Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-Finance | ₹19.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹19.9 L+₹5,000.52 (0.25%)Rejected-Finance | ₹19.9 L+₹5,000.52 (0.25%) | L2 | Rejected-Finance L2 |
| 3 | L3₹19.9 L+₹10,001.03 (0.51%)Rejected-Finance | ₹19.9 L+₹10,001.03 (0.51%) | L3 | Rejected-Finance L3 |
Tender Value
₹20.0 L
EMD Value
₹40,004
Closing Date
5 Feb 2026, 6:00 pmClosed
ADM, INFRASTRUCTURE
ALIPURDUAR
Temporary Structure of wooden rack and other ancillary works for Strong Rooms at Alipurduar University Building and Hostel in connection with the West Bengal Legislative Assembly Election 2026 Alipurduar
2026_ZPHD_992934_1
DM DEO/WBLA ELEC -2026/APD-2/2026
Open Tender
CIVIL WORKS
Percentage
15 days
ALIPURDUAR
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹40,004
Yes
6 Apr 2026
22 Jan 2026
9 Feb 2026
22 Jan 2026
5 Feb 2026
22 Jan 2026
Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof.
1st Floor
75 mm. thick brick work with 1st class bricks set in cement, sand mortar (1:4) in ground floor including H.B. netting in every alternate layers.
1st Floor
2nd Floor
Supplying, fitting and fixing boiling water resistant ply conforming to IS: 303- 1989 bonded with phenol formaldehyde synthetic resin of approved make and brand fitted and fixed as per design as per approval and direction of Engineer-in- Charge.[excluding the cost of supporting frame work and teak wood batten/Lipping].In Ground Floor. (iii) 9mm.
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). (i) With 1:6 cement mortar, c) 15 mm thick plaster, Outer Wall.
1st Floor. (ii) With 1:4 cement mortar, b) 15 mm thick plaster, Outer Wall.
2nd Floor. (ii) With 1:4 cement mortar, b) 15 mm thick plaster, Outer Wall
Hire and labour charges for staging with sal bullah for super structure of bridge (Major and Minor) including stripping off and removing clearing on completion of work as per design and drawing approved by the Engineer-in-charge.
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface :With super gloss (hi-gloss) -(iv)(ii) Two coats (white in shade). (a) On timber or plastered surface :With super gloss (hi-gloss) - (ii) Two coats (white in shade).
Labour Welfare Cess @ 1%
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_2428199.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .