Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.2 LAccepted-AOC | L1 | Accepted-AOC Approval | |
| 2 | L2₹50.9 L+₹69,972 (1.39%)Rejected-AOC | L2 | Rejected-AOC Rejected |
Tender Value
₹59.5 L
EMD Value
₹40,000
Closing Date
24 Jan 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Officer
Repair Restoration Arulmigu Abathsagayeswarar Temple at Kovilpathu Village, Budhalur Taluk, Thanjavur District.
Repair Restoration Arulmigu Abathsagayeswarar Temple at Kovilpathu Village, Budhalur Taluk, Thanjavur District.
2024_HRCE_511867_1
1/Abathsagayeswarar Repair and Restoration/2024
Open Tender
Civil Works - Others
Item Rate
365 days
Arulmigu Abathsagayeswarar
Please refer Tender Documents
6 documents required · 6 mandatory
₹0
₹40,000
12 Jun 2025
18 Dec 2024
24 Jan 2025
18 Dec 2024
24 Jan 2025
18 Dec 2024
Amount
Scaffolding charges for Vimanams and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with coconut keeth coverings, providing ladder arrangements, country wood plant for working, inspection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work 1 sq,ft.
Vimanam /Gopuram upto 25'0" Height
Labour charge for old stone Removing & Fixing Charges including cost and conveyance of materials to site and lobour charges for paving and Pointing With Lime Mortor1:1:5 (one part of lime and one and half part of sand)etc complete.as per instruction of departmental officers etc.,complete.
Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of wall dismantling the lime concrete as per instruction of departmental officers etc.,complete
Plastering with Lime mortar1:1.5,(one part of lime and one and half part of sand) 20mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications and as directed by the Dept,Officers.
Providing Water wash with appropriate methodology to restore the originalities of the existing Granite structures inclusive of necessary scaffolding charges, conveyance and all hire charegs for all tools and plants and clearing the site after completeion of work etc.,complete.
Pointing the cut stone Masonary work with Lime Mortor 1:1.5 (one part of lime and one and half part of sand) excluding cost and conveyance of cut stone but including cost of special tools such as brush and watering, curing etc complete, as per standard specification.
Earth work excavation for foundation with all leads and lifts in all soils and sub-soils and to the required depth as may be directed except hard rock requiring blasting inclusive of shoring, strutting and bailing out water wherever necessary refilling the sides of foundation with excavated earth in layers of 150mm thick well consolidated, depositing the surplus earth in places shown and levelling the site with all leads and lifts etc. complete in all respects..
Supplying and filling with Sand and Gravel mix in 1: 3 ratio, filled up in 150mm layers with moisture percentage of 18% including cost and conveyance of Quarry Dust, gravel and all labour charges for filling ramming etc. complete with standard specifications as directed by the Dept,Officers.
Cement concrete 1:5:10 (One cement, five crushed stone sand and ten aggregate) using 40mm gauge hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed, watered etc., complete complying with standard specification
Removing the old stone Chtravanam and stacking it for refixing including cost and conveyance labour,handling as per instruction of departmental officers etc.,complete.
Refixing the old stone Chtravanam including pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand), labour, conveyance and handling as per instruction of departmental officers etc.,complete.
Removing the cut stone Kandam Ubabeedam and stacking it for refixing including cost and conveyance labour,handling as per instruction of departmental officers etc.,complete.
Refixing the cut stone Kandam Ubabeedam including pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand), labour, conveyance and handling as per instruction of departmental officers etc.,complete.
Removing the cut stone Kabothagam Ubabeedam and stacking it for refixing including cost and conveyance labour,handling as per instruction of departmental officers etc.,complete.
Refixing the cut stone Kabothagam Ubabeedam including pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand), labour, conveyance and handling as per instruction of departmental officers etc.,complete.
Removing the cut stone padma jegathi athisdanam and stacking it for refixing including cost and conveyance labour,handling as per instruction of departmental officers etc.,complete.
Refixing the cut stone padma jegathi athisdanam including pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand), labour, conveyance and handling as per instruction of departmental officers etc.,complete.
Removing the cut stone Kalvari and stacking it for refixing including cost and conveyance labour,handling as per instruction of departmental officers etc.,complete.
Refixing the cut stone Kalvari including pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand), labour, conveyance and handling as per instruction of departmental officers etc.,complete.
Removing the cut stone Vyalavari and stacking it for refixing including cost and conveyance labour,handling as per instruction of departmental officers etc.,complete.
Refixing the cut stone Vyalavari including pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand), labour, conveyance and handling as per instruction of departmental officers etc.,complete.
Removing the cut stone Pavukkal and stacking it for refixing including cost and conveyance labour,handling as per instruction of departmental officers etc.,complete.
Refixing the cut stone Pavukkal including pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand), labour, conveyance and handling as per instruction of departmental officers etc.,complete.
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:1:5 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime Mortor1:1:5 and finishing with final ornamental plastering and nayam theervai including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaram.
Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications.
Varnishing new and old wood work two cots of approved quality in all floors the rate includes cost of all materials, brushes, scaffolding charges etc, complete.
Scraping the old paint and Painting two coat with approved water based Exterior Emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface curing in all floors including brushes etc., complete as per specification. -10 m 2
Painting with multicolour (Panchavarnam) good Emulsion paints complete for the Vimanams/Gopurams, inculding cost and conveyence of all materials, labour charges including Artist painter, working in heights,lifting of material, cost of brushes etc, complete.which including all extra for foldings-100 sft, superficial area.
Brick work in lime Mortor 1:2 using country brick of size 83/4"x41/4"x23/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification.
Clean removal of lime plaster and Replastering with Lime Mortor1:1.5,12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.
Drilling of Bore walls anywhere in Tamilnadu including transportation from one place to another with in Tamilnadu in Alluvial Soil Sedimentary strata of day and stone shale pebbles boulders etc.By first taking a pilot bore of 140mm/150mm dia and then enlarging to required dia direct or reverse rotary mud circulation method using rotary rigs,fuel,labour and drilling at site (Site will shown by the TWAD Board Officers) including construction of mud pit.
Drilling 150mm pilot bore
Reaming from 150mm dia to 300mm dia bore as directed by dept. officers.
Supply and delivery of vertical wet type submersible pumpset 2 HP capable of discharging with control panel with necessary pipes and fitting and labour charges etc.complete.
3 PAHSE 2 HP ISI make 4 stage submersible pumpset 100x40 with Excise duty and taxes etc.
160mm PVC end cup
GM white
500ML Solvent cement
Bolt and Nut
50mm PVC Coupling
50mm PVC Bend
50mm PVC Elbow
6 Sqmm 3 core flat Cable
PVC Tap Roll (Empier Tape)
Nool Kandy
Gusket shellac
50mm class PVC 10 KSC
150mm CS Casing Medium depth PVC pipe.
3 Phase panel board - D.O.L with two level guard and auto start ( 13390+1951 ) Rate + 4% vat
Slotter charge
Labour charges for inserting 150mm dia M.S Casing pipes assembly (With Slots or without slots)in the drilled hole including welding the joints an packing annular space with Pebbles of size and quality as approved by the Executive Engineer / TWAD Board.
Charges for developing the borewells with air compressor of 300 cfm capacity (minimum 8 hours) including transporation, labour and fuel charges for compressor as directed by TWAD Board Officers and conducting Yield test by "V" Notch method.
Supplying laying and jointing HDPE pipe of approved quality and best variety conforming to ISS and with ISI mark of 50mm including cutting threading and fixing PVC specials and including earth work exvcavation for 1M depth below ground level etc complete as per standard specifications.(For sub-marsible pump in borwell class-5 ,1mpa)
sub total
SHANMUGAM C (BID ID -1235739)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_608653.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .