Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹17,000
Closing Date
21 Oct 2026, 12:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE/GCC/MDU
SE/GCC/MDU
Civil work for Enhancement of existing 110/22 power transformer capacity at Periyakulam 110/22 KV SS
2026_EB_712414_1
SE/GCC/MDU 022/2026-27
Open Tender
Civil Works - Others
Works
180 days
Periyakulam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹17,000
9 Oct 2026
9 Oct 2026
22 Oct 2026
9 Oct 2026
21 Oct 2026
9 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Jungle clearnce Removal of weeds,vegetation in the yard area and seiving the existing blue metal | 400 | m2 | - | - |
| 2 | Earthwork excavation in hard stiff clay stiff black cotton hard red earth shales murram gravel stoney earth earth mixed with small size boulders and hard gravelly soil with initial lead of 10m and lift of 2m. | 155 | m³ | - | - |
| 3 | Supplying and filling of M.sand in SS area for fire prvention materials as per standard specification including cost of all materials lead lift etc complete. | 50 | m³ | - | - |
| 4 | PCC 1:3:6 mix using 20mm HBG machine crushed metal for LAS plinth concrete with fom work top neatly finishing including cost of all labour materials lead lift curing etc complete. | 14 | m³ | - | - |
| 5 | RCC 1:1.5:3 using 20 mm metal for RAFT foundation without form work including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete,but excluding cost of steel reinforcement. | 18 | m³ | - | - |
| 6 | PCC 1:2:4 using 20 mm metal for foundation without form work ncluding cost of all materials,curing, all labour charges, lead, lift, etc. complete. | 30 | m³ | - | - |
| 7 | PCC 1:2:4 using 20 mm metal for foundation with form work ncluding cost of all materials,curing, all labour charges, lead, lift, etc. complete. | 17 | m³ | - | - |
| 8 | Brick work in CM 1:5 using II Class chamber bricks including cost of all materials,curing, all labour charges, lead, lift, etc. complete. | 30 | m³ | - | - |
| 9 | Plastering CM 1:3 12mm thick including cost of all materials,curing, all labour charges, lead, lift, etc. complete. | 335 | m³ | - | - |
| 10 | MS / RTS Reinforcement for RCC works including cost of binding wire including cost of all materials, labour charges, lead, lift, etc complete | 1,700 | m³ | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_855782.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .