Tender Value
₹75 L
Closing Date
14 Feb 2022, 6:00 pmClosed
EE PWD NH Dn.-I, Jaipur
Jacob Road, Civil Lines, Jaipur
Consultancy Services for Feasibility/Detail Engineering report of bypasses (Lalsot, Mandawari, Khedli, Piplai, Salimpur, Karauli) Between Lalsot Gangapur Karauli Section of NH-23 (OLD-11B) for Two lane Paved Shoulder Length of Bypasses 25.00 Km
2021_MoRTH_665654_1
NIT 07/2021-22 EE PWD NH Dn.-I, Jaipur
Open Tender
Miscellaneous Works
Item Rate
300 days
Under Jurisdiction of PWD NH Dn.-I
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
Yes
Through Bharatkosh Portal Online
Exempted
SE PWD NH Circle, Jaipur
8 Jun 2022
29 Dec 2021
16 Feb 2022
29 Dec 2021
14 Feb 2022
29 Dec 2021
12 Jan 2022
Amount
Local Consultants Remuneration for Local Professional Staff
Support Staff
Transportation
Duty Travel to Site
Office Rent
Office Supplies, Utilities and Communication
Office Furniture and Equipment (Rental)
Reports and Document Printing
Surveys & Investigations
Topographical Survey
Investigations
Net work survey and GPR
Cost of supply and fixining boundary pillars
Land acquisition Team including support staff and logistics/transportation
Sub Total for Local Consultant
Taxes & Duties
GST on Sub Total for Local Consultant (18% )
Sub Total Including GST
Description of Work / Item(s)
Amount
A. Topographical Survey (Fixed Rate)
Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer
Detailed topographic surveys using mobile/ aerial LiDAR or better technology
Description of Work / Item(s)
Amount
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/Studies
Land Acquisition Studies
Any other investigations/surveys
Sub Total
Sub-Soil Investigation (Boring) Rate (INR) Quantity Amount (INR) Amount (INR) in Words
a) Boring in all type of soils (other than hard rock)
b) Boring in hard rock
Sub Total
Note: * Quantities of borings shall be taken from Financial Proposal Form No. V. For financial evaluation, these quantities and rates quoted by the consultant will be considered. However, Payment shall be made on the actual quantity of boring at rates quoted above by the Consultant, which may be substantially more or less than the estimated quantities.
Description of Work / Item(s)
Amount
Net work Survey of the existing Highways as a repository for civil work as per directions from Authority.
GPR Survey for detection of under ground utilities
Description of Work / Item(s)
Amount
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
Description of Work / Item(s)
Amount
A Land Acquisition Team including support staff :
Ex-Land Revenue Inspector/Officer or equivalent
Ex-Kanoogo/ Girdwar or equivalent
Ex-Patwari or equivalent
Typist
Total
Number of land acquisition teams (ONE ONLY )
Grand total for all Land Acquisition teams (A)
B: Logistic for Land Acquisition Team :
Computer including necessary peripherals
Printers
Vehicles (Bolero or equivalent)
Total
Number of land acquisition teams (ONE ONLY )
Grand Total (B)
Grand total for all Land Acquisition teams And Logistics (A) + (B)
Description of Work / Item(s)
Amount
Key Personnel (Professional Staff)
Team Leader cum Senior Highway Engineer
Senior Bridge Engineer
Highway Cum Pavement Engineer
Material cum Geotechnical Engineer cum Geologist
Senior Survey Engineer
Traffic and Safety Expert
Environmental Specialist
Quantity Surveyor/ Documentation Expert
Land Acquisition Expert
Utility Expert
Sub Total
B: Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
Assistant Highways Engineers
Assistant Bridge Engineers
Assistant Pavment Highways Engineers
Assistant Material Engineers
Assistant Survey Engineers
Assistant Traffic & Safety Engineers
Assistant ENV Engineers
Assistant Quantity Surveyor
Assistant Utility Engineers
Auto Cad Engineer
Sub Total
Description of Work / Item(s)
Amount
Office Manager (1 No)
Typist
Office Boy (1No.)
Night Watchman
Description of Work / Item(s)
Amount
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants
Description of Work / Item(s)
Amount
Authority HQ
Authority RO
* Rate quoted includes Hotel charges (lodging & boarding), travel cost etc. complete for one person.
Description of Work / Item(s)
Amount
Office Rent (Fixed Costs)– The office shall be located at Begusarai district and the office rent includes electricity and water charges, maintenance, cleaning, repairs, security etc. complete.
Description of Work / Item(s)
Amount
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Description of Work / Item(s)
Amount
Office Furniture and Equipment (Rental) and equipment for Video Confrencing necessary at site
Description of Work / Item(s)
Amount
Monthly reports
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each)
LA & Clearances II Report
Marc Technocrats Private Limited
Spectrum Techno Consultants Pvt Ltd
Spectrum Techno Consultants Pvt Ltd
Marc Technocrats Private Limited
Marc Technocrats Private Limited
Spectrum Techno Consultants Pvt Ltd
Marc Technocrats Private Limited
Spectrum Techno Consultants Pvt Ltd
Marc Technocrats Private Limited
Spectrum Techno Consultants Pvt Ltd
Spectrum Techno Consultants Pvt Ltd
Marc Technocrats Private Limited
Marc Technocrats Private Limited
Spectrum Techno Consultants Pvt Ltd
Marc Technocrats Private Limited
Spectrum Techno Consultants Pvt Ltd
P.K.Engineers
Marc Technocrats Private Limited
P.K.Engineers
Spectrum Techno Consultants Pvt Ltd
P.K.Engineers
Marc Technocrats Private Limited
Spectrum Techno Consultants Pvt Ltd
Marc Technocrats Private Limited
P.K.Engineers
Marc Technocrats Private Limited
P.K.Engineers
Spectrum Techno Consultants Pvt Ltd
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .