Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹6.1 Laccepted-aoc | accepted-aoc |
Tender Value
₹6.1 L
EMD Value
₹15,500
Closing Date
9 Dec 2025, 7:31 pmClosed
Minor Irrigation Department
EXECUTIVE ENGINEER
ANNUAL MAINTENANCE OF ARAKANAHALLI AND KUNDHANAKUPPE LIS
MI/2025-26/LI/WORK_INDENT8911
MI/2025-26/LI/WORK_INDENT8911
Open
Lift Irrigation Scheme
Two Tender Document System(Two Cover)
Minor Irrigation Division Mandya
7 documents required · 7 mandatory
To qualify for award of this contract, each tenderer in its name should have in the last five years period i.e. 2020-21 to 2024-25 satisfactory completion as a prime contractor for at least Maintenance Of LIS of value not less than Rs 3.05 Lakhs
Department Registration Details
List of existing commitments and ongoing work
List of works for which tenders already submitted
To qualify for award of this contract, each tenderer in its name should have in the last five years period i.e. 2020-21 to 2024-25. Achieved in at least one financial year a minimum annual financial turn over of Rs 6.09 Lakhs (usually not less than the estimated cost under this contract for works costing up to 100 Lakhs).
The tenderer should be registered with the Karnataka Labor Department for the supply of manpower. The agency shall provide the valid registration certificate for the concurrent period
The tenderer should have registered with EPF and ESI departments and should furnish certified copies of registration along with enrollment numbers.
The wages quoted by the contractor shall not be less than the basic wages specified. Otherwise it will not be considered for evaluation
Total value of civl engineering works executed and payments received in the last five years (year-wise)
Banker Details
₹500
₹15,500
9 Dec 2025
2 Dec 2025
10 Dec 2025
3 Dec 2025
ANNUAL MAINTENANCE OF ARAKANAHALLI AND KUNDHANAKUPPE LIS FOR THE YEAR 2025-26
Supply of watchman for watch and ward works of the scheme (Page No.25. IV Un-skilled category SL No.7 of Volume 4 part 1 of CSR for the year 2023-24)
Suppply of Machine (Pump) Operator for operating pump and motoar machinery of the scheme and as per the directions of Engineer in charge of the work(Vol No 1 Page No A 50 - IT No II skilled (17)of co...
Supply of Patakaries for Water Management Of the Schme(Page No.25-II Skilled Category Sl No.31 of Volume 4 Part-1 of CSR for the year 2023-24)
Rewinding of monoblock motor with coper insulation wire suitable guage as per ISI specifications with all necessary materials and labour, tools and equipment with gurantee period of not less than 12 m...
Supplying Ball Bearing as per ISI Specification with Gurantee period of Not less than twleve months bearing cost per 195 HP
Supplying and fixing and wiring Earth Eletrod for grounding Circuits IS Cutouts and others equipment and the material board in the pit the pits Should be filled up with Eqal protection of site and Cho...
Supplying and fixing kinetic Air Valve Pn16.0 for automatic discharge of acceumulate air during workin g condition, conforming to IB 14845/EN 1074-4, Body and bonnet of DI Confirming to IS-1865 of gra...
Labour Charges only for fixing double/isulated AIR Valves (C1 tamper proof of PN 16.0) Confirming to ISS 14845-2000 and as detail below with required stub and flange, conveying to work site, loading,...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KW 1 GEN-ARAKANAHALLI.doc
Tender Document • 1.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .