| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-Finance | ₹1.8 Cr | L1 | Accepted-Finance Lowest quoted |
| 2 | L2₹1.9 Cr+₹16.0 L (8.99%)Rejected-Finance | ₹1.9 Cr+₹16.0 L (8.99%) | L2 | Rejected-Finance Highest quoted |
Tender Value
₹2.1 Cr
EMD Value
₹2.1 L
Closing Date
23 Feb 2024, 3:00 pmClosed
THE COMMISSIONER, SALEM CITY MUNICIPAL CORPORATION
Salem City Municipal Corporation, Fort Main Road, Salem
Restoration of Damaged BT Road in Division No.1,2,3,20,22,24,26 of Suramangalam Zone
2024_MAWS_420583_1
E4-EST NO-88-R-2023-2024
Open Tender
Civil Works - Roads
Lump-sum
90 days
SALEM CITY MUNICIPAL CORPORATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.1 L
SALEM CITY MUNICIPAL CORPORATION
8 May 2024
8 Feb 2024
23 Feb 2024
8 Feb 2024
23 Feb 2024
8 Feb 2024
13 Feb 2024
Amount
(I). BT Road
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
Charges for Cutting the BT Surface to 5 to 7 cm depth using milling machine, conveying the milled waste materials to at least for 20 km distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental and unforeseen iterms etc, complete. as per the direction of the departmental officers
Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications
Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications.
Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications.
Painting center line, edge line road marking 100 width with Thermoplastic Paint (hot application) in such way that painting length will be 3.00m with a gap of 3.00m with a gap of 3.00 m curved portion and in straight portion painting length will be 3.00m with a gap of 3.00m curved for centerline by indigenous hand propelled road marking machine with single coat including cost of all materials such as pigments, extender, fine aggregate stand oil (Binder) glass beads as per 3262:1976 for the preparation of thermoplastic paint at site mixing glass beeds 10% by wieght of the ingredient at the time of preparation of paint and 10% glass beads but wt. at the time of application of paint on the road surface, including cost of all etc., complete
SSD AND CO
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .