| 1 | LUBE LOADING AND UNLOADING. 50 LITRE(OR KILOGRAM) DRUMS AND LESSER SIZE | SCOPE AS PER TENDER DOCUMENT. UNIT OF MEASUREMENT EACH MEANS LOADING OR UNLOADING OF EACH CARTON OR BUCKET OR DRUM AS MENTIONED IN THE HPCL INVOICE. ALL PACKING SIZES UPTO AND INCLUDING 50 LITRES OR KILOGRAMS SHALL BE CLAIMED IN THIS ITEM | 2,88,000 | EACH | arunkthomas | 760 |
| 2 | LOADING AND UNLOADING OF LUBE AND BITUMEN BARRELS OF SIZE ABOVE 50 LITRES OR KILOGRAM | SCOPE AS PER TENDER DOCUMENT. UNIT OF MEASUREMENT EACH MEANS LOADING OR UNLOADING OF EACH CARTON OR BUCKET OR DRUM AS MENTIONED IN THE HPCL INVOICE. ALL PACKING SIZES ABOVE 50 LITRES OR KILOGRAMS SHALL BE CLAIMED IN THIS ITEM | 90,000 | EACH | arunkthomas | 760 |
| 3 | RESTACKING OF LUBE CARTONS OR BUCKETS 50 LITRE(OR KILOGRAM) DRUMS AND LESSER SIZE | SCOPE AS PER TENDER DOCUMENT. UNIT OF MEASUREMENT EACH MEANS RESTACKING OF EACH CARTON OR BUCKET OR DRUM AS MENTIONED IN THE HPCL INVOICE. ALL PACKING SIZES UPTO AND INCLUDING 50 LITRES OR KILOGRAMS SHALL BE CLAIMED IN THIS ITEM | 42,000 | EACH | arunkthomas | 760 |
| 4 | RESTACKING OF LUBE AND BITUMEN BARRELS OF SIZE ABOVE 50 LITRES OR KILOGRAM | SCOPE AS PER TENDER DOCUMENT. UNIT OF MEASUREMENT EACH MEANS RESTACKING OF EACH CARTON OR BUCKET OR DRUM AS MENTIONED IN THE HPCL INVOICE. ALL PACKING SIZES ABOVE 50 LITRES OR KILOGRAMS SHALL BE CLAIMED IN THIS ITEM | 10,000 | EACH | arunkthomas | 760 |
| 5 | EMPTYING AND BULKING DAMAGED BARREL OR SMALL PACKS | SCOPE AS PER TENDER DOCUMENT. UNIT OF MEASUREMENT EACH MEANS EMPTYING AND BULKING OF A BARREL/BUCKET/DRUM OR CARTON | 600 | EACH | arunkthomas | 760 |
| 6 | TANK WAGON UNLOADING ASSISTANCE - BTPN WAGONS | SCOPE AS PER TENDER DOCUMENT. PAYMENT WILL BE MADE FOR SAFE UNLOADING OF EACH BTPN WAGON. ONE RAKE WILL HAVE 50 WAGONS | 2,400 | EACH | arunkthomas | 760 |
| 7 | TT/BAY CALIBRATION ASSISTANCE | SCOPE AS PER TENDER DOCUMENT. UNIT OF MEASUREMENT EACH MEANS CALIBRATION OF EACH TRUCK OR LOADING POINT OR PROVER | 720 | EACH | arunkthomas | 760 |
| 8 | | SCOPE AS PER TENDER DOCUMENT | 100 | HOUR | arunkthomas | 760 |
| 9 | HIRING OF TRACTOR TRAILER | TRACTOR: SUPPLY OF TRACTOR WITH LICENSED DRIVER PER HOUR.
NOTES TO SCOPE: 1. THE MINIMUM PERIOD FOR WHICH THE TRACTOR TRAILER SHALL BE HIRED EACH TIME IS TWO HOURS. FOR EVERY ADDITIONAL HOUR,
CHARGES PER HOUR SHALL BE PAID.
2. PAYMENT SHALL BE MADE FOR THE ACTUAL TIME TAKEN FOR TRACTOR TRAILER WORKING HOURS AT SITE.
3. FOR OBTAINING THE GATE PASSES FOR TRACTOR TRAILER ENTRY, CONTRACTOR SHALL COORDINATE WITH OFFICER WELL IN ADVANCE. | 50 | HOUR | arunkthomas | 760 |
| 10 | HIRING OF JCB/BACKHOE LOADER | PROVIDING & OPERATION OF JCB FOR MISCELLANEOUS JOBS ON RENT BASIS, AS & WHEN ADVISED BY HPCL. PAYMENT TO BE MADE ON PER HOUR
BASIS.
PROVIDING REQUIRED JCB(BACKHOE LOADER) SERVICES FOR JOBS SCOPE OF JOB: THE JOB SCOPE INCLUDES PROVIDING JCB(BACKHOE LOADER)
WITH OPERATOR, DRIVER, AND HELPERS FOR OPERATING THE JCB(BACKHOE LOADER) . IT ALSO INCLUDES SUPPLY OF FUEL, LUBRICANTS,
TOOLS AND TACKLES AND EVERYTHING
REQUIRED TO FACILITATE SMOOTH OPERATION OF THE JCB(BACKHOE LOADER) .
NOTES TO SCOPE:
1. THE MINIMUM PERIOD FOR WHICH THE JCB(BACKHOE LOADER) SHALL BE HIRED EACH TIME IS TWO HOURS. FOR EVERY ADDITIONAL HOUR,
CHARGES PER HOUR SHALL BE PAID.
2. PAYMENT SHALL BE MADE FOR THE ACTUAL TIME TAKEN FOR JCB(BACKHOE LOADER) WORKING HOURS AT SITE.
3. FOR OBTAINING THE GATE PASSES FOR JCB(BACKHOE LOADER) ENTRY, CONTRACTOR SHALL COORDINATE WITH OFFICER WELL IN ADVANCE. | 100 | HOUR | arunkthomas | 760 |