Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.9 LAccepted-AOC | L1 | Accepted-AOC Being L1 Bidder | |
| 2 | L2₹38.6 L+₹62,730.27 (1.65%)Rejected-AOC | L2 | Rejected-AOC Not being L1 bidder | |
| 3 | L3₹41.9 L+₹3.9 L (10.4%)Rejected-AOC NO 3 26 DHUMANSOOR BIDAR DHUMANSUR KARNATAKA 585353 | BIDAR | KARNATAKA | 585353 | L3 | Rejected-AOC Not being L1 bidder |
| Sl No | Description | Qty | Unit | SREE KIRAN ENGINEERS L2 | RAM CHARAN CONSTRUCTIONS L1 | NAYANA CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of all kind of soil by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) n.exc. 1.50 m depth including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, complete all as specified and as directed. | 132.82 | Cum | 351 ₹46,619.82 | 400 ₹53,128 | 300 ₹39,846 Lowest |
| 2.00 | Earth work in excavation of ordinary rock by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) n.exc. 1.50 m depth including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, complete all as specified and as directed. | 31.44 | Cum | 351 ₹11,035.44 | 400 ₹12,576 | 300 ₹9,432 Lowest |
| 3.00 | Earth work in excavation of ordinary rock by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) depth exc 1.50m but not exc 3.00m including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, complete all as specified and as directed. | 93.22 | Cum | 351 ₹32,720.22 | 400 ₹37,288 | 300 ₹27,966 Lowest |
| 4.00 | Earth work in excavation of ordinary rock by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) depth exc 3.00m but not exc 4.50m including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, complete all as specified and as directed. | 79.12 | Cum | 351 ₹27,771.12 | 400 ₹31,648 | 300 ₹23,736 Lowest |
| 5.00 | Returning filling in including spreading, levelling watering and well ramming in layers n exc 25cm, complete all as specified and directed. | 105.39 | Cum | 99 ₹10,433.61 Lowest | 200 ₹21,078 | 150 ₹15,808.5 |
| 6.00 | Removing excavated soil n exc 50m and depositing where directed at a level n exc 1.5m above the starting point, complete all as specified and directed. | 179.83 | Cum | 99 ₹17,803.17 Lowest | 250 ₹44,957.5 | 150 ₹26,974.5 |
| 7.00 | M&L brick work with fly ash bricks, old size straight or curved on plan not exceeding 6.00 metre mean radius, built in cement mortar (1:4) including corbelling and arches where shown on drawings, complete all as specified. | 34.82 | Cum | 6,480 ₹2,25,633.6 Lowest | 7,200 ₹2,50,704 | 6,800 ₹2,36,776 |
| 8.00 | M & L TMT bars 10mm dia and over cut to length bent to shape required including cranking, bending, spirally for columns hooking ends binding with mild steel wire (annealed) not less than 0.9mm dia, complete all as specified and directed. | 7,346.59 | Kg | 126 ₹9,25,670.34 | 120 ₹8,81,590.8 Lowest | 145 ₹10,65,255.55 |
| 9.00 | M&L mild steel TMT bars 6mm to 8mm dia cut to length , bent to shape required, including cranking, bending spirally for stirrups and binding with and including mild steel wire (annealed) not less than 0.9mm dia. complete all as specified and as directed. | 1,348 | Kg | 126 ₹1,69,848 | 120 ₹1,61,760 Lowest | 145 ₹1,95,460 |
| 10.00 | M & L for formwork to soffits of suspended slabs such as roof slabs, floor slabs, landings and similar work; not exceeding 200mm thick (Horizontal or sloping), complete all as specified and directed. | 230.94 | Sqm | 351 ₹81,059.94 Lowest | 500 ₹1,15,470 | 750 ₹1,73,205 |
Tender Value
₹36.3 L
EMD Value
₹73,000
Closing Date
5 Oct 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE Golconda
GE GOLCONDA LANGER HOUSE ROAD OPP MILITARY HOSPITAL HYDERABAD TELANGANA-500 008
PROVN OF RAIN WATER HARVESTING PITS TO RECHARGE GROUND WATER AT ARTY CENTRE, MD LINES AND ASIF NAGAR AREA AND PROVN OF TOILET BLOCK AT SINGLE LIVING JCOS ACCN AT ARTY CENTRE UNDER GE GOLCONDA
2026_MES_780798_2
8975/E8
Open Tender
Civil Works
Item Rate
180 days
GE Golconda
As per Tender
9 documents required · 9 mandatory
₹500
GE Golconda
₹73,000
Yes
6 Nov 2026
7 Sept 2026
7 Oct 2026
7 Sept 2026
5 Oct 2026
15 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of all kind of soil by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) n.exc. 1.50 m depth including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, complete all as specified and as directed. | 132.82 | Cum | - | - |
| 2 | Earth work in excavation of ordinary rock by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) n.exc. 1.50 m depth including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, complete all as specified and as directed. | 31.44 | Cum | - | - |
| 3 | Earth work in excavation of ordinary rock by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) depth exc 1.50m but not exc 3.00m including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, complete all as specified and as directed. | 93.22 | Cum | - | - |
| 4 | Earth work in excavation of ordinary rock by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) depth exc 3.00m but not exc 4.50m including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, complete all as specified and as directed. | 79.12 | Cum | - | - |
| 5 | Returning filling in including spreading, levelling watering and well ramming in layers n exc 25cm, complete all as specified and directed. | 105.39 | Cum | - | - |
| 6 | Removing excavated soil n exc 50m and depositing where directed at a level n exc 1.5m above the starting point, complete all as specified and directed. | 179.83 | Cum | - | - |
| 7 | M&L brick work with fly ash bricks, old size straight or curved on plan not exceeding 6.00 metre mean radius, built in cement mortar (1:4) including corbelling and arches where shown on drawings, complete all as specified. | 34.82 | Cum | - | - |
| 8 | M & L TMT bars 10mm dia and over cut to length bent to shape required including cranking, bending, spirally for columns hooking ends binding with mild steel wire (annealed) not less than 0.9mm dia, complete all as specified and directed. | 7,346.59 | Kg | - | - |
| 9 | M&L mild steel TMT bars 6mm to 8mm dia cut to length , bent to shape required, including cranking, bending spirally for stirrups and binding with and including mild steel wire (annealed) not less than 0.9mm dia. complete all as specified and as directed. | 1,348 | Kg | - | - |
| 10 | M & L for formwork to soffits of suspended slabs such as roof slabs, floor slabs, landings and similar work; not exceeding 200mm thick (Horizontal or sloping), complete all as specified and directed. | 230.94 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BOQ_883422.xls
BOQ • 0.35 MB
8975Tender.pdf
Tender Documents • 0.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .