Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹11,800
Closing Date
12 Oct 2026, 2:00 pm
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit II AOH 2026 27 FG Duct A and B sides Renewal of Deflector plates renewal of duct supports renewal of guard plates over the expansion joints renewal of splitter plate etc
2026_EB_708727_1
CE / MTPS-I / SE / M-I / BM /OT. 83 / 2026-27
Open Tender
Power/Energy Projects/Products
Works
25 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹11,800
Yes
28 Sept 2026
28 Sept 2026
13 Oct 2026
28 Sept 2026
12 Oct 2026
28 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for cutting and removal of heavily eroded flue gas duct deflector plates, transporting & devoluting scraps to Central Stores/M.T.P.S.-I. | 100 | M² | - | - |
| 2 | Charges for drawal of 6mm M.S plate from central stores transporting the materials to outside workshop cutting to required size, bending to the required size and profile, transporting back to MTPS-I boiler area. | 5 | Ton | - | - |
| 3 | Charges for leading the new deflector to Boiler area, leading, lifting to Boiler Flue gas ducts. Fixing and welding guide angle in the duct and to the correct contour. Placing the deflector plate in the guide angle and welding the same. | 100 | M² | - | - |
| 4 | Charges for removing the existing eroded duct supports, supports for ESP entrance area and transporting of new pipes/Angles from Central Stores / MTPS-I, cutting into required size leading lifting, positioning and welding. | 240 | Mtr | - | - |
| 5 | Charges for patch welding of eroded portion of expansion joint styles of various sizes in the flue gas /air duct. | 10 | M² | - | - |
| 6 | Charges for cutting and removal of eroded guard plates over the expansion joint and providing new guard plate of size 3.15 mm HR sheet over the expansion joint after completion of inspection and patch welding works on Expansion joints. | 160 | M² | - | - |
| 7 | Charges for cutting and removal of heavily eroded flue gas duct splitter plates at the entrance of ESP, transporting & devoluting scrap to Central Stores/M.T.P.S.-I | 40 | M² | - | - |
| 8 | Charges for transporting new MS plates from Central Stores to Boiler area, leading, lifting to Boiler Flue gas ducts for fixing & welding splitter plate at the entrance of ESP. | 40 | M² | - | - |
| 9 | Charges for strengthening wear resistant supports with new gazette plate. | 40 | Nos. | - | - |
| 10 | Cutting gas | 9 | Set. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_851695.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .