Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹8.3 LAccepted-AOC | ₹8.3 L | L-1 | Accepted-AOC AOC |
| 2 | L-2₹8.4 L+₹11,539.54 (1.39%)Rejected-Finance | ₹8.4 L+₹11,539.54 (1.39%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹8.7 L+₹37,114.54 (4.47%)Rejected-Finance | ₹8.7 L+₹37,114.54 (4.47%) | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹8.8 L+₹46,636.24 (5.62%)Rejected-Finance | ₹8.8 L+₹46,636.24 (5.62%) | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹8.9 L+₹59,661.54 (7.19%)Rejected-Finance | ₹8.9 L+₹59,661.54 (7.19%) | L-5 | Rejected-Finance L-5 |
| Sl No | Description | Qty | Unit | M/S RANA ENTERPRISES L3 | M/S VIJAY KUMAR CONTRACTOR L1 | M/s Narendra Kumar Contractor L6 | M/s Kailash Chand Sharma L5 | POONAM DEVI L2 | ROYAL INFRATECH L7 | Phoughat Construction L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in silt clearance including lift up to 1.50 M and lead upto 6 M. by JCB Including ramming cost of driver /Assistant driver ,POL, maintenance ofmachine,contractor profit, texes but excluding leveling,dressing and compaction | 12,860 | Cum | 42 ₹5,40,120 | 40.1 ₹5,15,686 Lowest | 44.2 ₹5,68,412 | 43 ₹5,52,980 | 46 ₹5,91,560 | 46 ₹5,91,560 | 45 ₹5,78,700 |
| 2.00 | Earth work in silt clearance including lift up to 1.50 M and lead upto 30 M. Including ramming and dressing by manual labour . the earth from clearance to be used in side embankment or to be disposed off spoil banks or as directed by Engineer-in-charge . | 887 | Cum | 62 ₹54,994 | 60.04 ₹53,255.48 | 63 ₹55,881 | 62 ₹54,994 | 40 ₹35,480 Lowest | 63 ₹55,881 | 50 ₹44,350 |
| 3.00 | Earth work in silt clearance with slush ,lahel and cartage up to 1.00 km including lift up to 1.50 M and lead upto 30 M. Including ramming and dressing . by JCB machine, the earth from clearance to be used in side embankment or to be disposed off spoil banks or as directed by Engineer-in-charge . | 1,329 | Cum | 180 ₹2,39,220 | 171.42 ₹2,27,817.18 | 189.2 ₹2,51,446.8 | 187 ₹2,48,523 | 135 ₹1,79,415 Lowest | 189.2 ₹2,51,446.8 | 167.3 ₹2,22,341.7 |
| 4.00 | Scrapping internal section of existing channel i.e. Bed and Slope | 7,680 | Sqm | 4.2 ₹32,256 | 4.26 ₹32,716.8 | 4.5 ₹34,560 | 4.25 ₹32,640 | 4.5 ₹34,560 | 4.2 ₹32,256 | 4 ₹30,720 Lowest |
Tender Value
₹9.3 L
EMD Value
₹18,660
Closing Date
9 Oct 2025, 6:00 pmClosed
EE BDGC BSR
EE BDGC BSR
SILT CLEARANCE OF WALIPURA DY. FROM KM 15.020 TO KM 37.260
2025_UPIDC_1076507_60
08/EE/2025-26
Open Tender
Civil Works
Item Rate
30 days
Bulandshahr
Please refer Tender documents.
2 documents required · 2 mandatory
₹266
₹18,660
Yes
12 Nov 2025
4 Oct 2025
9 Oct 2025
4 Oct 2025
9 Oct 2025
4 Oct 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .