| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹16.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹17.5 L+₹1.0 L (6.27%)Admitted-Fee/PreQual/Technical/Finance 2 516E THIRUVALLUVAR NAGAR MALLUMICHAMPATTY POST COIMBATORE | COIMBATORE | TAMIL NADU | 638459 | ₹17.5 L+₹1.0 L (6.27%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹17.5 L+₹1.0 L (6.37%)Admitted-Fee/PreQual/Technical/Finance 2 1 MIN NAGAR KOTTUR ROAD SULEESWARANPATTI POLLACHI 624006 | 624006 | ₹17.5 L+₹1.0 L (6.37%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹17.7 L+₹1.3 L (7.64%)Admitted-Fee/PreQual/Technical/Finance 135 135A PALANISAMY TOWER DHARMARAJ LAYOUT SOWRIPALAYAM CROSS ROAD RAMANATHAPURAM COIMBATORE 641 045 | COIMBATORE | TAMIL NADU | 641045 | ₹17.7 L+₹1.3 L (7.64%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹19.0 L+₹2.6 L (15.7%)Admitted-Fee/PreQual/Technical/Finance | ₹19.0 L+₹2.6 L (15.7%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | M/S THANGARAJ & CO L3 | K.C & CO L6 | MJ Infrastructures L1 | TECTUS INFRA PVT LTD L4 | SHREE MEENAKSHI BUILDERS L7 | SHREE KUMARAN CONSTRUCTION L2 | LAKSHMI NARAYANAN & CO L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all soils and sub soils to full depth as may be directed by the departmental officers except in hard rock requiring blasting but inclusive of shoring, strutting and balling out water wherever nessasary and depositing the surplus earth within initial lead of 10 metre and initial lift of 2 metre etc., complete as per Standard specifications SS | 152 | M3 | 180 ₹27,360 | 209 ₹31,768 | 176 ₹26,752 | 189.5 ₹28,804 | 220 ₹33,440 | 187.02 ₹28,427.34 | 80 ₹12,160 Lowest |
| 2.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregater) using 40mm BSS HBG metal including cost of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS | 152 | M3 | 4,900 ₹7,44,800 | 5,664.29 ₹8,60,972.08 | 4,769.94 ₹7,25,030.27 Lowest | 5,134 ₹7,80,368 | 5,962.42 ₹9,06,287.84 | 5,068.65 ₹7,70,435.29 | 5,500 ₹8,36,000 |
| 3.00 | Providing and fixing Bitumen Pad for Expansion ‘oint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and - conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification ; | 8 | M2 | 100 ₹800 Lowest | 455.05 ₹3,640.4 | 383.2 ₹3,065.6 | 412.5 ₹3,300 | 479 ₹3,832 | 407.2 ₹3,257.58 | 350 ₹2,800 |
| 6.00 | Cement concrete 1:2:4 (one cement, two sand and four aggregater) using 20mm BSS HBG metal and including cost of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS | 152 | M3 | 6,400 ₹9,72,800 | 6,903.49 ₹10,49,330.48 | 5,813.47 ₹8,83,647.74 Lowest | 6,257 ₹9,51,064 | 7,266.84 ₹11,04,559.68 | 6,177.54 ₹9,38,986.18 | 6,900 ₹10,48,800 |
| 7.00 | Conveyance of the excavated earth work and includin: all cost etc complete., | 92 | M3 | 55 ₹5,060 | 98.8 ₹9,089.6 | 82 ₹7,544 | 89.55 ₹8,238.6 | 104 ₹9,568 | 88.41 ₹8,133.76 | 50 ₹4,600 Lowest |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
1 Sept 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Providing CC Flooring at Gandhinagar West Street, Periyar Nagar Extension, Bharathi Street and Kasturi Bai Gandhi Nagar in Ward No 53 East Zone
2026_MAWS_694674_20
E52/2026-Single Cover
Open Tender
Civil Works - Roads
Works
150 days
Coimbatore corporation
As per tender conditions
5 documents required · 5 mandatory
₹0
₹25,000
2 Sept 2026
17 Aug 2026
2 Sept 2026
17 Aug 2026
1 Sept 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all soils and sub soils to full depth as may be directed by the departmental officers except in hard rock requiring blasting but inclusive of shoring, strutting and balling out water wherever nessasary and depositing the surplus earth within initial lead of 10 metre and initial lift of 2 metre etc., complete as per Standard specifications SS | 152 | M3 | - | - |
| 2 | Cement concrete 1:4:8 (one cement, four sand and eight aggregater) using 40mm BSS HBG metal including cost of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS | 152 | M3 | - | - |
| 3 | Providing and fixing Bitumen Pad for Expansion ‘oint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and - conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification ; | 8 | M2 | - | - |
| 6 | Cement concrete 1:2:4 (one cement, two sand and four aggregater) using 20mm BSS HBG metal and including cost of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS | 152 | M3 | - | - |
| 7 | Conveyance of the excavated earth work and includin: all cost etc complete., | 92 | M3 | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
Document.pdf
Tender Documents • 0.59 MB
BOQ_835247.xls
BOQ • 0.26 MB
ITB.pdf
Additional Documents • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .