Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC | L1 | Accepted-AOC Quoted less than Tender Value | |
| 2 | L2₹8.1 L+₹12,532.28 (1.57%)Rejected-AOC S A | L2 | Rejected-AOC Quoted more than Tender Value |
| Sl No | Description | Qty | Unit | S A Srinivasan L2 | Banupriya L1 |
|---|---|---|---|---|---|
| 1.00Vellore district Construction of Community Sanitary Complex at PUM School Kutchipalayam in Tippasamuthiram Panchayat Anaicut Block 15th CFC-BP 2025-2026(TIED &UNTIED) Scheme Package no 14 | |||||
| 2.00 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 22.26 | cum | 267.87 ₹5,962.79 | 263.73 ₹5,870.63 Lowest |
| 3.00 | Filling with river sand including cost and coveyance of all materials to work site and all labour charges etc. | 3.48 | cum | 1,739.93 ₹6,054.96 | 1,713.03 ₹5,961.34 Lowest |
| 4.00 | Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick | 3.48 | Sqm | 46.56 ₹162.03 | 45.84 ₹159.52 Lowest |
| 5.00 | Filling with Gritty Gravel including cost and coveyance of all materials to work site and all labour charges etc. | 3.48 | cum | 281.64 ₹980.11 | 277.28 ₹964.93 Lowest |
| 6.00 | CC 1:4:8 mix using 40mm HBG metal including cost and conveyance and all labour charges and materials charges etc,.. | 8.37 | cum | 5,509.67 ₹46,115.94 | 5,424.48 ₹45,402.9 Lowest |
| 7.00 | Supply and fabrication of steel including cost and conveyance and all labour charges etc. complete. | 0.65 | no | 93,376.24 ₹60,694.56 | 91,932.61 ₹59,756.2 Lowest |
| 8.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 7 | cum | 9,478.77 ₹66,351.39 | 9,332.22 ₹65,325.54 Lowest |
| 9.00 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. | 14.87 | Sqm | 555.99 ₹8,267.57 | 547.39 ₹8,139.69 Lowest |
| 10.00 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. | 57.7 | Sqm | 1,111.97 ₹64,160.67 | 1,094.78 ₹63,168.81 Lowest |
Tender Value
Refer Docs
EMD Value
₹16,100
Closing Date
6 Oct 2025, 3:00 pmClosed
THE BLOCK DEVELOPMENT OFFICER,ANAICUT
THE BLOCK DEVELOPMENT OFFICER,ANAICUT
Vellore district Construction of Community Sanitary Complex at PUM School Kutchipalayam in Tippasamuthiram Panchayat Anaicut Block 15th CFC-BP 2025-2026(TIED and UNTIED) Scheme Package no 14
2025_RDTN_609368_1
A2/3074/2025 ACT SEP 49-25
Open Tender
Civil Works
Item Rate
180 days
THE BLOCK DEVELOPMENT OFFICE, ANAICUT
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹16,100
20 Nov 2025
26 Sept 2025
6 Oct 2025
26 Sept 2025
6 Oct 2025
26 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_728130.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .