Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹1.2 Cr+₹3.2 L (2.79%)Rejected-Finance | ₹1.2 Cr+₹3.2 L (2.79%) | L2 | Rejected-Finance Higher Bidder |
| 3 | L3₹1.2 Cr+₹3.9 L (3.42%)Rejected-Finance | ₹1.2 Cr+₹3.9 L (3.42%) | L3 | Rejected-Finance Higher Bidder |
| 4 | L4₹1.2 Cr+₹4.8 L (4.18%)Rejected-Finance BAZAR RAM SUKH DASS FEROZEPUR CITY 152002 | FIROZEPUR | PUNJAB | 152002 | ₹1.2 Cr+₹4.8 L (4.18%) | L4 | Rejected-Finance Higher Bidder |
| 5 | Rejected-Technical H NO 37 VIKAS VIHAR PHASE II FEROZEPUR CITY PB 152002 | FEROZEPUR CITY | FEROZEPUR | PUNJAB | 152002 | - | - | Rejected-Technical Rejected due to below two class bidder |
| Sl No | Description | Qty | Unit | M/S Yashpaul Gulati L2 | Harmesh Kumar Sharma and Sons L3 | Supreme Constructions L4 | G D TRADERS L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Scarifying or picking existing gravelled macadam or bituminous macadam surface, area not exceeding 400 Sqm and depth exceeding 50mm and not exceeding 100mm (average 75mm) and segregating serviceable stone metal for re-using and removal of debris from site to a distance upto 50 metres spread & leveled complete all as specified and directed. | 15 | Ten Sqm | 320 ₹4,800 | 330 ₹4,950 | 320 ₹4,800 | 299 ₹4,485 Lowest |
| 2.00 | M&L for repairs to potholes of area not exc 1 sqm each and depth exceeding 30mm and including sweeping free from dust and mud using Air Compressor, or water, scoring sunken surfaces in roads, paths, etc. cutting around edges to at least 30mm in depth, making good by applying tack coat using pavng bitumen VG-10 @ 5 Kg per 10 Sqm, putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 Kg per 10 Sqm, blinded with 0.09 Cum of 6.3mm size stone chippings and again well rammed (including supply of premixed macadam, binder and chippings) complete all as specified and directed. Note:- SDAC shall not be provided where this item is operated. | 15 | Ten Sqm | 2,020 ₹30,300 | 2,050 ₹30,750 | 2,020 ₹30,300 | 1,980 ₹29,700 Lowest |
| 3.00 | M&L for preparing existing black top surfaces by brushing with wire brushes for removing caked mud etc. Sweeping with brooms and finally fanning the cleaned surface with Air Compressor to remove all loose dirt etc complete all as specified and directed. | 1,400 | Ten Sqm | 150 ₹2,10,000 | 180 ₹2,52,000 | 160 ₹2,24,000 | 149 ₹2,08,600 Lowest |
| 4.00 | M&L for applying evenly a priming/tack coat over existing black top surfaces with bituminous primer at 5 Kg per 10 Sqm using VG-10 bitumen of road surface by sprayer operated by hot pressure mechanism, complete all as specified and directed. | 1,400 | Ten Sqm | 320 ₹4,48,000 | 330 ₹4,62,000 | 310 ₹4,34,000 | 309 ₹4,32,600 Lowest |
| 5.00 | M&L for 30mm consolidated thickness Bituminous Premix Semi Dense Asphaltic Concrete (SDAC) using paving bitumen VG-30 with 5.5 % binder by weight of total mix using Job Mix Formula (Design Mix) including mixed with waste plastic @ 6 % to 8 % of weight of bitumen as per clause 5.2 of SP 98-2013, rolled and compacted to required camber and gradient complete with 8 to 12 tonne power roller as per clause 508 of MoRTH & IRC specifications , complete all as specified and directed. | 1,000 | Ten Sqm | 2,790 ₹27,90,000 Lowest | 2,930 ₹29,30,000 | 2,830 ₹28,30,000 | 2,870 ₹28,70,000 |
| 6.00 | M&L for 40mm consolidated thickness Bituminous Premix Semi Dense Asphaltic Concrete (SDAC) using paving bitumen VG-30 with 5.5 % binder by weight of total mix using Job Mix Formula (Design Mix) including mixed with waste plastic @ 6 % to 8 % of weight of bitumen as per clause 5.2 of SP 98-2013, rolled and compacted to required camber and gradient complete with 8 to 12 tonne power roller as per clause 508 of MoRTH & IRC specifications , complete all as specified and directed. | 400 | Ten Sqm | 3,790 ₹15,16,000 | 3,570 ₹14,28,000 | 4,070 ₹16,28,000 | 3,500 ₹14,00,000 Lowest |
| 7.00 | M&L for providing and consolidating 40 mm thick premix Dense Bituminous Macadam (DBM grading - II) using paving bitumen (VG-30) minimum 4.5% by weight of total mix using Job Mix Formula (Design Mix), spread, rolled and compacted to required camber and gradient complete with 8 to 12 tonne power roller as per clause 507 of MoRTH & IRC specifications , complete all as specified and directed.
Note :- (i) BC wearing coat shall be laid on the same day over DBM without extra tack coat. If BC is not laid on the same day, tack coat @ 2.5 Kg/10 Sqm of bitumen shall be sprayed over DBM without any extra cost. | 1,000 | Ten Sqm | 4,160 ₹41,60,000 | 4,100 ₹41,00,000 | 4,110 ₹41,10,000 | 4,000 ₹40,00,000 Lowest |
| 8.00 | M&L for premix bituminous macadam (Consolidated thickness 75mm or less) using paving bitumen (VG-30) 4% by weight of total mix using Job Mix Formula (Design Mix), spread, rolled and compacted to required camber and gradient complete with 8 to 12 tonne power roller as per clause 504 of MoRTH & IRC specifications , complete all as specified and directed.
Note :- (i) BC wearing coat shall be laid on the same day over BM without extra tack coat. If BC is not laid on the same day, tack coat @ 2.5 Kg/10 Sqm of bitumen shall be sprayed over BM without any extra cost. | 95 | Cum | 4,410 ₹4,18,950 Lowest | 4,612 ₹4,38,140 | 4,630 ₹4,39,850 | 4,500 ₹4,27,500 |
| 9.00 | Providing and marking broken/continuous central/end line on the road pavement and the like of description by using hot applied thermoplastic compound 2.50mm thick (excluding thickness of glass beads) and providing reflective glass beads @ 250 gm per square metre as per clause 803 of MoRTH & IRC-35 specifications, complete all as specified and as directed . | 950 | Sqm | 520 ₹4,94,000 | 520 ₹4,94,000 | 510 ₹4,84,500 | 490 ₹4,65,500 Lowest |
| 10.00 | M&L for Moorum / red bajri/ Coarse sand filling in floors or pavings, road berms etc, laid in layers n exc. 15cm thick, spread, levelled and rammed including dressings & watering complete all as specified and directed. | 20 | Cum | 1,110 ₹22,200 | 900 ₹18,000 Lowest | 1,110 ₹22,200 | 1,100 ₹22,000 |
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
9 Jun 2026, 6:00 pmClosed
CWE FEROZEPUR CANTT
HQ CWE FEROZEPUR CANTT PIN 152001
Repair to roads in MAP Md Accn and other central roads in area under GE (West) Ferozepur Cantt
2026_MES_765414_1
CWE/FZR-05/2026-27
Open Tender
Civil Works
Item Rate
120 days
FEROZEPUR CANTT
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
GE (West) Ferozepur Cantt
₹1.9 L
Yes
3 Jul 2026
14 May 2026
16 Jun 2026
14 May 2026
9 Jun 2026
4 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scarifying or picking existing gravelled macadam or bituminous macadam surface, area not exceeding 400 Sqm and depth exceeding 50mm and not exceeding 100mm (average 75mm) and segregating serviceable stone metal for re-using and removal of debris from site to a distance upto 50 metres spread & leveled complete all as specified and directed. | 15 | Ten Sqm | - | - |
| 2 | M&L for repairs to potholes of area not exc 1 sqm each and depth exceeding 30mm and including sweeping free from dust and mud using Air Compressor, or water, scoring sunken surfaces in roads, paths, etc. cutting around edges to at least 30mm in depth, making good by applying tack coat using pavng bitumen VG-10 @ 5 Kg per 10 Sqm, putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 Kg per 10 Sqm, blinded with 0.09 Cum of 6.3mm size stone chippings and again well rammed (including supply of premixed macadam, binder and chippings) complete all as specified and directed. Note:- SDAC shall not be provided where this item is operated. | 15 | Ten Sqm | - | - |
| 3 | M&L for preparing existing black top surfaces by brushing with wire brushes for removing caked mud etc. Sweeping with brooms and finally fanning the cleaned surface with Air Compressor to remove all loose dirt etc complete all as specified and directed. | 1,400 | Ten Sqm | - | - |
| 4 | M&L for applying evenly a priming/tack coat over existing black top surfaces with bituminous primer at 5 Kg per 10 Sqm using VG-10 bitumen of road surface by sprayer operated by hot pressure mechanism, complete all as specified and directed. | 1,400 | Ten Sqm | - | - |
| 5 | M&L for 30mm consolidated thickness Bituminous Premix Semi Dense Asphaltic Concrete (SDAC) using paving bitumen VG-30 with 5.5 % binder by weight of total mix using Job Mix Formula (Design Mix) including mixed with waste plastic @ 6 % to 8 % of weight of bitumen as per clause 5.2 of SP 98-2013, rolled and compacted to required camber and gradient complete with 8 to 12 tonne power roller as per clause 508 of MoRTH & IRC specifications , complete all as specified and directed. | 1,000 | Ten Sqm | - | - |
| 6 | M&L for 40mm consolidated thickness Bituminous Premix Semi Dense Asphaltic Concrete (SDAC) using paving bitumen VG-30 with 5.5 % binder by weight of total mix using Job Mix Formula (Design Mix) including mixed with waste plastic @ 6 % to 8 % of weight of bitumen as per clause 5.2 of SP 98-2013, rolled and compacted to required camber and gradient complete with 8 to 12 tonne power roller as per clause 508 of MoRTH & IRC specifications , complete all as specified and directed. | 400 | Ten Sqm | - | - |
| 7 | M&L for providing and consolidating 40 mm thick premix Dense Bituminous Macadam (DBM grading - II) using paving bitumen (VG-30) minimum 4.5% by weight of total mix using Job Mix Formula (Design Mix), spread, rolled and compacted to required camber and gradient complete with 8 to 12 tonne power roller as per clause 507 of MoRTH & IRC specifications , complete all as specified and directed.
Note :- (i) BC wearing coat shall be laid on the same day over DBM without extra tack coat. If BC is not laid on the same day, tack coat @ 2.5 Kg/10 Sqm of bitumen shall be sprayed over DBM without any extra cost. | 1,000 | Ten Sqm | - | - |
| 8 | M&L for premix bituminous macadam (Consolidated thickness 75mm or less) using paving bitumen (VG-30) 4% by weight of total mix using Job Mix Formula (Design Mix), spread, rolled and compacted to required camber and gradient complete with 8 to 12 tonne power roller as per clause 504 of MoRTH & IRC specifications , complete all as specified and directed.
Note :- (i) BC wearing coat shall be laid on the same day over BM without extra tack coat. If BC is not laid on the same day, tack coat @ 2.5 Kg/10 Sqm of bitumen shall be sprayed over BM without any extra cost. | 95 | Cum | - | - |
| 9 | Providing and marking broken/continuous central/end line on the road pavement and the like of description by using hot applied thermoplastic compound 2.50mm thick (excluding thickness of glass beads) and providing reflective glass beads @ 250 gm per square metre as per clause 803 of MoRTH & IRC-35 specifications, complete all as specified and as directed . | 950 | Sqm | - | - |
| 10 | M&L for Moorum / red bajri/ Coarse sand filling in floors or pavings, road berms etc, laid in layers n exc. 15cm thick, spread, levelled and rammed including dressings & watering complete all as specified and directed. | 20 | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Tender05.pdf
Tender Documents • 1.04 MB
BOQ_857253.xls
BOQ • 1.47 MB
RevisedTender05.pdf
PDF • 1.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .