Loading…
Loading…
Tender Value
₹80.7 L
EMD Value
₹80,700
Closing Date
1 Apr 2025, 10:30 pmClosed
Minor Irrigation Department
1Construction of Check Dam and Guidewall across halla near Chinnenahalli village in Chinnenahalli Grama panchayath, Madhugiri taluk 2) Construction of Check dam cum Pipe Culvert across halla near Thippagondanahalli village in Chinnenahalli Grama panchayath in Madhugiri taluk Tumkur district. (Reserved for Category 1 Contractors)
MI/2024-25/OW/WORK_INDENT2438
MI/2024-25/OW/WORK_INDENT2438
Reserved
Other Works
Two Tender Document System(Two Cover)
Minor Irrigation Division Tumkur
₹2,020
₹80,700
24 Mar 2025
24 Mar 2025
2 Apr 2025
28 Mar 2025
1Construction of Check Dam and Guidewall across halla near Chinnenahalli Village in Chinnenahalli Gramapanchayath Madhugiri Taluk 2 Construction of Check Dam Cum Pipe Culvert Across Halla near Thippagondanahalli Village in Chinnenahalli Gramapanchayath in Madhugiri Taluk Tumkur District.
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
De-silting of Tank bed/Feeder Channel/Canal in dry condition by excavating the deposited bed material and loading the same to transport vehicle ( excluding cost of transportation ) including cost of a...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, ...
Providing and laying insitu vibrated M-20 ( 28 days cube compressive
strength not less than 20 N / sq mm ) grade cement concrete using 20
mm down size approved, clean, hard, graded aggregates as per r...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complet...
Providing casing embankment using semi-pervious / pervious soil from dump areas in layers of 250 to 300 mm (before compaction) including cost of all materials, machinery, labour, all other operations ...
Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging ston...
Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size mad...
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation,...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .