Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance BYPASS NH NEAR SBI SIDHRA JAMMU | Admitted-Finance |
| 3 | Admitted-Finance GANGYAL JAMMU | Admitted-Finance |
| 4 | Admitted-Finance BARI BRAHMANA JAMMU | Admitted-Finance |
| 5 | Admitted-Finance HOUSING COLONY UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | Admitted-Finance |
Tender Value
₹12.5 L
EMD Value
₹25,000
Closing Date
22 Jul 2020, 4:00 pmClosed
Executive Engineer
Executive Engineer Jal Shakti PHE Division Akhnoor
Fixing Annual Rates contract for repair of horizontal centrifugal and submersible pump sets.
2020_PHE_99777_2
ENIT 52
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
7 days
Akhnoor
as per ENIT
6 documents required · 6 mandatory
₹1,000
Yes
Executive Engineer Jal Shakti PHE Division Akhnoor
₹25,000
Yes
6 Aug 2020
6 Jul 2020
23 Jul 2020
7 Jul 2020
22 Jul 2020
7 Jul 2020
Amount
HCP RKB Make
Repairing of pump shaft by jointing welding & turning to bearing size.
Providing, Fabrication & fitting of new pump shaft as per size and specification. (5 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (6 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (7 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (8 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (9 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (10 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (12 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (14 Stage Pump)
Providing and fitting of Brass Impeller
Providing and fitting of C.I Impeller
Repairing of brass Impeller
Repairing of C.I Impeller
Fabrication & fitting of neck ring.
Fabrication & fitting of diffuser bush
Fabrication of Stainless steel gland bush
Fabrication of chuck nut
Providing & Fitting of pump bowl
Repair to bearing housing by sleeve fitting & boring for bearing size
Providing of bearing housing along with side cover plate
Providing and fitting of Delivery Body
Providing and fitting of Suction Body
Replacement of ball thrust bearing-7307
Replacement of ball thrust bearing-7308
Replacement of ball thrust bearing-7309
Providing of diffuser
Replacement of Roller bearing-N-307
Replacement of Roller bearing-N-308
Replacement of Roller bearing-N-309
Providing & Fitting of Oil seal
Providing & Fitting of Heavy Duty Coupling Pulley
Providing & Fitting Coupling bolts nuts & rubber bushes.
Dismantling & fitting of Pump.
Repairs to V-6 submersible motor by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of Stud with nuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit.
Repairs to V-6 submersible motor by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set. Repairs to thrust pad 01 set. P/F of Stud with nuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit.
Repairs to V-8 submersible motor by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of Stud with nuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit.
Repairs to submersible motor (V-8) by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set. Repairs to thrust pad 01 set. P/F of Stud with nuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit.
Repair to submersible Motor (V-6) by extraction of broken copper strips from rotor than P/F of new copper strips (01 No.)& welding of the rotor, turning & finishing. Also repair to rotor end by rebuilding, turning & finishing.
Repair to submersible Motor (V-8) by extraction of broken copper strips from rotor than P/F of new copper strips (01 No.)& welding of the rotor, turning & finishing. Also repair to rotor end by rebuilding, turning & finishing.
Repairs to V-6 submersible motor by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set.Fitting of motor &coupled with pump & testing in the test pit.
Repairs to V-8 submersible motor by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set.Fitting of motor &coupled with pump & testing in the test pit.
Repairs to V-6 submersible motor by way of P/F of thrust pad 01 set. P/F of Stud with nuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit.
Repairs to V-8 submersible motor by way of P/F of thrust pad 01 set. P/F of Stud with nuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit.
Repair 25 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 25 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor.
Repair 25 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor.
Repair 40 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor.
Repair 40 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 40 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor.
Repair 50 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 50 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor.
Repair 50 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor.
Repair 60 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor.
Repair 60 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 60 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor.
Repair 100 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 70 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 100 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor.
Repair 100 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor.
Repair to 25 HP motor by way of replacement of bearing at one end and assembling of motor.
Repair to 40 HP motor by way of replacement of bearing at one end and assembling of motor.
Repair to 50 HP motor by way of replacement of bearing at one end and assembling of motor.
Repair to 60 HP motor by way of replacement of bearing at one end and assembling of motor.
Repair to 100 HP motor by way of replacement of bearing at one end and assembling of motor.
Repair to 25 HP motor by way of replacement of bearing at DE & NDE and assembling of motor.
Repair to 40 HP motor by way of replacement of bearing at DE & NDE and assembling of motor.
Repair to 50 HP motor by way of replacement of bearing at DE & NDE and assembling of motor.
Repair to 60 HP motor by way of replacement of bearing at DE & NDE and assembling of motor.
Repair to 100 HP motor by way of replacement of bearing at DE & NDE and assembling of motor.
Repair 75 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 75 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor.
Repair 75 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor.
Repair to 75 HP motor by way of replacement of bearing at DE & NDE and assembling of motor.
Repair to 75 HP motor by way of replacement of bearing at one end and assembling of motor.
HCP FNC Make
Repairing of pump shaft by jointing welding & turning to bearing size.
Providing, Fabrication & fitting of new pump shaft as per size and specification (9 Stage)
Providing and fitting of Brass Impellers
Providing and fitting of C.I Impellers
Repairing of brass Impellers
Repairing of C.I Impellers
Fabrication & fitting of neck ring.
Fabrication & fitting of body bushes.
Fabrication of Stainless steel gland bushes
Fabrication of chuck nut
Providing & Fitting of pump bowl
Repair to bearing housing by sleeve fitting & boring for bearing size
Providing of bearing housing along with side cover plates
Providing and fitting of Delivery Body
Providing and fitting of Suction Body
Providing, Fabrication & fitting of new pump shaft as per size and specification (10 Stage)
Replacement of Roller bearing-N-204
Replacement of Roller bearing-N-205
Providing, Fabrication & fitting of new pump shaft as per size and specification (12 Stage)
Providing & Fitting of Oil seal
Fabrication & fitting of balancing plate
Providing & Fitting Coupling bolts nuts & rubber bushes.
Dismantling & fitting of Pump.
HCP Mather & Platt Make
Repairing of pump shaft by jointing welding & turning to bearing size.
Providing, Fabrication & fitting of new pump shaft as per size and specification (7 Stage)
Providing and fitting of Brass Impellers
Providing and fitting of C.I Impellers
Repairing of brass Impellers
Repairing of C.I Impellers
Fabrication & fitting of neck ring.
Fabrication & fitting of spacer bushes.
Fabrication of Stainless steel gland bushes
Fabrication of chuck nut
Providing & Fitting of pump bowl
Repair to bearing housing by sleeve fitting & boring for bearing size
Providing of bearing housing along with side cover plates
Providing and fitting of Delivery Body
Providing and fitting of Suction Body
Replacement of ball thrust bearing-6306
Providing, Fabrication & fitting of new pump shaft as per size and specification (9 Stage)
Replacement of Roller bearing-NU-306
Providing, Fabrication & fitting of new pump shaft as per size and specification (10 Stage)
Providing & Fitting of Oil seal
Fabrication & fitting of balancing plate
Providing & Fitting Coupling bolts nuts & rubber bushes.
Dismantling & fitting of Pump.
Providing, Fabrication & fitting of new pump shaft as per size and specification 10 Stage
Providing, Fabrication & fitting of new pump shaft as per size and specification 14 Stage
HCP KSB Make
Repairing of pump shaft by jointing welding & turning to bearing size.
Providing, Fabrication & fitting of new pump shaft as per size and specification.
Providing and fitting of Brass Impellers
Providing and fitting of C.I Impellers
Repairing of brass Impellers
Repairing of C.I Impellers
Fabrication & fitting of neck ring.
Fabrication & fitting of spacer bushes.
Fabrication of Stainless steel gland bushes
Fabrication of chuck nut
Providing & Fitting of pump bowl
Repair to bearing housing by sleeve fitting & boring for bearing size
Providing of bearing housing along with side cover plates
Providing and fitting of Delivery Body
Providing and fitting of Suction Body
Replacement of ball thrust bearing-7309
Replacement of ball thrust bearing-7308
Providing & Fitting of Oil seal
Providing & Fitting Coupling bolts nuts & rubber bushes.
Dismantling & fitting of Pump.
Providing of Adaptor for V-6 Submersible motor
Providing of Adaptor for V-8 Submersible motor
Providing of Coupling pulley with cotter for V-6 Submersible motor
Providing of Coupling pulley with cotter for V-8 Submersible motor
Fabrication & providing of MS Clamp 3"
Fabrication & providing of MS Clamp 4"
Fabrication & providing of MS Shling for Gantry Post
Fabrication & providing of 80 mm dia. flanged adaptor with threading at other side
Fabrication & providing of 65 mm dia. flanged adaptor with threading at other side
Fabrication & providing of 100 mm dia. flanged adaptor with threading at other side
Fabrication & providing of 50 mm dia. flanged adaptor with threading at other side
Repairing of Submersible Pump (V-8)
Repairing of pump shaft
Fabrication of pump shaft
Fabrication of Neck Ring
Fabrication of Brass Impeller
Repairs to Impellers
Fabrication of Body Bushes
Fabrication of Guide Bush
Fabrication of Spacer Bush
Providing of Cotter
Fabrication of Pump Body
Providing of Suction Body
Providing of NRV with adaptor
Labour Charges for dismantling and fitting of pump
Repairing of Submersible Pump (V-6)
Repairing of pump shaft
Fabrication of pump shaft
Fabrication of Neck Ring
Fabrication of Brass Impeller
Repairs to Impellers
Fabrication of Body Bushes
Fabrication of Guide Bush
Fabrication of Spacer Bush
Providing of Cotter
Fabrication of Pump Body
Providing of Suction Body
Labour Charges for dismantling and fitting of pump
PERFECT ENGINEERING WORKS
M.S J K HYDRAULIC ENGGG AND FABRICATOR WORKS
M/S K S ENGG WORKS
JAGDEMBAY MECH ENGG WORKS
M/S V.N ENGG WORKS
G S ENGINEERING WORKS
HITECH MECHNICALS
VK Mechanical Works
M/S FASTTRACK ENGINEERS
AADISHWAR ELECTRICAL & MECH WORKS
Rishabh Electricals and Mechanical Works
M/S UK MECH AND ELECT ENGG WORKS
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .