Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Finance | -25.00% | ₹2.0 L | L1 | Admitted-Finance |
| 2 | L2₹2.0 L+₹26.50 (0.01%)Admitted-Finance | -24.99% | ₹2.0 L+₹26.50 (0.01%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 L+₹2,915.07 (1.47%)Admitted-Finance | -23.90% | ₹2.0 L+₹2,915.07 (1.47%) | L3 | Admitted-Finance |
Tender Value
₹2.6 L
EMD Value
₹5,300
Closing Date
8 Jul 2026, 4:00 pmClosed
Executive Engineer Irrigation division Udhampur
Executive Engineer Irrigation division Udhampur
Construction of Protection work in Tenani, Surni
2026_IFC_314150_4
Enit no. 06 of 2026-27 Dt- 01-07-2026
Open Tender
Civil Works
Percentage
180 days
Udhampur
As per Enit
2 documents required · 2 mandatory
₹500
Executive Engineer Irrigation division Udhampur
₹5,300
10 Jul 2026
1 Jul 2026
9 Jul 2026
1 Jul 2026
8 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations drains pipes, cables etc. not exceeding 1.5 mtrs in width and for shafts, wells, cesspits and the like not exceeding the 10 sq. mtr on plan including dressing of sides and ramming of bottoms lift upto 1.5, mtrs including getting out excavated earth and disposal of surplus excavated earth as directed. All kinds of soil 1mtr from cutting edge. | 26.63 | Cum | 479.3 | ₹12,763.76 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. all work upto plinth level with 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) | 31.95 | Cum | 5,733.6 | ₹1,83,188.52 |
| 3 | Centering and shuttering including strutting propping etc. and removal of form work for.
A) Foundation, footing, bases of columns. | 25.56 | Sqm | 286.35 | ₹7,319.11 |
| 4 | Centering and shuttering including strutting propping etc. and removal of form work for.
B) Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets etc. | 17.04 | Sqm | 628.95 | ₹10,717.31 |
| 5 | Carriage of Sand from source upto site of work.
A. Av. 80 Km by M.T & 400 mtr by H.L. | 15.02 | Cum | 1,578.84 | ₹23,714.18 |
| 6 | Carriage of Stones aggregate 20 mm from nearest source upto site of work.
A. Av. 25 Km by MT & 400 mtr Head Load | 28.1 | Cum | 971.64 | ₹27,303.08 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.81 MB
BOQ_1017170.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .