| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.8 LAccepted-Finance | ₹29.8 L | L1 | Accepted-Finance FOUND OK |
| 2 | L2₹30.3 LAccepted-Finance | ₹30.3 L | L2 | Accepted-Finance FOUND OK |
| 3 | L3₹30.8 LAccepted-Finance | ₹30.8 L | L3 | Accepted-Finance FOUND OK |
| Sl No | Description | Qty | Unit | M/S SWASTIC CONTRUCTION L2 | M/S J P CONSTRACTION COMPANY L1 | SHRI HANUMAN ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00Safe loading Carriage including unloading and proper stacking of following materials from central store Barabanki / JE Store to site of work. | ||||||
| 1.01 | PCC Pole 8.5 Mtr long | 120 | Nos. | 1,255 ₹1.5 L | 1,250 ₹1.5 L | 1,260 ₹1.5 L |
| 1.02 | PCC Pole 11 Mtr long | 12 | Nos. | 1,355 ₹16,260 | 1,350 ₹16,200 | 1,360 ₹16,320 |
| 1.03 | 33/11kv Pin Insulator . | 320 | Nos. | 21 ₹6,720 | 20 ₹6,400 | 22 ₹7,040 |
| 1.04 | 33/11kv Disc Insulator . | 70 | Nos. | 21 ₹1,470 | 20 ₹1,400 | 22 ₹1,540 |
| 1.05 | 33/11kv X-ARM | 35 | Nos. | 102 ₹3,570 | 100 ₹3,500 | 103 ₹3,605 |
| 1.06 | MS Earthing Rod | 70 | Nos. | 65 ₹4,550 | 60 ₹4,200 | 70 ₹4,900 |
| 1.07 | Transformer 25/63/100 KVA | 18 | Nos. | 6,100 ₹1.1 L | 6,000 ₹1.1 L | 6,150 ₹1.1 L |
| 1.08 | Transformer 250 KVA | 3 | Nos. | 15,050 ₹45,150 | 15,000 ₹45,000 | 15,100 ₹45,300 |
| 1.09 | ABC Cable 3x50SQ. MM. | 2,000 | Mtr. | 21 ₹42,000 | 20 ₹40,000 | 22 ₹44,000 |
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
19 Mar 2026, 2:00 pmClosed
SE EDC BARABANKI
33/11 KV SUBSTATION BAREL BARABANKI
87/2025-26/
2026_MVVNL_1124908_1
87/2025-26/EDC BARABANKI
Open Tender
Electrical Works
30 days
EDD HAIDERGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE EDC BARABANKI
₹30,000
23 Mar 2026
13 Mar 2026
19 Mar 2026
13 Mar 2026
19 Mar 2026
13 Mar 2026
Safe loading Carriage including unloading and proper stacking of following materials from central store Barabanki / JE Store to site of work.
PCC Pole 8.5 Mtr long
PCC Pole 11 Mtr long
33/11kv Pin Insulator .
33/11kv Disc Insulator .
33/11kv X-ARM
MS Earthing Rod
Transformer 25/63/100 KVA
Transformer 250 KVA
ABC Cable 3x50SQ. MM.
ABC Cable 3x95 SQ. MM.
ABC Cable 3x120 SQ. MM.
ABC Cable 1x25+1x16 SQ. MM.
33/11 KV XLPE Cable 3x70++3x120+3x185,3x300 sqmm
ACSR Weasal Conductor/dog /rabit
LT D.B. Box
11 KV CT/PT Unit
11 KV Metering Cubical/pilfer
Stay Set Complete
Other Line Material
Dragging of pole from JE Dump Store to site
Erection of Stay set of 16x1800 mm rod duly painted with red oxide,anchor plate, and stay insulate etc.
Stringing and sagging of 11 KV line with ACSR Weasal/dog/rabit Conductor including nuzzling binding and jumpering (weasal conductor will be provided by the department)
Pipe Earthing ( Boring type 40 Feet)
Installation of Mounting of Following capacity of Transformer including its connection between 11 KV and LT Line mounting provinding Crimping type Aluminium lugs of required size.( All the material except transformer will be arranged by the contractor)
Mounting of 25/63/100 KVA Tranformer
Mounting of 250 KVA Tranformer
Installation of fixing 11 KV CT/PT with required meterial.
Installation of fixing 11 KV Pilfer Unit with required meterial.
Errection of Substation type double pole with PCC /STP 8.5/11/13 Pole Mtr. Long . including mounting of Top Channal Dropper Channel, base angle with clamps with nut & bolt, fitting of 33/11 KV pin & Pin insulator.
Errection of Substation type four pole with PCC /STP 8.5/11/13 Pole Mtr. Long . including mounting of Top Channal Dropper Channel, base angle with clamps with nut & bolt, fitting of 33/11 KV pin & Pin insulator.
Errection of single PCC /ST Pole for Stringing, jumpharing and sagging of conductor 1/6 of total length of poles
Stringing and Sagging of LT 1x16 ABC Cable (LT ABC Cable will be provided by the department)
Stringing and Sagging of LT 3x50 ABC Cable (LT ABC Cable will be provided by the department)
Stringing and Sagging of LT 3x95ABC Cable (LT ABC Cable will be provided by the department)
Stringing and Sagging of LT 3x120ABC Cable (LT ABC Cable will be provided by the department)
Installation of D.B. Box
Earthing of pole with MS Earthing.
Provinding & Fixing of various type materials. All materials shall be supplied by the contractor.
Nut & Bolt
PG CLAMP
Clamp for Top/ Dropper and T-off2/Stay/LT clamp /F-clamp GI PIPE CLAMP etc.
GI Pipe 3"&4'' DIA
D.O fuse set
basing angle
L T Insulator
Looping and Choopping of tree branches in laying on the route of line.
Laying of 11kv XLPE Cable 3x70, 120,185 Sq. By MM Manually
11 KV XLPE Cable 3x70++3x120 hanging with pole
felling and heat treatment of cable box
Concreating and pilinthing of ST& PCC Pole 18x24 CM.
Wairmesh fencing of 11/.04 kv substation shall be made recatangular off size as per site requirment fabrication 45x45x5mm angle .. (All the material will be arranged by the contractor)
Construction of massionry type transformer plinth of sutable size. (All the material will be arranged by the contractor at his own cost).
Construction of LT Distribution Cum LT Protection Box in Rectangle Shape made of MS Angle For Installation of Henley Type Tailness Fuse Unit 300/500 AMP 650 Volt 3 nos Outgoing Circuits With 4 Nos.Bus Bar Proper Grouting of Structure by digging of pits with the help of cement, coresand and aggregate in the ratio 1:3:6 and fabrication of structure complete.
Fabricate with hole suitable size in steel items, receive from central store light as top channel/dropper channel sub station base angle etc.
Looping of cable and mounting of pole.
hiting and felling cable box
Gaurding of 11 KV Line
Dismentaling of 11 KV Line & poll
Other line work
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
Tenderno87docu.pdf
Tender Documents • 1.23 MB
BOQ_2096495.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid