| 1 | L1₹45.8 LQualified 0 KALINAGAR NAMKUM KALINAGAR RANCHI JHARKHAND 834010 | RANCHI | JHARKHAND | 834010 | ₹45.8 L Quoted ₹47.0 L | L1 | Qualified |
| 2 | L2₹54.6 LQualified | ₹54.6 L | L2 | Qualified MSE, Category: General |
| 3 | Disqualified | - | - | Disqualified |
Tender Value
₹45.8 L
EMD Value
₹77,000
Closing Date
26 May 2026, 1:00 pmClosed
Round the clock electrical maint
9278578
GEM/2026/B/7494318
Two Packet Bid
Round the clock maint of BCHP WT to conv 8,Round the clock maint of BCHP Main route,round the clock
GeM Contract
Sonbhadra, Uttar Pradesh
Total value wise evaluation
BOQ
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| Round the clock maint of BCHP WT to conv 8 | - | HSN not specified by seller | 819 Job | 1,380.6 | 1,130,711.4 |
| Round the clock maint of BCHP Main route | - | HSN not specified by seller | 819 Job | 1,951.72 | 1,598,458.68 |
| round the clock Elect. maint of A CHP | - | HSN not specified by seller | 819 job | 1,102.12 | 902,636.28 |
| Shifting of 5 ton weights to WB | - | HSN not specified by seller | 16 job | 8,016.92 | 128,270.72 |
| Laying power cable up to 70 mm2 | - | HSN not specified by seller | 500 Meter | 10.62 | 5,310 |
| Laying power cable up to 70 to 400 mm2 | - | HSN not specified by seller | 300 Meter | 25.96 | 7,788 |
| Dismantling power cable up to 70mm2 | - | HSN not specified by seller | 300 Meter | 11.8 | 3,540 |
| Dismantling power cable upto 70 to 400mm2 | - | HSN not specified by seller | 300 Meter | 25.96 | 7,788 |
| Laying of different size of power cable | - | HSN not specified by seller | 300 Meter | 4.72 | 1,416 |
| Dismantling of difft of control cable | - | HSN not specified by seller | 400 Meter | 4.72 | 1,888 |
| Digging of existing cable trench | - | HSN not specified by seller | 400 Meter | 43.66 | 17,464 |
| Degging trench for relaying new cable | - | HSN not specified by seller | 90 Job | 107.38 | 9,664.2 |
| Straight through jointing of LT cable | - | HSN not specified by seller | 4 Job | 802.4 | 3,209.6 |
| END TERMINATION OF POWER CABLE | - | HSN not specified by seller | 40 Job | 610.06 | 24,402.4 |
| Straight through jointing of HT cable | - | HSN not specified by seller | 8 Job | 2,721.08 | 21,768.64 |
| bend termination of power cable head | - | HSN not specified by seller | 10 Job | 2,381.24 | 23,812.4 |
| Patrolling of HT cable upto 70mm2 | - | HSN not specified by seller | 100 Meter | 12.98 | 1,298 |
| Patrolling of LT cable up to 70mm2 | - | HSN not specified by seller | 1,000 Meter | 3.54 | 3,540 |
| Patrolling of HT cable upto 70 to 400mm2 | - | HSN not specified by seller | 100 Meter | 3.54 | 354 |
| Patrolling of control cable up 4mm2 | - | HSN not specified by seller | 1,000 Meter | 3.54 | 3,540 |
| Repairing fabrication of lighting panel | - | HSN not specified by seller | 12 Job | 364.62 | 4,375.44 |
| Rewinding of ceiling fan | - | HSN not specified by seller | 25 Job | 808.3 | 20,207.5 |
| Replacement of bearing of celing fan | - | HSN not specified by seller | 10 Job | 202.96 | 2,029.6 |
| Provide bearing in place of bush | - | HSN not specified by seller | 10 Job | 475.54 | 4,755.4 |
| Replacement of condenser of celing fan | - | HSN not specified by seller | 40 Job | 121.54 | 4,861.6 |
| Replacement of shaft of ceiling fan. | - | HSN not specified by seller | 25 Job | 107.38 | 2,684.5 |
| Complete OH of celing fan | - | HSN not specified by seller | 60 Job | 47.2 | 2,832 |
| cable trench of fuel handling area. | - | HSN not specified by seller | 10 Job | 480.26 | 4,802.6 |
| Cable trench JT No.1 and crusher house | - | HSN not specified by seller | 10 Job | 449.58 | 4,495.8 |
| Cable trench JT No.1 and JT No.2. | - | HSN not specified by seller | 10 Job | 1,506.86 | 15,068.6 |
| CHP transformer trench to AHD unit 12 | - | HSN not specified by seller | 10 Job | 422.44 | 4,224.4 |
| Cable trench from crusher house to WTs | - | HSN not specified by seller | 10 Job | 1,516.3 | 15,163 |
| Cleaning of MCC panel WT,SR FHD etc | - | HSN not specified by seller | 120 Job | 391.76 | 47,011.2 |
| Cleaning of SM,MD,Coolin g pump,WB area | - | HSN not specified by seller | 20 Job | 167.56 | 3,351.2 |
| Cleaning of control power panel FHD | - | HSN not specified by seller | 120 Job | 181.72 | 21,806.4 |
| Cleaning of LDB in fuel oil in BTPS. | - | HSN not specified by seller | 80 Job | 206.5 | 16,520 |
| Cleaning of control room,WB area A CHP | - | HSN not specified by seller | 81 Job | 307.98 | 24,946.38 |
| Cable rack and trays of fuel oil pump house | - | HSN not specified by seller | 9 Job | 632.48 | 5,692.32 |
| Cable rack trays riser of crusher house. | - | HSN not specified by seller | 27 Job | 540.44 | 14,591.88 |
| Cable rack trays riser of tower No.1 | - | HSN not specified by seller | 27 Job | 328.04 | 8,857.08 |
| Cable rack between J.T. No.1 and conv. 16 | - | HSN not specified by seller | 9 Job | 328.04 | 2,952.36 |
| Cable racks from JT No 1 and conv. 17. | - | HSN not specified by seller | 9 Job | 391.76 | 3,525.84 |
| Cable rack trays of old stacker. | - | HSN not specified by seller | 9 Job | 1,414.82 | 12,733.38 |
| Cable rack trays of new stacker. | - | HSN not specified by seller | 9 Job | 2,415.46 | 21,739.14 |
| Cable rack trays from J.T. No.1 and J.T. 2 | - | HSN not specified by seller | 9 Job | 724.52 | 6,520.68 |
| Cable rack trays of riser of J.T. No.2 | - | HSN not specified by seller | 18 Job | 1,506.86 | 27,123.48 |
| Cable rack minus 4M gallery CHP Room | - | HSN not specified by seller | 9 Job | 3,620.24 | 32,582.16 |
| Cable rack berween T.T. No.2 and T.T.No.3 | - | HSN not specified by seller | 9 Job | 901.52 | 8,113.68 |
| Cable rack trays riser of tippler area. | - | HSN not specified by seller | 9 Job | 3,320.52 | 29,884.68 |
| Cable rack trays riser of wagon tippler. | - | HSN not specified by seller | 9 Job | 901.52 | 8,113.68 |
| Cable rack trays of conv. K10 | - | HSN not specified by seller | 9 Job | 391.76 | 3,525.84 |
| Cable rack trays of conv. K16. | - | HSN not specified by seller | 9 Job | 391.76 | 3,525.84 |
| Cleaning of floor gallery minus 4M CHP | - | HSN not specified by seller | 18 Job | 873.2 | 15,717.6 |
| Ceaning of panel in fuel oil | - | HSN not specified by seller | 32 Job | 297.36 | 9,515.52 |
| Cleaning of SG room, trench A CHP | - | HSN not specified by seller | 42 Job | 365.8 | 15,363.6 |
| Cleaning of A CHP cable trench SG area | - | HSN not specified by seller | 42 Job | 365.8 | 15,363.6 |
| Cable trenches from C.H. to WTs CHP | - | HSN not specified by seller | 1 Job | 87,008.48 | 87,008.48 |
| Cable trenches from JT No.1 to C.H. | - | HSN not specified by seller | 1 Job | 15,092.2 | 15,092.2 |
| Cable trenches from JT No.1 to JT 2 | - | HSN not specified by seller | 1 Job | 5,908.26 | 5,908.26 |
| Cable trenches from WT A CHP to ID fan | - | HSN not specified by seller | 1 Job | 27,173.04 | 27,173.04 |
| Cable trays from WT A CHP to ID fan | - | HSN not specified by seller | 9 Job | 1,446.68 | 13,020.12 |
| O.H. and maint. of 5 and 10T Hoists BCHP | - | HSN not specified by seller | 4 Job | 10,728.56 | 42,914.24 |
| O.H. and maint. of 20 and 5T Hoists and EOT ACHP | - | HSN not specified by seller | 4 Job | 11,567.54 | 46,270.16 |
2 documents required · 2 mandatory
DY. CHIEF ACCOUNT OFFICER, Obra Thermal Power Plant, Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL), (Dy. Cao, Cfa And Bo, Btps, Obra)
₹77,000
11 Aug 2026
5 May 2026
26 May 2026
| Item No | Item Title | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|
| 1 | Round the clock maint of BCHP WT to conv 8 | 819 | Job | ee_chd3_btps_obra | 273 |
| 2 | Round the clock maint of BCHP Main route | 819 | Job | ee_chd3_btps_obra | 273 |
| 3 | round the clock Elect. maint of A CHP | 819 | job | ee_chd3_btps_obra | 273 |
| 4 | Shifting of 5 ton weights to WB | 16 | job | ee_chd3_btps_obra | 273 |
| 5 | Laying power cable up to 70 mm2 | 500 | Meter | ee_chd3_btps_obra | 273 |
| 6 | Laying power cable up to 70 to 400 mm2 | 300 | Meter | ee_chd3_btps_obra | 273 |
| 7 | Dismantling power cable up to 70mm2 | 300 | Meter | ee_chd3_btps_obra | 273 |
| 8 | Dismantling power cable upto 70 to 400mm2 | 300 | Meter | ee_chd3_btps_obra | 273 |
| 9 | Laying of different size of power cable | 300 | Meter | ee_chd3_btps_obra | 273 |
| 10 | Dismantling of difft of control cable | 400 | Meter | ee_chd3_btps_obra | 273 |
contract_GEMC-511687737455845.pdf
GEM_CONTRACT • 0.30 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9278578.pdf
GEM_BID • 0.30 MB
tsdannex_2026-05-01-13-55-37_8c49e0e550419f26c4b6ac68433ee4bd.pdf
BOQ • 9.38 MB
boq_2026-05-01-13-55-37_4a1c37455156bc739f2d5394f8d7ed0c.csv
BOQ • 0.01 MB
TSDAnnex_518272af-eab2-4ff7-aec01777624556300_ee_chd3_btps_obra.pdf
GEM_OTHER • 9.38 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].