Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Finance | +0.00% | ₹1.4 L | L1 | Admitted-Finance |
| 2 | L2₹1.5 L+₹7,134.60 (4.99%)Admitted-Finance | +4.99% | ₹1.5 L+₹7,134.60 (4.99%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 L+₹9,865.48 (6.90%)Admitted-Finance 1191 ARDEVOK ROAD BARASAT 24 PGS N KOL 700125 | BARASAT | NORTH 24 PARGANAS | WEST BENGAL | 700125 | +6.90% | ₹1.5 L+₹9,865.48 (6.90%) | L3 | Admitted-Finance |
Tender Value
₹1.4 L
EMD Value
₹3,000
Closing Date
8 Sept 2026, 12:00 pmClosed
Executive Engineer(Roads)
CHAPLIN BHAVAN, 2ND FLOOR , 5/2, CHOWRINGHEE PLACE , KOLKATA-700 013, WEST BENGAL
CONSTRUCTION OF REFUGE ISLAND ALONG PEDESTRIAN CROSSINGS AT THE JN. OF E.M. BYPASS AND BROADWAY ROAD CROSSING, IN FRONT OF SALT LAKE GATE AND DIFFERENT SPOTS UNDER BR III
2026_KMC_1039487_1
KMC/ROADS/2026-2027/219
Open Tender
CIVIL WORKS
Percentage
120 days
Broadway Road
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,000
17 Sept 2026
27 Aug 2026
10 Sept 2026
27 Aug 2026
8 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Brick work in C.M 1:5 mix including all labour charges etc complete | 4 | DAY | 6,000 | ₹24,000 |
| 2 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete | 0.46 | M3 | 4,761 | ₹2,179.94 |
| 3 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete | 81.4 | EA | 298.22 | ₹24,275.11 |
| 4 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in | 40.7 | SQM | 361 | ₹14,692.7 |
| 5 | b) CI bend 22.5° (250mm dia) | 3.05 | M3 | 5,732.59 | ₹17,498.73 |
| 6 | Construction of chamber for 100mm sluice plates | 40.7 | SQM | 828 | ₹33,699.6 |
| 7 | Construction of chamber for 100mm sluices valve | 10.18 | SQM | 38 | ₹386.65 |
| 8 | Supplying, Conveying and fixing spls. Including ea | 20.35 | SQM | 78 | ₹1,587.3 |
| 9 | Supplying, Conveying and fixing spls. Including ea | 20.35 | SQM | 81 | ₹1,648.35 |
| 70 | Sub Total | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_2552734.xls
BOQ • 0.28 MB
219FORM.pdf
Tender Documents • 0.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .