Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.1 CrAdmitted-Finance JATRAHIBAGH PO THANA CHATRA DISTT CHATRA | NA | NA | 825103 | -1.20% | ₹3.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.3 CrAdmitted-Finance MOHANPUR GURGAIN BURMU RANCHI | RANCHI | JHARKHAND | 829205 | +5.45% | ₹3.3 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical VILL DODA G P SIMA BLOCK CHATRA CHATRA | DODA | JAMMU AND KASHMIR | 182129 | - | - | - | Rejected-Technical NON RESPONISVE |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical NON RESPONISVE |
| 5 | Rejected-Technical AT SAHIJANA GARHWA JHARKHAND 822114 | GARHWA | JHARKHAND | 822114 | - | - | - | Rejected-Technical NON RESPONISVE |
Tender Value
₹3.1 Cr
EMD Value
₹6.4 L
Closing Date
7 Aug 2026, 5:00 pmClosed
DISTRICT ENGINEER
DB CHATRA
Construction of 10 ACR at project Girls High School, Itkhori, Block-Itkhori.
2026_ZPCHT_116672_1
NIT-32/26-27
Open Tender
Civil Works
Works
ITKHORI
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹6.4 L
21 Aug 2026
30 Jul 2026
10 Aug 2026
1 Aug 2026
7 Aug 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and direction of E/I. | 1,405.07 | cu.m | 151.82 | ₹2,13,317.73 |
| 2 | Extra for earth work in hard soil as per specification and direction of E/I. (vide classfication of soil item - B) | 591.67 | cu.m | 15.51 | ₹9,176.8 |
| 3 | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). | 714.89 | cu.m | 55.28 | ₹39,519.12 |
| 4 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Rate per cum for grading-I Material | 42 | M3 | 1,437.6 | ₹60,379.2 |
| 5 | Filling in foundation trenches and plinth in layers. Not exceeding 150 mm thick well watered, rammed fully compacted and fine dressed with earth obtained after cutting within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | 830.71 | cu.m | 128.88 | ₹1,07,061.9 |
| 6 | Providing coarse clean sand in filling in foundation trenches or plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts includng cost of all materials, Labour, rotalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume). | 71.43 | cu.m | 589.51 | ₹42,108.7 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size) | 2.46 | M3 | 4,503.43 | ₹11,078.44 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) | 58.94 | cu.m | 4,125.41 | ₹2,43,151.67 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size) | 0.84 | m3 | 4,027.14 | ₹3,382.8 |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 48.79 | cu.m | 3,751.64 | ₹1,83,042.52 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
SBD.pdf
Tender Documents • 7.19 MB
BOQ_157713.xls
BOQ • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].