Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹25.0 LAccepted-AOC SHIVNAGAR NEAR STD CONER DARJEELING MORE SILIGURI | SILIGURI | DARJEELING | WEST BENGAL | L 1 | Accepted-AOC Work Order | |
| 2 | L 2₹25.5 L+₹50,249.05 (2.01%)Rejected-Finance | L 2 | Rejected-Finance Financially Not Qualified | |
| 3 | L 3₹25.5 L+₹55,248.96 (2.21%)Rejected-Finance VILL BHADIISWAR PO MURARAI BIRBHUM PIN 731219 | MURARAI | BIRBHUM | WEST BENGAL | 731219 | L 3 | Rejected-Finance Financially Not Qualified |
Tender Value
₹25.0 L
EMD Value
₹49,999
Closing Date
6 Feb 2026, 6:00 pmClosed
BINOD KUMAR SHARMA
OFFICE OF THE EXECUTIVE ENGINEER, DARJEELING ENGINEERING DIVISION, LANDALE HOUSE, DARJEELING-734101
Construction of Protection wall and drains along Raghubir Busty to Dhanbir Busty road, Sonada.
2026_GTA_991350_1
77/2nd Call/DM/NIeT/EE/DED/GTA/25-26
Open Tender
CIVIL WORKS
Percentage
90 days
Darjeeling
As per NIeT
4 documents required · 4 mandatory
₹0
₹49,999
Yes
12 Feb 2026
20 Jan 2026
9 Feb 2026
20 Jan 2026
6 Feb 2026
20 Jan 2026
Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (iii) In mixed hard soil (i,e hard moorum and soil containing laterite and boulders which do not require blasting)
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
Removal of rubbish,earth etc. from theworking site and disposal of the same beyond the compound, in conformity with theMunicipal / Corporation Rules for such disposal, loadinginto truckandcleaning the site inall respect asper direction of Engineer in charge
Extra for carriage of all kinds of earth by Mechanical Transport: (e) Carriage up to total lead of 5.0 km.
Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth
Stone Boulder 150 mm of N. Bengal variety
(I) Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor (B) With N.B. Variety stone metal. (a) 1:3:6 proportion
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. (i) (1:3:6) proportion
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. A) Granular material
Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications.
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:4 cement mortar (a) 20 mm thick plaster
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
Add 18% GST
Add 1% Labour Cess
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.52 MB
GTAFORM.pdf
Tender Documents • 1.19 MB
BOQ_2423854.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .