| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.3 LAccepted-AOC VILL BAHULA C I JAMBAD COLLIERY BAHULA SIDULI ROAD PANDAVESWAR WEST BENGAL INDIA 713322 | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713322 | ₹4.3 L | 1 | Accepted-AOC Eligible L-1 bidder. |
| 2 | 2₹5.0 LRejected-Finance VILL P O CHINCHURIA DIST BURDWAN WB PIN 713378 | CHINCHURIA | BURDWAN | WEST BENGAL | 713378 | ₹5.0 L | 2 | Rejected-Finance Quoted more than L-1 bidder. |
| 3 | 3₹5.0 LRejected-Finance KENDA KENDA KENDA BARDHAMAN 713342 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713342 | ₹5.0 L | 3 | Rejected-Finance Quoted more than L-1 bidder. |
| Sl No | Description | Qty | Unit | JAY MAA DAL DALI KALI L2 | BANERJEE CONCERN L3 | BAKSI ENTERPRISE L1 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 1.01Material Cost | ||||||
| 1.02 | Replacement of 11/12/13/16 m long Steel Tubular pole with cement concrete (distorted ones to be replaced by new one ) | 15 | no. | 3,400 ₹51,000 | 3,500 ₹52,500 | 2,600 ₹39,000 |
| 1.03 | Supply, fabrication, hoisting and erection of phase and earth bracket and painting with red oxide primer | 1,000 | kg | 70 ₹70,000 | 70 ₹70,000 | 67 ₹67,000 |
| 1.04 | Supply and erection of nuts, bolts ,flats and erection of clamps | 190 | kg | 100 ₹19,000 | 100 ₹19,000 | 93 ₹17,670 |
| 1.05 | upply and installation of 11KV disc insulator and hardware | 40 | no | 850 ₹34,000 | 850 ₹34,000 | 728 ₹29,120 |
| 1.06 | Supply and installation of 11KV Pin insulator and hardware | 40 | no | 400 ₹16,000 | 400 ₹16,000 | 332 ₹13,280 |
| 1.07 | Supply and fixing of 7/14 SWG GI wire for earth continuity and 6/8 SWG for making and erection of cradle guard. | 600 | kgs | 80 ₹48,000 | 80 ₹48,000 | 62 ₹37,200 |
| 1.08 | Supply, fixing and erection of HT Stay Set complete with stay plate ,stay insulator , stay wire of required dimension and specification. | 55 | no. | 800 ₹44,000 | 800 ₹44,000 | 728 ₹40,040 |
| 1.09 | Supply and stringing of ACSR Dog /Wolf conductor | 700 | mtr | 80 ₹56,000 | 80 ₹56,000 | 57 ₹39,900 |
Tender Value
₹4.2 L
EMD Value
₹5,300
Closing Date
21 Feb 2026, 5:00 pmClosed
AE EnM
S.B.AREA
Repair and Maintenance of Feeder 5 (3.3 KV) from 6 MVA Substation under Sonepur Bazari Project.
2026_ECL_352810_1
GM/SBA/EnM/Tender/25-26/95
Open Tender
Electrical and Maintenance Works
15 days
S.B.Project
Please refer tender document.
6 documents required · 6 mandatory
₹5,300
9 Apr 2026
11 Feb 2026
23 Feb 2026
11 Feb 2026
21 Feb 2026
11 Feb 2026
11 Feb 2026 - 14 Feb 2026
Item Description/ Heading
Material Cost
Replacement of 11/12/13/16 m long Steel Tubular pole with cement concrete (distorted ones to be replaced by new one )
Supply, fabrication, hoisting and erection of phase and earth bracket and painting with red oxide primer
Supply and erection of nuts, bolts ,flats and erection of clamps
upply and installation of 11KV disc insulator and hardware
Supply and installation of 11KV Pin insulator and hardware
Supply and fixing of 7/14 SWG GI wire for earth continuity and 6/8 SWG for making and erection of cradle guard.
Supply, fixing and erection of HT Stay Set complete with stay plate ,stay insulator , stay wire of required dimension and specification.
Supply and stringing of ACSR Dog /Wolf conductor
Erection of earth pit with supply of all required material
Labour Cost:
Replacement of 11/12/13/16 m long Steel Tubular pole with cement concrete (distorted ones to be replaced by new one )
Supply, fabrication, hoisting and erection of phase and earth bracket and painting with red oxide primer
Supply and erection of nuts, bolts ,flats and erection of clamps
Supply and installation of 11KV disc insulator and hardware
Supply and installation of 11KV Pin insulator and hardware
Supply and fixing of 7/14 SWG GI wire for earth continuity and 6/8 SWG for making and erection of cradle guard.
Supply, fixing and erection of HT Stay Set complete with stay plate ,stay insulator , stay wire of required dimension and specification.
Supply and stringing of ACSR Dog /Wolf conductor
Erection of earth pit with supply of all required material
Dismantling of 16 m long Steel Tubular pole with cement concrete
Dismantling of phase and earth bracket ,angles ,channel etc
Dismantling of 11KV disc/pin insulator and hardware
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
technical_365628.pdf
techsummary_365628.pdf
finance_365628.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Tendernotice_2.pdf
PDF • 1.48 MB
Tendernotice_3.pdf
PDF • 1.14 MB
BOQ_365628.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid