 | Removal of Excavated Excess Earth away from the site to 2 K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 30 | M3 | - | - |
| 8 | Add :- GST @ 18% | - | - | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendernotice_2.pdf
PDF • 0.10 MB
Roads.pdf
Tender Documents • 0.51 MB
BOQ_818782.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .