Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAccepted-AOC BUS STAND BEENA SONEBHADRA U P 231220 | SONBHADRA | UTTAR PRADESH | 231220 | ₹10.7 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹12.4 L+₹1.7 L (15.6%)Rejected-Finance | ₹12.4 L+₹1.7 L (15.6%) | L2 | Rejected-Finance L2 bidder |
| Sl No | Description | Qty | Unit | M/S DS CONSTUCTION L2 | M/S. VISHWAKARMA STEEL WORKS L1 |
|---|---|---|---|---|---|
| 1.00 | Laying and jointing( Including all welding and cutting works ) 150 mm/6” dia MS pipe line including manual transportation of material from store to site or as per instruction of EIC ( Only industrial gas & truck supplied by department) | 1,000 | Mtr | 38 ₹38,000 Lowest | 55 ₹55,000 |
| 2.00 | Dismantling of 150 mm/6” dia MS pipe line including transportation of pipe to required place & stacking them as per instruction of EIC ( Only industrial gas & truck supplied by department ) | 1,000 | Mtr | 32 ₹32,000 | 30 ₹30,000 Lowest |
| 3.00 | Laying and jointing (Including all welding and cutting works) 100 mm/4” dia GI pipe line including manual transportation of material from store to site or as per the instruction of EIC | 6,000 | Mtr | 38 ₹2,28,000 Lowest | 38 ₹2,28,000 Lowest |
| 4.00 | Dismantling of 100 mm/4” dia GI pipe line including transportation of pipe to the required place and stacking them as per instruction of EIC ( Only Industrial gas & truck supplied by department) | 6,000 | Mtr | 32 ₹1,92,000 | 22 ₹1,32,000 Lowest |
| 5.00 | Laying & jointing (Including all welding and cutting works) 75 mm/3” dia GI pipe line including manual transportation of material from store to site or as per instruction of EIC ( only industrial gas & truck supplied by the department | 6,400 | Mtr | 38 ₹2,43,200 | 35 ₹2,24,000 Lowest |
| 6.00 | Dismantling of 75 mm /3” dia GI pipe line including transportation of pipe to the required place and stacking them as per instruction of EIC ( only industrial gas & truck supplied by the department | 6,400 | Mtr | 22 ₹1,40,800 | 20 ₹1,28,000 Lowest |
| 7.00 | Fitting of 3”/4”/6” sluice valve with complete arrangement ( only industrial gas & truck supplied by the department) | 100 | Nos | 400 ₹40,000 | 170 ₹17,000 Lowest |
| 8.00 | Supply of MS nut bolt & washer 5/8 X 3” of size as per need | 400 | KG | 120 ₹48,000 Lowest | 125 ₹50,000 |
| 9.00 | Welding of MS & GI pipe line | 300 | Mtr | 90 ₹27,000 | 25 ₹7,500 Lowest |
| 10.00 | Dismantling of the 3”, 4”, 6” dia sluice valve, monitor, hydrant etc with complete arrangement | 100 | Nos | 400 ₹40,000 | 120 ₹12,000 Lowest |
Tender Value
₹13.4 L
EMD Value
₹16,800
Closing Date
9 Jan 2023, 11:30 amClosed
SO ENM JHINGURDA PROJECT
SO(ENM) OFFICE JHINGURDA PROJECT NCL SINGRULI
Day to day laying, Jointing and dismantling, repairing of 6, 4, 3 inches dia MS and GI pipe for firefighting in Jhingurda mines for 730 days
2022_NCL_265832_1
NCL/JRD/EnM/Tender/22-23/44 Dated 24.12.2022
Open Tender
Miscellaneous Works
Item Rate
730 days
JHINGURDA PROJECT NCL SINGRAULI
AS PER NIT
4 documents required · 4 mandatory
₹16,800
28 Aug 2025
24 Dec 2022
10 Jan 2023
24 Dec 2022
9 Jan 2023
25 Dec 2022
24 Dec 2022 - 1 Jan 2023
Amount
Laying and jointing( Including all welding and cutting works ) 150 mm/6” dia MS pipe line including manual transportation of material from store to site or as per instruction of EIC ( Only industrial gas & truck supplied by department)
Dismantling of 150 mm/6” dia MS pipe line including transportation of pipe to required place & stacking them as per instruction of EIC ( Only industrial gas & truck supplied by department )
Laying and jointing (Including all welding and cutting works) 100 mm/4” dia GI pipe line including manual transportation of material from store to site or as per the instruction of EIC
Dismantling of 100 mm/4” dia GI pipe line including transportation of pipe to the required place and stacking them as per instruction of EIC ( Only Industrial gas & truck supplied by department)
Laying & jointing (Including all welding and cutting works) 75 mm/3” dia GI pipe line including manual transportation of material from store to site or as per instruction of EIC ( only industrial gas & truck supplied by the department
Dismantling of 75 mm /3” dia GI pipe line including transportation of pipe to the required place and stacking them as per instruction of EIC ( only industrial gas & truck supplied by the department
Fitting of 3”/4”/6” sluice valve with complete arrangement ( only industrial gas & truck supplied by the department)
Supply of MS nut bolt & washer 5/8 X 3” of size as per need
Welding of MS & GI pipe line
Dismantling of the 3”, 4”, 6” dia sluice valve, monitor, hydrant etc with complete arrangement
Supply and fixing of rubber packing of different size
Total impact of GST for the purpose of CTC
M/S DS CONSTUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .