Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC NO 87 NEW BALAJI NAGAR ATTIPATTU CHENNAI 600 120 | CHENNAI | CHENNAI | TAMIL NADU | 600120 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹9.3 L+₹42,240 (4.77%)Rejected-AOC | L2 | Rejected-AOC Rejected |
Tender Value
Refer Docs
EMD Value
₹9,600
Closing Date
27 Jun 2024, 2:00 pmClosed
SE/ES/NCTPS-I
SE/ES/NCTPS-I Chennai-120
NCTPS I ES Circle EM II Dn AHP Overhauling of 4 nos 6 6KV 230 KW 1486 RPM Kirloskar make HT Ash slurry disposal pump motor at Ash Handling Plant NCTPS I
2024_EB_454442_1
CE/NCTPS-I/SE/ES/WC-12/2024-25
Open Tender
Power/Energy Projects/Products
Works
60 days
NCTPS-I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹9,600
Yes
8 May 2025
14 Jun 2024
28 Jun 2024
14 Jun 2024
27 Jun 2024
14 Jun 2024
Amount
Disconnection of power cable, decoupling, releasing the motor from its bed, shifting to repair bay.
Dismantling of the motor pulley, fan hub, end covers, cleaning and threading out the rotor.
Overhauling of coolers : Dismantling of the motor air cooler and checking & cleaning (applicable for 230 KW motor)
Overhaul of Stator : Cleaning the stator windings, checking and tightening of loose wedges in the stator by inserting additional glass textolite liners and replacing all damaged wedges by new one and spraying one coat of Dr.Beck insulation varnish, drying out, & stator pre heating.
Overhaul of Rotor : Cleaning & inspection of the rotor, checking the position of stampings, inspection of winding bars, soldered end winding and spraying one coat of Dr.Beck insulation varnish in rotor and drying out.
Releasing the DE bearing Cleaning, checking and refixing with new one if found necessary or fixing the old bearings if found healthy (Bearing supplied by TANGEDCO)
Releasing the NDE bearing cleaning, checking and refixing with new one if found necessary or fixing the old bearings if found healthy (Bearing supplied by the Contractor)
Assembling the motor after threading in the rotor, fixing end covers & pulley.
Providing rubber gasket and fixing cooler unit. (Applicable for 230KW motor)
Labour charges for shifting the motor to its bed, connection of power cable, alignment, coupling, and trial run.
Charges for painting the motor with two coats DA grey / deep orange colour synthetic enamel paint. Total area of the motor is 18 Sq.m.
Charges for dynamic balancing of rotor for 230 KW, 6.6KV, 3 phase HT motor. (If necessary)
DE End shield undercutting, welding & machining to suit the new bearing NU 326 C3. (If Necessary)
NDE End shield undercutting, welding & machining to suit the new bearing 6326 C3. (If necessary)
Provision of stator terminal take off leads for silicon cable. (Material Supplied by Contractor)
Supply and erection of stator terminal clamp
Supply and erection of stator terminal Bushing.
Bearing 6326 MC3 (Ball bearing)
Transport loading & unloading From NCTPS-I to workshop & Workshop to NCTPS-I
Consumables and T&P
KRAM ELECTRICAL WORKS (BID ID -1070410)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .