Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹34.5 LAccepted-AOC | 1 | Accepted-AOC BEING LOWEST BIDDER | |
| 2 | 2₹41.4 L+₹5.6 L (15.8%)Rejected-Finance HOUSE NO 228 NEAR GURUDWARA MOHADDIPUR GORAKHPUR PIN 273110 | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273110 | 2 | Rejected-Finance BEING NOT LOWEST | |
| 3 | 3₹41.5 L+₹5.7 L (16.0%)Rejected-Finance | 3 | Rejected-Finance BEING NOT LOWEST | |
| 4 | 4₹42.4 L+₹6.6 L (18.4%)Rejected-Finance | 4 | Rejected-Finance BEING NOT LOWEST | |
| 5 | 5₹45.0 L+₹9.2 L (25.8%)Rejected-Finance | 5 | Rejected-Finance BEING NOT LOWEST |
| Sl No | Description | Qty | Unit | Sanjai sales and services L4 | M/s Comfort Air Conditioning and Refrigeration Engineers L6 | MK Enterprises L1 | Vijay Electricals L11 | M/s A.K Construction L8 | Mahendra Construction L2 | M/S PRATAP ENTERPRISES L9 | M/S SHAILZA TRADERS L10 | MATRUBHOOMI ENTERPRISES L7 | M/S RAJEEV KUMAR L3 | M/s Aradhana Enterprises L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches n. exc 1.5 m wide and n.exc 1.5 m in depth and getting out soft/loose soil complete all as specified and as directed for laying of under ground cable, foundation of pole and stay etc. complete all as specified and as directed | 660 | Cum | 204 ₹1,34,640 | 190 ₹1,25,400 | 140 ₹92,400 Lowest | 206 ₹1,35,960 | 175 ₹1,15,500 | 285 ₹1,88,100 | 166 ₹1,09,560 | 196 ₹1,29,360 | 210 ₹1,38,600 | 325 ₹2,14,500 | 206 ₹1,35,960 |
| 2.00 | Returning, filling in, including spreading, levelling, watering and well remmining in layers not exc 25 cm. | 400 | Cum | 100 ₹40,000 | 118 ₹47,200 | 35 ₹14,000 Lowest | 134 ₹53,600 | 145 ₹58,000 | 180 ₹72,000 | 181 ₹72,400 | 196 ₹78,400 | 158 ₹63,200 | 150 ₹60,000 | 151 ₹60,400 |
| 3.00 | Removing excavated material n.exc 50 m and depositing where directed at a level n. exc 1.5 m above the starting point all as directed. | 260 | Cum | 222 ₹57,720 | 185 ₹48,100 | 55 ₹14,300 Lowest | 213 ₹55,380 | 225 ₹58,500 | 350 ₹91,000 | 186 ₹48,360 | 213 ₹55,380 | 226 ₹58,760 | 300 ₹78,000 | 214 ₹55,640 |
| 4.00 | M&L for sand cushioning to U/G cable in layers of 23 cm thick( 8 Cm before laying the cable and 15 Cm thick after laying the cable) in trenches complete all as specified and directed.Note :- Only Puned down volume shall be measured. | 230 | Cum | 1,689 ₹3,88,470 | 1,845 ₹4,24,350 | 450 ₹1,03,500 Lowest | 1,889 ₹4,34,470 | 2,100 ₹4,83,000 | 950 ₹2,18,500 | 2,330 ₹5,35,900 | 2,745 ₹6,31,350 | 2,200 ₹5,06,000 | 800 ₹1,84,000 | 2,074 ₹4,77,020 |
| 5.00 | Supply and lay burnt best quality locally available old size sub class 'B' bricks laid in trenches perpendicular to U/G cable for cable protection complete all as specified and as directed. | 19,000 | Each | 4.5 ₹85,500 Lowest | 5 ₹95,000 | 5 ₹95,000 | 11 ₹2,09,000 | 5.25 ₹99,750 | 5 ₹95,000 | 7 ₹1,33,000 | 10 ₹1,90,000 | 7 ₹1,33,000 | 6 ₹1,14,000 | 6.7 ₹1,27,300 |
| 6.00 | Laying only serviceable bricks obtained from the items specified here-in-before (i.e during taking out of under ground cable),laid flat dry, in trenches with width of the bricks laid to the axis of cable for protection of cable complete all as specified and as directed | 8,000 | Each | 1 ₹8,000 | 1.5 ₹12,000 | 5 ₹40,000 | 7 ₹56,000 | 2 ₹16,000 | 2 ₹16,000 | 7 ₹56,000 | 8 ₹64,000 | 4 ₹32,000 | 2 ₹16,000 | 0.9 ₹7,200 Lowest |
| 7.00 | Taking out unserviceable LT U/G cable from trenches of size 6 Sqmm to 120 Sqmm 2/3.5/4 core complete all as specified and as directed. | 5,110 | RM | 10 ₹51,100 | 14 ₹71,540 | 5 ₹25,550 Lowest | 13 ₹66,430 | 12 ₹61,320 | 17.5 ₹89,425 | 7 ₹35,770 | 13 ₹66,430 | 20 ₹1,02,200 | 15 ₹76,650 | 15.5 ₹79,205 |
| 8.00 | Supply and lay in trenches or passing through pipe XLPE insulated armoured, heavy duty electric cable with aluminium conductor 1100 volts grade, cross-sectional area 10 Sqmm 4 core | 2,500 | RM | 162 ₹4,05,000 | 160 ₹4,00,000 | 200 ₹5,00,000 | 171 ₹4,27,500 | 188 ₹4,70,000 | 180 ₹4,50,000 | 124 ₹3,10,000 Lowest | 133.9 ₹3,34,750 | 144 ₹3,60,000 | 175 ₹4,37,500 | 142 ₹3,55,000 |
| 9.00 | All as per item No-8 above but of size 16 sqmm 4 core. | 1,250 | RM | 178 ₹2,22,500 | 180 ₹2,25,000 | 200 ₹2,50,000 | 203 ₹2,53,750 | 210 ₹2,62,500 | 185 ₹2,31,250 | 156 ₹1,95,000 Lowest | 163.7 ₹2,04,625 | 199 ₹2,48,750 | 190 ₹2,37,500 | 207 ₹2,58,750 |
| 10.00 | All as per item No-8 above but of size 25 sqmm 4 core. | 350 | RM | 239 ₹83,650 | 350 ₹1,22,500 | 220 ₹77,000 | 308 ₹1,07,800 | 315 ₹1,10,250 | 205 ₹71,750 | 199 ₹69,650 | 191.4 ₹66,990 Lowest | 287.4 ₹1,00,590 | 230 ₹80,500 | 297.5 ₹1,04,125 |
Tender Value
₹47.8 L
EMD Value
₹95,600
Closing Date
13 Jul 2026, 6:00 pmClosed
GE(AF) GORAKHPUR
GE(AF) GORAKHPUR PINCODE-273008
REAPIR/MAINT OF STREET LIGHT/SECURITY LIGHTS, JUNCTION BOXES, TIME SWITCHES AND CONNECTED ITEMS IN AKASH VIHAR,VIJAY VIHAR AREA AND REPAIR/ MAINT OF LT EXTERNAL ELECTRIC SUPPLY, AND CONNNECTED ITEMS , LT PANELS, LT CABLES, DISPLAY BOARD, SIGN BOARDS,
2026_MES_773102_1
9457/E8
Open Tender
Miscellaneous Works
Item Rate
180 days
GE(AF) GORAKHPUR
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE(AF) GORAKHPUR
₹95,600
Yes
13 Aug 2026
20 Jun 2026
15 Jul 2026
20 Jun 2026
13 Jul 2026
4 Jul 2026
20 Jun 2026 - 3 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches n. exc 1.5 m wide and n.exc 1.5 m in depth and getting out soft/loose soil complete all as specified and as directed for laying of under ground cable, foundation of pole and stay etc. complete all as specified and as directed | 660 | Cum | 10 | ₹6,600 |
| 2 | Returning, filling in, including spreading, levelling, watering and well remmining in layers not exc 25 cm. | 400 | Cum | 10 | ₹4,000 |
| 3 | Removing excavated material n.exc 50 m and depositing where directed at a level n. exc 1.5 m above the starting point all as directed. | 260 | Cum | 10 | ₹2,600 |
| 4 | M&L for sand cushioning to U/G cable in layers of 23 cm thick( 8 Cm before laying the cable and 15 Cm thick after laying the cable) in trenches complete all as specified and directed.Note :- Only Puned down volume shall be measured. | 230 | Cum | - | - |
| 5 | Supply and lay burnt best quality locally available old size sub class 'B' bricks laid in trenches perpendicular to U/G cable for cable protection complete all as specified and as directed. | 19,000 | Each | - | - |
| 6 | Laying only serviceable bricks obtained from the items specified here-in-before (i.e during taking out of under ground cable),laid flat dry, in trenches with width of the bricks laid to the axis of cable for protection of cable complete all as specified and as directed | 8,000 | Each | - | - |
| 7 | Taking out unserviceable LT U/G cable from trenches of size 6 Sqmm to 120 Sqmm 2/3.5/4 core complete all as specified and as directed. | 5,110 | RM | - | - |
| 8 | Supply and lay in trenches or passing through pipe XLPE insulated armoured, heavy duty electric cable with aluminium conductor 1100 volts grade, cross-sectional area 10 Sqmm 4 core | 2,500 | RM | - | - |
| 9 | All as per item No-8 above but of size 16 sqmm 4 core. | 1,250 | RM | - | - |
| 10 | All as per item No-8 above but of size 25 sqmm 4 core. | 350 | RM | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
TENDERDOUCMENT.pdf
Tender Documents • 1.17 MB
BOQ_865685.xls
BOQ • 2.34 MB
amedentdate01.pdf
PDF • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .