Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.9 LAccepted-AOC | ₹16.9 L | 1 | Accepted-AOC Accepted |
| 2 | 2₹16.9 LRejected-Finance | ₹16.9 L | 2 | Rejected-Finance High Bid Quantity Amount |
| Sl No | Description | Qty | Unit | D Jayakumar L2 | VIVEKKUMAR L1 |
|---|---|---|---|---|---|
| 1.00Name of Work: Construction of compound wall with Paver block in Inspection Bungalow at Sulthanpet H/O Varapatti | |||||
| 2.00 | Earth work excavation for foundation in all siols and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out waater wherever necessary and refilling with excavated earth in layers of not more than 15cm thick well ramed and consolidated and depositing the surplus earth in all place shown by Departmental officer with initial lead and lift, etc including all the site complete complying with standrad specifications. a) In hard stiff clay, stiff black cottan soil, hard red earth shales, murams, gravel, stoney earth muds with 50% fair size boulders including all cos as per SS 20 B | 55.43 | Cum | 263.8 ₹14,622.43 | 263.7 ₹14,616.89 |
| 3.00 | Cement concrete 1:4:8 ( One cement Four, sand And eight Metal ) mix using 40mm HG metal including cost and conveyance of all materials to site and all labour for watering, wherever necessary and laid in layers not more than 15 cm thick compacting etc., complet complying with standard specification and as directed.. | 9.76 | Cum | 5,542 ₹54,089.92 | 5,541 ₹54,080.16 |
| 4.00 | Supply and errection of steel centering for RCC works using MS sheets and angles and strutting upto 3.00 in height including cost and conveyance of all materials to site and all labour charges etc complete. Below Ground level | 68.54 | Sqm | 547.5 ₹37,525.65 | 547.5 ₹37,525.65 |
| 5.00 | Supply and errection of steel centering for RCC works using MS sheets and angles and strutting upto 3.00 in height including cost and conveyance of all materials to site and all labour charges etc complete. Above Ground level | 59.34 | Sqm | 1,095 ₹64,977.30 | 1,095 ₹64,977.30 |
| 6.00 | Supplying,fabricating and placing Mild steel / Ribbed Tor steel rods for reinforcement for all reinforced cement concreate works such as plinth beam,lintels,beams,sunshade,roof and floor slabs etc complete. | 1.68 | MT | 91,890 ₹1.5 L | 91,880.5 ₹1.5 L |
| 7.00 | Reinforced Cement concrete 1:1.5:3 mix using 20 mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials and labour charges for laying and curing etc.,complete | 21.19 | Cum | 9,430 ₹2.0 L | 9,430.5 ₹2.0 L |
| 8.00 | FlyAsh Brick Masonry in cm 1:5 mix using FlyAsh Brick including cost and conveyance of all materials to site and all labour charges etc. complete. | 19.9 | Cum | 7,477 ₹1.5 L | 7,476.88 ₹1.5 L |
| 9.00 | Plastering with cm 1:5 12mm thick including cost and conveyance of all materials to site and all labour charges etc., complet complying with standard specification and as directed.. | 354.25 | Sqm | 290 ₹1.0 L | 285.9 ₹1.0 L |
| 10.00 | Painting two coats with approved exterior emulsion including ost and conveyance of all materials to site and all labour charges etc., complet complying with standard specification and as directed.. | 354.25 | Sqm | 262.48 ₹92,983.54 | 262.4 ₹92,955.20 |
Tender Value
₹18 L
EMD Value
₹18,000
Closing Date
11 Nov 2025, 3:00 pmClosed
Special Officer Varapatti Panchayat
Special Officer Varapatti Panchayat Sulthanpet Block - 641669
Construction of Compound Wall with Paver Block in Inspection Bungalow at Sulthanpet H/o Varapatti Panchayat
2025_RDTN_620062_1
01/Varapatti/2025
Open Tender
Civil Works
90 days
Work
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹18,000
23 Feb 2026
5 Nov 2025
11 Nov 2025
5 Nov 2025
11 Nov 2025
5 Nov 2025
Amount
Earth work excavation for foundation in all siols and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out waater wherever necessary and refilling with excavated earth in layers of not more than 15cm thick well ramed and consolidated and depositing the surplus earth in all place shown by Departmental officer with initial lead and lift, etc including all the site complete complying with standrad specifications. a) In hard stiff clay, stiff black cottan soil, hard red earth shales, murams, gravel, stoney earth muds with 50% fair size boulders including all cos as per SS 20 B
Cement concrete 1:4:8 ( One cement Four, sand And eight Metal ) mix using 40mm HG metal including cost and conveyance of all materials to site and all labour for watering, wherever necessary and laid in layers not more than 15 cm thick compacting etc., complet complying with standard specification and as directed..
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting upto 3.00 in height including cost and conveyance of all materials to site and all labour charges etc complete. Below Ground level
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting upto 3.00 in height including cost and conveyance of all materials to site and all labour charges etc complete. Above Ground level
Supplying,fabricating and placing Mild steel / Ribbed Tor steel rods for reinforcement for all reinforced cement concreate works such as plinth beam,lintels,beams,sunshade,roof and floor slabs etc complete.
Reinforced Cement concrete 1:1.5:3 mix using 20 mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials and labour charges for laying and curing etc.,complete
FlyAsh Brick Masonry in cm 1:5 mix using FlyAsh Brick including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering with cm 1:5 12mm thick including cost and conveyance of all materials to site and all labour charges etc., complet complying with standard specification and as directed..
Painting two coats with approved exterior emulsion including ost and conveyance of all materials to site and all labour charges etc., complet complying with standard specification and as directed..
Paver block Pavement
Earth work excavation for cutting in all siols and sub soil to full depth and refilling with excavated earth in layers of not more than 15cm thick well ramed and consolidated and depositing the surplus earth in all place shown by Departmental officer with initial lead and lift, etc including all the site complete complying with standrad specifications as per SS 20B
Cement concrete 1:4:8 (One of cement, four of sand and eight of hard broken stone) using 40mm size hard broken stone inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers
Supplying and erecting centring for side wall using mild steel sheets stiffened with mild steel angles as directed by the departmental officers.
CC 1:3:6 mix using 20mm metal including cost and conveyance of all materials to site and all labour charges etc., complete for
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying of 60mm thick high stregnth type of interlockeing block in M40 grade size 26 x 12 x 6 cm other than grey colour of required size with minimum compressive strength of 40 N/ Sqmm in uniform shape of approved make to be laid in larrying pattern with approved non sticking surface in the top and the rate including levelling the base, preparation of Sub base with sand cushion 30mm thick, laying out the pavement,cut the pieces t, to fit the edge, vibrating pavers,sweeping the sand grouting, providing transporting, loading unloading and laying of paver block as per Standard specifications
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
D Jayakumar (BID ID -1508201)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_741433.xls
BOQ • 0.24 MB
18000PB.pdf
Tender Documents • 0.26 MB
18000TB.pdf
Tender Documents • 0.51 MB
Download all tender documents and submit your bid