| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹159.0 CrAccepted-AOC | ₹159.0 Cr | L1 | Accepted-AOC Accepted being lowest L1 |
| 2 | L2₹160.4 CrRejected-Finance | ₹160.4 Cr | L2 | Rejected-Finance Not Being lowest |
| 3 | L3₹168.5 CrRejected-Finance | ₹168.5 Cr | L3 | Rejected-Finance Not Being lowest |
| 4 | Rejected-Technical PLOT NO 65 SECTOR 18 OPP HIPA SARHAUL GURUGRAM 122 001 | - | - | Rejected-Technical Not eligible as per NIT |
Tender Value
₹163.5 Cr
EMD Value
₹15 L
Closing Date
3 Jul 2023, 6:00 pmClosed
Chief Engineer (Navy) Mumbai
Headquarters Chief Engineer (Navy) Mumbai 26, Assaye Building Colaba, Mumbai 400 005
ENGINEERING, PROCUREMENT AND CONSTRUCTION EPC MODE OF DEFICIENT SAILORS MARRIED ACCOMMODATION 304 DUs, G PLUS 42 FLOORS AT MUMBAI
2022_MES_531651_2
87911/E8
Open Tender
Civil Works
1095 days
Garrison Engineer (P) NW No. 2 Mumbai
As per tender documents
9 documents required · 9 mandatory
₹3,000
Garrison Engineer (P) NW No. 2 Mumbai
₹15 L
Yes
12 Aug 2023
29 May 2023
5 Jul 2023
29 May 2023
3 Jul 2023
19 Jun 2023
29 May 2023 - 5 Jun 2023
Amount
Design & Construction of Multi-storeyed Deficient Sailors married accommodation (304DUs) (G+42) in two towers connected with podium and a common staircase at Colaba, Mumabi, complete as detailed in scope of work and other documents of tender, complete all as specified and directed.
MANNING & OPERATION OF LIFTS (REFER ANNEXURE-XIX)
Manning & Operation of fully automatic electrically operated passenger lift of any make, type and 16 passenger lift - 06 Nos and 20 passenger lift - 01 No, covering total 43 floors, speed 4m/sec, SS lift installed in the subject project as per schedule for supply and fix given above by placing 2 x lift operator in 2 shifts of 8 hrs including Sunday and holiday (1st Shift-0600 hrs to 1400 hrs and 2nd Shift-1400 hrs to 2200 hrs) including taking care of all lifts from any pilferage or damage etc (Total 7 Nos lifts) + 1 person at night including Sunday & holiday (night shift-2200 hrs to 0600) hrsduring the defects liability period of the project and after for 03 years after the defects liability period of the project, complete all as mentioned below and all as specified and directed:-
11 months after completion of work
11 months after completion of BoQ Sl. item No. 2.02 here-in-before
11 months after completion of BoQ Sl. item No. 2.03 here-in-before
11 months after completion of BoQ Sl. item No. 2.04 here-in-before
11 months after completion of BoQ Sl. item No. 2.05 here-in-before
05 months after completion of BoQ Sl. item No. 2.06 here-in-before
MANNING & OPERATION OF WATER SUPPLY INSTALLATIONS , FIRE FIGHTING INSTALLATIONS & DG SET (REFER ANNEXURE-XXI)
Manning & Operation of water supply installation consisting of Fire fighting installations, electrically operated pump sets (for fresh water and for treated grey water) of different capacities including DG set installed in the subject project as per tender by placing one FGM and one valve man in each shift and maintenance of log book, taking care of pumps / valves / overflow of tanks, other minor repairs and leakages daily in three shifts from 0600 hrs to 1400 hrs, 1400 hrs to 2200 hrs and 2200 hrs to 0600 hrs including cleaning, daily maintenance, testing onsite water parameters using pH tester, chloroscope, TDS meter etc.Period of manning & operation shall be 60 months from the date of completion of the project. (TOTAL number of FGM required per day are 03 nos.) on all days including Sundays and Gazetted holidays during the defects liability period of the project and for 03 years after the defects liability period of the project, complete all as mentioned below and all as specified and directed:-
11 months after completion of work
11 months after completion of BoQ Sl. item No. 3.02 here-in-before
11 months after completion of BoQ Sl. item No. 3.03 here-in-before
11 months after completion of BoQ Sl. item No. 3.04 here-in-before
11 months after completion of BoQ Sl. item No. 3.05 here-in-before
05 months after completion of BoQ Sl. item No. 3.06 here-in-before
COMPREHENSIVE MAINTENANCE OF LIFTS (REFER ANNEXURE-XX)
Comprehensive maintenance as per OEM manual and repairs of fully automatic electrically operated passenger lift of any make and 16 Passenger, 1088kg, covering total 43 floors, speed 4m/sec, SS lift installed in the subject project as per schedule for supply & fix given above (Total 6 Lifts), comprising of all devices and accessories through out 36 months on all days including holidays for period of 03 years after expiry of defects liability period, complete all as mentioned below and all as specified and directed.
One year after expiry of defects liability period
One year after completion of BoQ Sl. item No. 4.02 here-in-before
One year after completion of BoQ Sl. item No. 4.03 here-in-before
Comprehensive maintenance as per OEM manual and repairs of fully automatic electrically operated passenger lift of any make and 20 Passenger, 1360kg, covering total 43 floors, speed 4m/sec, SS lift installed in the subject project as per schedule for supply & fix given above (01 Fire lift), comprising of all devices and accessories through out 36 months on all days including holidays for period of 03 years after expiry of defects liability period, complete all as mentioned below and all as specified and directed.
One year after expiry of defects liability period
One year after completion of BoQ Sl. item No. 4.06 here-in-before
One year after completion of BoQ Sl. item No. 4.07 here-in-before
COMPREHENSIVE MAINTENANCE OF WATER SUPPLY INSTALLATIONS , FIRE FIGHTING INSTALLATIONS & DG SET (REFER ANNEXURE-XXII)
Comprehensive annual maintenance including all repairs / replacement and preventive maintenance / servicing of Complete water supply installations, fire fighting and fire alarm installation and DG set-01 No all as provided & installed under subject work throughout for a period of 03 (Three) years) including Sundays and holidays after expiry of defects liability period, complete all as mentioned below and all as specified and directed.
One year after expiry of defects liability period
One year after completion of BoQ Sl. item No. 5.02 here-in-before
One year after completion of BoQ Sl. item No. 5.03 here-in-before
COMPREHENSIVE MAINTENANCE OF ELECTRIC SUPPLY WORKS (REFER ANNEXURE-XXIII)
Annual Comprehensive maintenance including all repairs / replacement and preventive maintenance / servicing of Complete electric works consisting of point wiring, light fittings, ceiling fans, exhaust fans, switches, sockets, modular box and cover plate, MCBs (SP/SPN), DBs, submain wiring and telephone & TV wiring, LT cables, junctions, LT panels, earthing, aviation light, lightning protection, MCCBs, rising bus trunking, tap off boxes etc all as required throughout for a period of 03 (Three) years including Sundays and holidays after expiry of defects liability period, complete all as mentioned below and all as specified and directed.
One year after expiry of defects liability period
One year after completion of BoQ Sl. item No. 6.02 here-in-before
One year after completion of BoQ Sl. item No. 6.03 here-in-before
COMPREHENSIVE MAINTENANCE OF BUILDINGS INCLUDING POLISHING OF FURNITRE
Comprehensive maintenance and repairs including replacement of materials of Buidings & Structures (Annexure - I) and connected services of Internal water supply works covered under Annexure - III, Ligtening Protection works covered under Annexure-VII, Aviation Light works covered under Annexure-VIII, Telephone and TV wiring covered under Annexure - X, Piped Natural Gas works covered under Annexure-XI, Road / Path / Hardstanding / Culvert works covered under Annexure-XII, Sewage Disposal covered under Annexure - XV, Area drainage covered under Annexure - XVI, Compound Wall works covered under Annexure-XVII, Arboriculture covered under Annexure - XVIII and Polishing of Furniture covered under BoQ through out 12 months on all days including holidays for a period of 03 years after expiry of defects liability period, complete all as mentioned below and all as specified and directed.
One year after expiry of defects liability period
One year after completion of BoQ Sl. item No. 7.02 here-in-before
One year after completion of BoQ Sl. item No. 7.03 here-in-before
FURNITURE (ANNEXURE-XXIV)
Supply only Almirah medium steel, as per drawing No. FD-1032, complete all as specified and directed.
Supply only Chair dining JCOs / OR, as per drawing No. FD/MAP-II/05, complete all as specified and directed.
Supply only Chair Verandah JCOs / OR, as per drawing No. FD-256, complete all as specified and directed.
Supply only Chair School with hand board as per drawing No. FD/E6/MAP/05, complete all as specified and directed.
Supply only Charpoy IP hard top as per drawing No. FD/MAP-II/01, complete all as specified and directed.
Supply only Peg set of six as per drawing No. FD-80(M), complete all as specified and directed.
Supply only Table peg as per drawing No. FD-384, complete all as specified and directed.
Supply only Rack shoe steel as per drawing No. FD/E6/MAP/02(R), complete all as specified and directed.
Supply only Table bed side as per drawing No. FD/E6/MAP/15(R), complete all as specified and directed.
Supply only Table dining 1500mm x 900mm x 760mm as per drawing No. FD/MAP-II/03, complete all as specified and directed.
Supply only Dressing mirror gents as per drawing No. FD/E6/MAP/16, complete all as specified and directed.
Rds Project ltd.
Som Projects Pvt. Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid