Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.7 LAccepted-AOC AT AMBICA SAHI WARD NO 05 PO BARIPADA DIST MAYURBHA PIN 757001 | MAYURBHANJ | ODISHA | 757001 | ₹16.7 L Quoted ₹14.2 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹16.1 LRejected-Finance AT NANDIRA COLONY QTR NO B7 TALCHER DIST ANGUL ODISHA PIN 759148 | TALCHER | ANGUL | ODISHA | 759148 | ₹16.1 L | L2 | Rejected-Finance Quoted price is higher than L1 |
| 3 | L3₹20.4 LRejected-Finance | ₹20.4 L | L3 | Rejected-Finance Quoted price is higher than L1 |
| Sl No | Description | Qty | Unit | M/S SHAKTI ENTERPRISES L2 | Santosh Kumar Sahoo L1 | M/s. SHAKTI ASSOCIATE L3 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 2.00 | Cleaning the galleries in the underground by mannual labour including stacking of serviciable materials and unservicible materials with a lead upto 30 mtr. And lift upto 1.5 mtrs. | 4.5 | Cum. | 600 ₹2,700 | 526 ₹2,367 Lowest | 765 ₹3,442.5 |
| 3.00 | Excavation in soft stone by chiselling in trenches for making notches of 0.30m depth & 0.30m. width in roof of the gallery, including stacking of serviceable and un-serviceable materials with lead upto 30 mtr and lift. 1.5 mtr. The roof & sides needs to be properly dressed before the work. | 5.07 | Cum. | 4,800 ₹24,336 Lowest | 5,760 ₹29,203.2 | 6,279 ₹31,834.53 |
| 4.00 | Excavation in coal/shale by chiselling in trenches for making notches of 0.5 m depth & 0.30 m width in floor & sides of the gallery including stacking of serviceable materials & un-serviceable materials with a lead upto 30 mtr & lift upto 1.50 mtr. The sides to be neatly dressed. | 16.69 | Cum. | 2,100 ₹35,049 Lowest | 2,520 ₹42,058.8 | 2,747 ₹45,847.43 |
| 5.00 | REINFORCEMENT BY TOR STEEL ROD 16mm/8mm, BASED ON GM'S SOR-99, SL NO. - 6 | 2,451.74 | kg. | 110 ₹2,69,691.4 | 83 ₹2,03,494.42 Lowest | 121 ₹2,96,660.54 |
| 6.00 | Providing & laying in position specified of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - all work up to plinth level. 1:1.5:3 [1 Cement : 1.5 Coarse sand : 3 graded stone aggregate 20mm nominal size] CODE 5.1.2 BASED ON MCL SOR 2023. | 55.72 | Cum. | 8,500 ₹4,73,620 | 7,678 ₹4,27,818.16 Lowest | 11,160 ₹6,21,835.2 |
| 7.00 | Providing and laying in position cement of specified grade excluding the cost of centring and shuttering - all work up to plinth level : 1:2: 4 (1cement : 2 coarse sand : 4 graded stone aggregate 20 mm & 10 mm (3:1) nominal size), code 4.1.3, Based on MCL SOR 2023. | 4.52 | Cum. | 7,000 ₹31,640 | 6,114 ₹27,635.28 Lowest | 8,886 ₹40,164.72 |
| 8.00 | 18 mm thick plaster (1:4) cement (OPC grade 43) & fine sand mortar for - two layers (12 mm & 6 mm). (for making boards and plastering of stopping) | 269.51 | Sqm. | 650 ₹1,75,181.5 | 582 ₹1,56,854.82 Lowest | 846 ₹2,28,005.46 |
| 9.00 | Painting with synthetic enamel paint : Two or more coats on new work | 11 | Sqm. | 180 ₹1,980 | 160 ₹1,760 Lowest | 233 ₹2,563 |
| 10.00 | White washing with unslacked lime mixed with the water as per instruction of the engineer In-charge in the underground. Before white washing the gallieries roof and sides should be neately cleaned. The white washing will be two or more coats as per instruction of Engineer In-charge. The cost of the materials included in the items. | 1,214.86 | Sqm. | 17 ₹20,652.62 Lowest | 17.3 ₹21,017.08 | 25 ₹30,371.5 |
Tender Value
₹22.1 L
EMD Value
₹28,000
Closing Date
1 Jan 2026, 5:00 pmClosed
Staff Officer(Mining), Talcher Area
The Office of Staff Officer(Mining),Talcher Area
Construction of 11 Number of Isolation stopping to seal off WP-VE-2 Panel in Nandira Colliery, Talcher Area.
2025_MCL_349826_1
SO(M)/e -Tender/25-26/09 Dated. 22.12.2025
Open Tender
Civil Works - Others
Item Rate
720 days
Nandira Colliery
As per NIT
3 documents required · 3 mandatory
₹28,000
21 Jul 2026
22 Dec 2025
2 Jan 2026
23 Dec 2025
1 Jan 2026
23 Dec 2025
23 Dec 2025 - 29 Dec 2025
Amount
Item Description/ Heading
Cleaning the galleries in the underground by mannual labour including stacking of serviciable materials and unservicible materials with a lead upto 30 mtr. And lift upto 1.5 mtrs.
Excavation in soft stone by chiselling in trenches for making notches of 0.30m depth & 0.30m. width in roof of the gallery, including stacking of serviceable and un-serviceable materials with lead upto 30 mtr and lift. 1.5 mtr. The roof & sides needs to be properly dressed before the work.
Excavation in coal/shale by chiselling in trenches for making notches of 0.5 m depth & 0.30 m width in floor & sides of the gallery including stacking of serviceable materials & un-serviceable materials with a lead upto 30 mtr & lift upto 1.50 mtr. The sides to be neatly dressed.
REINFORCEMENT BY TOR STEEL ROD 16mm/8mm, BASED ON GM'S SOR-99, SL NO. - 6
Providing & laying in position specified of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - all work up to plinth level. 1:1.5:3 [1 Cement : 1.5 Coarse sand : 3 graded stone aggregate 20mm nominal size] CODE 5.1.2 BASED ON MCL SOR 2023.
Providing and laying in position cement of specified grade excluding the cost of centring and shuttering - all work up to plinth level : 1:2: 4 (1cement : 2 coarse sand : 4 graded stone aggregate 20 mm & 10 mm (3:1) nominal size), code 4.1.3, Based on MCL SOR 2023.
18 mm thick plaster (1:4) cement (OPC grade 43) & fine sand mortar for - two layers (12 mm & 6 mm). (for making boards and plastering of stopping)
Painting with synthetic enamel paint : Two or more coats on new work
White washing with unslacked lime mixed with the water as per instruction of the engineer In-charge in the underground. Before white washing the gallieries roof and sides should be neately cleaned. The white washing will be two or more coats as per instruction of Engineer In-charge. The cost of the materials included in the items.
Centring of shuttering including strutting propping etc. and removal of from work, code 5.9.1, Based on MCL SOR 2023.
Transportation of material (WP-VE2) ( Surface to underground through haulage thereafter pussing trolley & carrying manual for a lead of 50 m.) 1. Stone Chips
Transportation of material (WP-VE2) ( Surface to underground through haulage thereafter pussing trolley & carrying manual for a lead of 50 m.) 2. Sand
Transportation of material (WP-VE2) ( Surface to underground through haulage thereafter pussing trolley & carrying manual for a lead of 50 m.) 3. Steel.
Transportation of material (WP-VE2) ( Surface to underground through haulage thereafter pussing trolley & carrying manual for a lead of 50 m.) 4. Cement.
Total impact of GST for the purpose of CTC
M/S SHAKTI ENTERPRISES (BID ID -1208380)
M/s. SHAKTI ASSOCIATE (BID ID -1208191)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.33 MB
Tendernotice_2.pdf
PDF • 1.17 MB
BOQ_362611.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].