Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.9 LAccepted-AOC | ₹20.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹20.9 LRejected-AOC | ₹20.9 L | L2 | Rejected-AOC L2 |
| 3 | L3₹20.9 LRejected-AOC | ₹20.9 L | L3 | Rejected-AOC L3 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹2.1 L
Closing Date
8 Apr 2026, 6:00 pmClosed
Executive officer, Nagar Panchayat Kulpahar
Executive officer, Nagar Panchayat Kulpahar
Construction of an RCC drain from the cremation ground culvert to Ganesh Soni house.
2026_DOLBU_1131756_2
524/Tender Notice/2025-26 DATED 30.03.2026
Open Tender
Civil Works
180 days
Executive officer, Nagar Panchayat Kulpahar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,478
Executive officer
₹2.1 L
9 Apr 2026
31 Mar 2026
9 Apr 2026
31 Mar 2026
8 Apr 2026
31 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
Photography work etc. | - | Job | - | - | BI01010001010000000000000515BI0100001113 | |
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:(All kinds of soil)
As per DSR-2.1.1 | - | cum | - | - | - | |
Supplying and filling in plinth with sand/stone dust under floors, including watering,ramming, consolidating and dressing complete.As per DSR-2.27 | - | cum | - | - | - | |
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).As per DSR-4.1.8 | - | cum | - | - | - | |
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) :.As per DSR-5.2.2 | - | cum | - | - | - | |
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars.As per DSR-5.22.1 | - | Qtl. | - | - | - | |
Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases for columns.As per DSR-4.3.1 | - | Sqm | - | - | - |
stage.html
html • 0.04 MB
techsummary_2111948.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_2111948.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid