| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance | ₹1.8 Cr | L1 | Admitted-Finance |
| 2 | L1₹1.8 CrAdmitted-Finance | ₹1.8 Cr | L1 | Admitted-Finance |
| 3 | L2₹1.8 Cr+₹6.2 L (3.44%)Admitted-Finance | ₹1.8 Cr+₹6.2 L (3.44%) | L2 | Admitted-Finance |
| 4 | L3₹1.9 Cr+₹14.2 L (7.94%)Admitted-Finance | ₹1.9 Cr+₹14.2 L (7.94%) | L3 | Admitted-Finance |
| 5 | L4₹2.0 Cr+₹17.7 L (9.88%)Admitted-Finance | ₹2.0 Cr+₹17.7 L (9.88%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GANGA ELECTRICALS L4 | KHAN ENTERPRISES L2 | M/S Ajay Tripathi L1 | M/S Grid Power Systems L5 | M/S R.G. TRADERS L3 | D N S ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|---|---|
| 0.00Erection of 11 KV Line, 11 KV VCB, & Laying of 11 KV XLPE Cable, Installation of 25 KVA/63 KVA/100 KVA/250KVA/400 KVA for giving connection to consumer under Rambagh/Naini/Kalyani Devi/Karelabgh in Deposit Scheme including loading, unloading & safe carriage of all materials from Store centre Naini to working site and vice-versa in the direct supervision of Executive Engineer, E.U.D.D. Rambagh, Naini, Kalyani Devi & Karelabgh, Prayagraj. | |||||||||
| 1.00 | Installation, Testing , Commissioning & Earthing with G.I. strip(50x6 sqmm) of 11 KV VCB (O/G 200/100/5A) in all respect at sub stations at plinth (Plinth material will be provided by contractor) | 2 | Job | 40,999 ₹81,998 | 2,00,000 ₹4,00,000 | 28,888 ₹57,776 | 41,881 ₹83,762 | 10,000 ₹20,000 Lowest | 28,888 ₹57,776 |
| 2.00Erection of Single Pole STP/PCC complete with its all accessories at the requirement of site condition for cable hanging (stay clamp with nut bolt will be provided by the contractor) | |||||||||
| 2.01 | 9 Mtr. Long STP | 250 | No. | 3,999 ₹9,99,750 | 5,000 ₹12,50,000 | 6,888 ₹17,22,000 | 6,128 ₹15,32,000 | 2,500 ₹6,25,000 Lowest | 6,888 ₹17,22,000 |
| 2.02 | 11 Mtr. Long STP | 250 | No. | 3,999 ₹9,99,750 | 6,000 ₹15,00,000 | 6,888 ₹17,22,000 | 7,149 ₹17,87,250 | 3,000 ₹7,50,000 Lowest | 6,888 ₹17,22,000 |
| 2.03 | 8.5 Mtr. Long PCC | 50 | No. | 3,999 ₹1,99,950 | 5,000 ₹2,50,000 | 5,888 ₹2,94,400 | 6,128 ₹3,06,400 | 2,500 ₹1,25,000 Lowest | 5,888 ₹2,94,400 |
| 2.04 | 9 Mtr. Long PCC | 10 | No. | 5,999 ₹59,990 | 5,500 ₹55,000 | 5,888 ₹58,880 | 9,192 ₹91,920 | 2,500 ₹25,000 Lowest | 5,888 ₹58,880 |
| 3.00 | Grouting of ST/PCC pole 8.5/9/11 meter, Grouting in ratio 1:4:8, Cement, Stone Grit & Coarse Sand (all grouting material provided by the contractor) | 560 | No. | 599 ₹3,35,440 | 1,000 ₹5,60,000 | 688 ₹3,85,280 | 612 ₹3,42,720 | 500 ₹2,80,000 Lowest | 688 ₹3,85,280 |
| 4.00Plinthing of STP 9/11 Mtr (all material provided by the contractor) | |||||||||
| 4.01 | 9 Mtr. Long S.T.P. | 250 | No. | 99 ₹24,750 Lowest | 900 ₹2,25,000 | 588 ₹1,47,000 | 203 ₹50,750 | 300 ₹75,000 | 588 ₹1,47,000 |
Tender Value
₹2.4 Cr
EMD Value
₹4.8 L
Closing Date
12 Aug 2024, 2:00 pmClosed
Superintending Engineer
Superintending Engineer, E.U.D.C.-1, 57, George Town, Prayagraj
Refer to Tender Description
2024_PVVNV_942537_1
07/SE/EUDC-I-Pra/2024-25
Open Tender
Electrical Works
Lump-sum
365 days
Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Yes
Account Number-0012002100504911
₹4.8 L
Yes
27 Aug 2024
31 Jul 2024
12 Aug 2024
31 Jul 2024
12 Aug 2024
31 Jul 2024
Amount
Erection of 11 KV Line, 11 KV VCB, & Laying of 11 KV XLPE Cable, Installation of 25 KVA/63 KVA/100 KVA/250KVA/400 KVA for giving connection to consumer under Rambagh/Naini/Kalyani Devi/Karelabgh in Deposit Scheme including loading, unloading & safe carriage of all materials from Store centre Naini to working site and vice-versa in the direct supervision of Executive Engineer, E.U.D.D. Rambagh, Naini, Kalyani Devi & Karelabgh, Prayagraj.
Installation, Testing , Commissioning & Earthing with G.I. strip(50x6 sqmm) of 11 KV VCB (O/G 200/100/5A) in all respect at sub stations at plinth (Plinth material will be provided by contractor)
Erection of Single Pole STP/PCC complete with its all accessories at the requirement of site condition for cable hanging (stay clamp with nut bolt will be provided by the contractor)
9 Mtr. Long STP
11 Mtr. Long STP
8.5 Mtr. Long PCC
9 Mtr. Long PCC
Grouting of ST/PCC pole 8.5/9/11 meter, Grouting in ratio 1:4:8, Cement, Stone Grit & Coarse Sand (all grouting material provided by the contractor)
Plinthing of STP 9/11 Mtr (all material provided by the contractor)
9 Mtr. Long S.T.P.
11 Mtr. Long S.T.P.
Earthing of ST/PCC pole 8.5/9/11 Mtr.
Erection, 11 Mtr. long D/P for metering purpose with CT, PT unit (only CT, PT unit provided by Department and all required material like as S/S Base, Top Channel, Dropper Angle, Clamps, Nuts & Bolts provided by contractor)
Installation, Testing, commissioning & earthing of 11 KV Pilfer Proof metering cubical (provided by Department)
Erection of D/P for installation of 25/63/100/250/400 KVA T/F (All required material except T/F like as S/S base, Top Channel, LA with structure, Clamp and Nuts & Bolts etc. As per RESSPO Norms will be provided by contractor)
Painting of ST pole 9/11 Mtr. with the help of one coated red oxide & aluminum paint.
Hanging of XLPE 3x70/120 sq mm cable at existing & Newly Constructed 9/11 Mtr. Long PCC/STP/Rail pole with the help of stay set clamp and stay wire. (Stay clamp with nuts & bolt provided by contractor)
Laying of 11 kV 3x70/120 sq. mm XLPE cable in by digging of trench 1050 mm deep, 750 mm wide including supply of required material, Ist class bricks, stone pad. The cable shall be laid between two continuous rows of bricks River sand packing on all side of cables shall be done. The stone slab shall be laid on top of rows of the bricks parallel to the ground in such manner so that channels are formed covered in either direction.
Laying of 11 KV 3x70/120 sq mm XLPE cable by HDD Machine Drill method with HDPE Pipe. The cable shall be laid below not less than the depth of 1050 mm from the surface of road (HDPE pipe 4 inch with clamp provided by the contractor)
Erection & grouting of stay Rod with Cement, Sand and Bricks ballast in ratio 1:4:8 and fastening the stay wire with pole and stay rod nuzzling.
Trimming of Tree Branches.
Fixing H.S. type 11 KV 3X70 sqmm O/D, I/D cable joints & end terminations (all material provided by the contractor)
11 kv 3x70/120 sqmm outdoor box
11 kv 3x70/120 sqmm indoor box
11 kv 3x70/120 sqmm Straight through box
Hoisting of 11 KV 11 KV 3X70/120 sq mm XLPE cable by providing GI pipe of size 6” dia 3 M long on single pole support including its jumpering, complete with clamps, nut & bolts. (GI pipe, clamp with nuts & bolt provided by contractor)
Installation of Danger board with clamp and nut bolt, Number plate with clamp and nut bolt & Barbed wire at each pole (all required material will be provided by the contractor)
Installation & commissioning of T/F 250/400 KVA along with HT/LT connections including DO, 11 KV TPMO set Complete in all respect at DP. (All materials like as DO, 11 KV TPMO, Clamp, Nuts & Bolts etc. will be provided by the contractor at his own cost. Only T/F will be provided by the Department.)
Installation & commissioning of 25/63/100/160 KVA T/F along with HT/LT connections including DO, GO & 11 KV TPMO set Complete in all respect At DP. (All materials like as DO, 11 KV TPMO, Clamp, Nuts & Bolts etc. will be provided by the contractor at his own cost. Only T/F will be provided by the Department.)
Chemical pipe Earthing of Transformer body and neutral as per RESSPO Norms (All required materials will be provided by the contractor at his own cost.)
Installation, grouting and commissioning of L.T. tailless unit 1 no 500 amp and 3 no 300amp for each transformer with cubical Box/Distribution Box 400 Amp at Land/DP complete in all respect for 250/400 KVA T/F. (All required materials will be arranged by the contractor at his own cost.)
Installation and commissioning of Distribution Box 200 Amp at DP complete in all respect for 25/63/100/160 KVA T/F. (All required materials will be arranged by the contractor at his own cost.)
Earthing of L.T. Cubical box/Distribution Box by M.S. earthling rod and connecting it with G.I. Strips of size 35x6 mm with clamp for neutral & L.T. cubical box body. (Only M.S. Earthing rod will be provided by the Department and all other required materials will be provided by the contractor at his own cost.)
Laying of 3.5x400/3.5x240/3.5x70/3.5x35/3.5x25sqmm L.T. cable from T/F to L.T. Cubicle Box and from LT Cubical Box to LT Line with proper lugging and tagging with the help of copper Z/L Clamp. (Only L.T. Cable will be provided by the Department and all other required materials will be arranged by the contractor at his own cost.)
Laying of 1x630/ 1x400/1x240 sqmm /1x70 sqmm L.T. cable from T/F to L.T. Cubicle Box and from LT Cubical Box to LT Line with proper lugging and tagging with the help of copper Z/L Clamp. (Only L.T. Cable will be provided by the Department and all other required materials like as Alu. Lug, Z/L Clamps etc. will be arranged by the contractor at his own cost as per site requirement.)
Hanging of 3x120+1x95+1x16/3x95+1x70+1x16 sqmm LT ABC on already existing/erected pole complete in all respect. (all required material for hanging of AB cable like dead end clamp, piercing connecter, suspension clamp with i-hook ,LT DB box and others required materials will be provided by the contractor as per site requirement, only LT AB cable will be provided by the department)
Stringing of ACSR Dog/Weasel conductor for neutral wire for LT ABC to be replaced / installed
Construction of 11/0.4 KV Transformer plinth as per drawing attach.
Providing and fixing of welded wiremesh fencing, around transformer plinth having one locking arrangement, Fencing should be provided by grouting MS angle 40x40x5 mm. length of 2 m. on all the sides as per standard practice and design as per RESSPO. The painting of fencing should be done by good quality aluminum paint with two coats after rubbing and cleaning and providing one coat red oxide primer. The fencing should be 2 mtr. above ground level. The rate should be inclusive of all materials required for completion of above work.
Stringing of ACSR Dog/Weasel conductor at newly/all ready existing pole for 11 KV line for fixing of all required accessories like as 11 KV X-Arms, F-Bracket, 11 KV T-Off channel/side bracket, 11 KV pin with insulator, 11 KV Disc with fitting, Nuts & Bolt etc) (All required material except ACSR Dog/Weasel conductor will be provided by contractor)
Restoration Charges of utility
Road Restoration
Telephone, Sewer Line etc.
LT/HT Line
M/S Ajay Tripathi
KHAN ENTERPRISES
M/S R.G. TRADERS
GANGA ELECTRICALS
M/S Grid Power Systems
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .