Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 107 133 B MILLERPURAM TUTICORIN 628008 | TUTICORIN | TUTICORIN | TAMIL NADU | 628008 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical 9 WOMENS INDUSTRIAL PARK SIDCO THIRUMUDIVAKKAM KANCHIPURAM TAMIL NADU 600044 | CHENGALPATTU | TAMIL NADU | 600044 | Rejected-Technical The bidder has not furnished the copy of registration certificate as per NIT |
| 4 | Rejected-Technical | Rejected-Technical The bidder has not furnished the copy of registration certificate as per NIT |
| 5 | Rejected-Technical BENGALURU URBAN KARNATAKA 560049 INDIA UDYAM KR 03 0026295 | BENGALURU URBAN | KARNATAKA | 560049 | Rejected-Technical The bidder has not furnished the copy of notary attested registration certificate as per NIT |
Tender Value
Refer Docs
Closing Date
21 Dec 2021, 3:00 pmClosed
Chief Engineer
Chief Engineer, Civil Engineering Department, VOC Port Trust, Tuticorin.
Operation and Maintenance of 1MLD capacity of Sewage Treatment Plant for Period of Two years at VOC Port Trust
2021_VOCPT_98107_1
14CE/RCM BMR/2021-22/D.2999
Open Tender
Civil Works
Works
730 days
VOC Port Trust
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
Exempted
19 Jan 2022
13 Dec 2021
22 Dec 2021
13 Dec 2021
21 Dec 2021
13 Dec 2021
Amount
Maintaining the Sewage Treatment Plant (STP) sewerage pumps viz., Screen drum, USAB Reactor feed, Blower, Sludge drying beds, Solid waste disposal etc., for the collected sewage water received from Main pump house at Harbour Estate area by engaging 3 Nos. of Pump Operater (1st Shift - 1 No., 2nd Shift - 1 No. and Reliever - 1 No.) of well experienced and qualified Pump operator with ITI Certificate Without allowing any interruption to the STP system. The Tenderer should attend and replace the minor works in the motor pump whenever required during the contract period. The pump operator should clean the screens and keep the collected waste in the places for disposal and maintain the area neat & tidy. The cost including of wages to the pump operator, attending minor repair work in the motor pump etc., complete and as directed by the departmental officers. (Recovery will made as per special condition of the schedule, if the Pump Operator is found absent).
Engaging 1 No. of Lab. Technician with B.Sc. (Chemistry) for maintaining the laboratory with effective supervision in Sewage Treatment Plant (STP) by taking water samples daily (i.e.) raw water & treated water for Ph Value and to carryout Chemical Oxygen demand, Biological Oxygen demand, Total suspended soil value & furnish the report to the departmental officers at Three times in a Month regularly and monitoring the test value in STP Site Laboratory & the Lab. Technician should maintain the registers for the test results etc., complete and as directed by the departmental officers. (Recovery will made as per special condition of the schedule, if the Lab. Technician is found absent)
Supplying 2 Nos. of Unskilled Madzoor for segregation of Bio and Non - bio degradable waste received from the Harbour Estate area. The segregated bio degradable waste to be spread in to the pit evenly to a height of 0.15m to 0.20m in each Pit. Collected cow dung were converted into slurry and sprinkled on the top of organic material as seed (mixing cow dung with water-as-seed- avoid flooding of Pit). After sprinkling the cow dung slurry, a thin layer of river sand to be placed as bulking material to cover solid waste material. Soil microbe’s helps to degrade of organic matter under aerobic conditions. After one week, on the top of river sand, again a layer of organic materials followed by cow dung slurry and followed by river sand to be placed as second layer. Two to three times in a week, the entire material has to be turned upside and down for proper mixing as well as supply of oxygen. Intermittently water to be sprinkled to maintain Moisture content of 50 to 60% which is favorable for composting. Usually composting can be completed in 3 to 4 weeks duration. After completion of composting process, the compost is retained in the Pits for an additional 3 to 4 weeks period for curing, during the curing period, it take place decomposition of residual decomposable organic matter, reduction of fungi and actinomycetes, After completion of filling of waste material in one Pit, next pit is allowed for filling with waste material. After completion of curing of the compost, the composted materials to be sieved and packed in plastic gunny bags etc., Following work to be carried out as directed by the departmental officers (Recovery will made as per special condition of the schedule, if the Unskilled Mazdoor is found absent).
Engaging 3 Nos. of Watchman for Sewage Treatment Plant (STP) in 3 Shifts viz., I Shift, II Shift & III Shift for Watch duty and to maintain the register for vehicle entry in the STP Area and any other works as and when assigned etc., complete and as directed by the departmental officers. (Recovery will made as per special condition of the schedule, if the Watchman is found absent).
Supplying the Laboratory materials (Chemicals powdered / acids) for taking test for PH value, COD, BOD, and TSS. The chemicals are to be supplied during the contract period for day to day activities. The chemicals should be received from the Govt. Agency wtih necessary valid expiry date, necessary certificate & bill etc., complete as directed by departmental officers. The following materials are to be supplied by the contractor : 1) Mercury II Sulphate, Hgso4, in powder form - 1 Kg. 2) Silver sulphate, Ag2So4, in powder form - 150 gm. 3) Concentrated sulphuric acid - 4 Litre, 4) Ferrous Ammonium Sulphate - 4 Kg., 5)Potassium dichromate (K2Cr2O7) - 4 Kg., 6) Ferroin indicator (Feso4, 7H20) - 400 ml., 7) Sodium hydroxide, NaOH - 200 gm., 8) Filter paper (GFA) 11cm circle - 5 Boxes, 9) Manganese(II) sulfate MnSO4 - 2 Kg., 10) Potassium hydroxide (KOH) - 2 Kg., 11) Potassium Iodide KI - 1 Kg., 12) Sodium Azide NaN3 - 400 gm., 13) Starch - 2 Kg., 14) Sodium thiosulfate Na2S2O3, S H2O - 2 Kg., 15) Potassium di hydrogen phosphate, KH2PO4 - 2 Kg., 16) Dipotassium hydrogen phosphate K2HPO4 - 2 Kg., 17) Disodium hydrogen phosphate Na2HPO4, 7H2O, 7H2O - 2 Kg., 18) Ammonium chloride NH4Cl - 2Kg., 19) Magmesium Sulphate, MgSO4.7H2O,7H2O - 2 Kg., 20) Calcium chloride, CaCl2 - 2 Kg., and 21) Ferric chloride, FeCl3, 6H2O - 2 Kg
Supplying the following materials for safety measures for Laboratory Assistant and materials for Sewage Treatment Plant (STP) equipments such as 1) Hand Gloves - 12 Sets, 2) Lubrication Oil - 40 Litres, 3) Spider Washer - 40 Nos., 4) Bearings - 12 Nos., 5) Mechnical Seal - 12 Nos., 6) V belt for blower - 8 Nos. & 7) Motor fan - 4 Nos. during the contract period for day to day activities for maintaining the the Sewage Treatment Plant etc., complete and as directed by the departmental officers.
Shri Venkateswara Constructions
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .