Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.5 LAccepted-AOC | L1 | Accepted-AOC L1 Bider Eligible | |
| 2 | L2₹15.6 L+₹10,657.45 (0.69%)Rejected-AOC | L2 | Rejected-AOC L2 Bider Reject |
Tender Value
₹15.6 L
EMD Value
₹15,650
Closing Date
15 Jul 2025, 3:00 pmClosed
Block Development Officer (B.Pt) Muthupet Block
Block Development Officer (B.Pt) Muthupet Block
Package No 03/MTP/RBIOCGS/2025-26
2025_RDTN_579537_1
1829/2025/A2/07.07.2025
Open Tender
Civil Works - Buildings
Item Rate
180 days
Keelanamakurichi Panchayat
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,650
Yes
18 Jul 2025
8 Jul 2025
15 Jul 2025
8 Jul 2025
15 Jul 2025
8 Jul 2025
Amount
1.Renovation of PUM School (Three Class Room) RCC West facing in Pethavalankottagam @ Keelanammangkurichi Panchayat,
Dismantling damaged Plastered Surface and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Dismantling damaged Plastered Surface and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Chipping of concrete and roughening the surface Plain Cement Concrete and including for labour and all other incidental charges etc.,complete.
Dimantlig the Existing Pressed Tiles & Weathering Course and including for labour and all other incidental charges etc.,complete.
Paving the floor with kotta stone of size 610x610x 20mm cm 1:3 20mm thick including for labour and all other incidental charges etc.,complete.
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm of approved quality laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Plastering with CM 1:3,10mm thick. including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete
Distembering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Painting two coats over old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete
Blackboard Painting two coats over oldcement plastered surface with best approved best quality ofblackboard paint of approved colour over the existing priming coat etc., complete
Towards cost of Provision for Bala Painting including cost of painting materials and all labour charges etc complete
Repair to Steel Window
Provision For Fiber Board Arrangments
Providing Cubboard Arrangements for students
Providing Cubboard Arrangements for Techer
Providing Chappal Rack Arrangements
Provision for Name board
Photographic charges
2.Renovation of PUM School (Two Class Room) RCC East facing in Pethavalankottagam @ Keelanammangkurichi Panchayat.
Dismantling damaged Plastered Surface and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Paving the floor with pre-polished concrete anti-skid step tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete
Distembering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Painting two coats over old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete
Blackboard Painting two coats over oldcement plastered surface with best approved best quality ofblackboard paint of approved colour over the existing priming coat etc., complete
Towards cost of Provision for Bala Painting including cost of painting materials and all labour charges etc complete
Repair to Steel Window
Provision For Fiber Board Arrangments
Providing Cubboard Arrangements for students
Providing Cubboard Arrangements for Techer
Providing Chappal Rack Arrangements
Provision for Name board
Photographic charges
3. Renovation of PUM School Toilet (South Facing ) @ Pethavalankottagam in Keelanammankuruchi Panchayat.
Dismantling the existing Damaged wall plastering including all labour charges etc., completed
Dimantlig the Existing Demaged Roof Concrete and including for labour and all other incidental charges etc.,complete.
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles (Observed Data)
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Platering with CM 1:3 mix, 10mm thick including cost and conveynace and all laour charges etc., completed
Supply & errection of Centering with MS Sheet including for labour and all other incidental charges etc.,complete.
Supply & Fabrication of Steel with including for labour and all other incidental charges etc.,complete.
RCC 1:1.5:3 mix using 20mm ISS HBG Metal with including for labour and all other incidental charges etc.,complete.
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Exterior Emulsion two coats with best approvde Exterior Plastic Emulsion including cost of materils and all labour charges etc., completed
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
Supplying and fixing in position best Europead water closed White/Colour - Floor Mounting - including labour etc.,
Provision for Door
Provision for Sanitary Arrangement Including Pipes
Provision for Water Supply Including Pipes
Provision for Name board charges
Provision for Photo charges etc.,
4. Renovation of PUM School Toilet (East Facing ) @ Pethavalankottagam in Keelanammankuruchi Panchayat.
Dismantling the existing Damaged wall plastering including all labour charges etc., completed
Dimantlig the Existing Demaged Roof Concrete and including for labour and all other incidental charges etc.,complete.
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles (Observed Data)
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Platering with CM 1:3 mix, 10mm thick including cost and conveynace and all laour charges etc., completed
Supply & errection of Centering with MS Sheet including for labour and all other incidental charges etc.,complete.
Supply & Fabrication of Steel with including for labour and all other incidental charges etc.,complete.
RCC 1:1.5:3 mix using 20mm ISS HBG Metal with including for labour and all other incidental charges etc.,complete.
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Exterior Emulsion two coats with best approvde Exterior Plastic Emulsion including cost of materils and all labour charges etc., completed
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
Supplying and fixing in position best Europead water closed White/Colour - Floor Mounting - including labour etc.,
Provision for Door
Provision for Sanitary Arrangement Including Pipes
Provision for Water Supply Including Pipes
Provision for Name board charges
Provision for Photo charges etc.,
5. Renovation of PUE School Toilet (South Facing ) @ Mangalore in Keelanammankuruchi Panchayat.
Dismantling the existing Damaged wall plastering including all labour charges etc., completed
Dimantlig the Existing Demaged Roof Concrete and including for labour and all other incidental charges etc.,complete.
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Platering with CM 1:3 mix, 10mm thick including cost and conveynace and all laour charges etc., completed
Supply & errection of Centering with MS Sheet including for labour and all other incidental charges etc.,complete.
Supply & Fabrication of Steel with including for labour and all other incidental charges etc.,complete.
RCC 1:1.5:3 mix using 20mm ISS HBG Metal with including for labour and all other incidental charges etc.,complete.
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Exterior Emulsion two coats with best approvde Exterior Plastic Emulsion including cost of materils and all labour charges etc., completed
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
Supplying and fixing in position best Europead water closed White/Colour - Floor Mounting - including labour etc.,
Provision for Door
Provision for Sanitary Arrangement Including Pipes
Provision for Water Supply Including Pipes
Provision for Name board charges
Provision for Photo charges etc.,
6. Renovation of PUE School Toilet (East Facing ) @ Mangalore in Keelanammankuruchi Panchayat.
Dismantling the existing Damaged wall plastering including all labour charges etc., completed
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Exterior Emulsion two coats with best approvde Exterior Plastic Emulsion including cost of materils and all labour charges etc., completed
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
Supplying and fixing in position best Europead water closed White/Colour - Floor Mounting - including labour etc.,
Provision for Sanitary Arrangement Including Pipes
Provision for Water Supply Including Pipes
Provision For Septic tank Arrangements
Provision for Name board charges
Provision for Photo charges etc.,
7. Renovation of PUE School Toilet (East Facing) @ Keelanammankuruchi in Keelanammankuruchi Panchayat.
Dismantling the existing Damaged wall plastering including all labour charges etc., completed
Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles (Observed Data)
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Platering with CM 1:3 mix, 10mm thick including cost and conveynace and all laour charges etc., completed
Supply & errection of Centering with MS Sheet including for labour and all other incidental charges etc.,complete.
Supply & Fabrication of Steel with including for labour and all other incidental charges etc.,complete.
RCC 1:1.5:3 mix using 20mm ISS HBG Metal with including for labour and all other incidental charges etc.,complete.
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Exterior Emulsion two coats with best approvde Exterior Plastic Emulsion including cost of materils and all labour charges etc., completed
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
Supplying and fixing in position best Europead water closed White/Colour - Floor Mounting - including labour etc.,
Provision for Door
Provision for Sanitary Arrangement Including Pipes
Provision for Water Supply Including Pipes
Provision for Name board charges
Provision for Photo charges etc.,
8. Renovation of PUE School Toilet (East Facing) @ Keelanammankuruchi in Keelanammankuruchi Panchayat.
Dismantling the existing Damaged wall plastering including all labour charges etc., completed
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Platering with CM 1:3 mix, 10mm thick including cost and conveynace and all laour charges etc., completed
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Exterior Emulsion two coats with best approvde Exterior Plastic Emulsion including cost of materils and all labour charges etc., completed
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
Supplying and fixing in position best Europead water closed White/Colour - Floor Mounting - including labour etc.,
Provision for Sanitary Arrangement Including Pipes
Provision for Water Supply Including Pipes
Provision for Name board charges
Provision for Photo charges etc.,
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R.Saraswathi (BID ID -1402606)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .