Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance | -46.03% | ₹1.6 L | L1 | Admitted-Finance |
| 2 | L2₹1.6 LAdmitted-Finance | -45.94% | ₹1.6 L | L2 | Admitted-Finance |
| 3 | L3₹1.8 LAdmitted-Finance | -40.00% | ₹1.8 L | L3 | Admitted-Finance |
| 4 | L4₹1.8 LAdmitted-Finance 11 ANUPAM VIHAR ENGINEERS ENCLAVE GMS ROAD DEHRADUN UTTARAKHAND 248001 | DEHRADUN | UTTARAKHAND | 248001 | -39.40% | ₹1.8 L | L4 | Admitted-Finance |
| 5 | L5₹1.8 LAdmitted-Finance | -38.00% | ₹1.8 L | L5 | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹5,839
Closing Date
26 Feb 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW JAMMU
EXECUTIVE ENGINEER REW JAMMU
Construction of drain from house of Madan Lal to the Shop of Sonu Talhar Pyt Talhar Block Suchetgarh AC Suchetgarh Under CDF for FY 2025-26
2026_RDPR_304184_5
e-NIT No. 858- REWJ of 2025-26 dated 21-02-2026
Open Tender
Civil Works
45 days
REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
GOVERNMENT TREASURY JAMMU
₹5,839
28 Feb 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
26 Feb 2026
21 Feb 2026
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:in AKOS
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:1:3:6 or richer mix (i/c equivalent design mix)
Providing and laying in position Cement Concrete of specified grade excluding the cost of centring and shuttering, all work Upto plinth level (1:5:10) 1 cement:5 coarse sand:10 graded stone aggreagate 40mm nominal size (crusher)
Providing and laying in position Cement Concrete of specified grade excluding the cost of centring and shuttering, all work Upto plinth level (1:3:6) 1 cement:3 coarse sand:6 graded stone aggreagate 20mm nominal size (crusher)
Supply and dumping of stones
Centring and shuttering including strutting, propping etc and removal of form for. for mass concrete foundations
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto Plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
Providing and laying 50 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand:4 graded stone aggregate 20mm nominal size
CIB (citizen information Board )
Carriage of Sand AND Stone Agg. av. 30 KM by M.T
Carriage of Stone Boulder av. 30 KM by M.T
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_988106.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid