Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12,215Accepted-Finance | L1 | Accepted-Finance AS PER BOQ | |
| 2 | L2₹17,645+₹5,430 (44.5%)Accepted-Finance | L2 | Accepted-Finance AS PER BOQ | |
| 3 | L3₹32,920+₹20,705 (169.5%)Accepted-Finance | L3 | Accepted-Finance AS PER BOQ | |
| 4 | L4₹36,152+₹23,937 (196.0%)Accepted-Finance | L4 | Accepted-Finance AS PER BOQ |
| Sl No | Description | Qty | Unit | M/s Raj Kishor Contractor L2 | SURENDRA KUMAR CONTRACTOR L1 | SHREE RAM ENTERPRISES L4 | GYAS PAL CONTRACTOR L3 |
|---|---|---|---|---|---|---|---|
| 1.00Detail of Work | |||||||
| 1.01 | Safely carriage of ST/PCC Poles up to 13 Mtr. long from ESC, SRE/JE store to site of work at various sites including loading & unloading at both ends. | 1 | No | 1,400 ₹1,400 Lowest | 1,600 ₹1,600 | 3,150 ₹3,150 | 3,000 ₹3,000 |
| 1.02 | Safely carriage of line material (Except ST/PCC Poles) from ESC, SRE/JE store to site of work at various sites including loading & unloading at both ends. | 1 | Kg. | 10 ₹10 | 5 ₹5 Lowest | 22 ₹22 | 20 ₹20 |
| 1.03 | Erection of single support on ST/PCC Poles up to 13 Mtr. long with complete fitting of all accessories of 33 KV/11 KV/LT lines. | 1 | No | 1,500 ₹1,500 Lowest | 1,800 ₹1,800 | 3,150 ₹3,150 | 3,000 ₹3,000 |
| 1.04 | Erection of D/P on ST/PCC Poles up to 13 Mtr. long with complete fitting of all accessories of 33 KV/11 KV/LT lines. | 1 | No | 6,800 ₹6,800 | 3,500 ₹3,500 Lowest | 10,000 ₹10,000 | 9,000 ₹9,000 |
| 1.05 | Re-Straightening of tilted ST/PCC Poles up to 13 Mtr. long of 33 KV/11 KV/LT lines. with opening, binding and jumpering of conductor. & Re-binding, Re-jumpering the same properly. | 1 | No | 450 ₹450 Lowest | 500 ₹500 | 900 ₹900 | 850 ₹850 |
| 1.06 | Re-Straightening of tilted D/P (PCC/ST Pole) With removing of T/F along with complete fitting and refitting of complete fitting after re- strengthening of tilted double pole the same properly. | 1 | No | 3,500 ₹3,500 | 1,000 ₹1,000 Lowest | 8,500 ₹8,500 | 8,000 ₹8,000 |
| 1.07 | Re-sagging of loose conductor of 11 KV lines (consisting of 3 Phase)with opening, binding & jumpering of conductor & Re-binding, Re-jumpering the same properly. | 1 | Span | 400 ₹400 | 350 ₹350 Lowest | 900 ₹900 | 850 ₹850 |
| 1.08 | Re-sagging of loose conductor of 33 KV lines (consisting of 3 Phase)with opening, binding & jumpering of conductor & Re-binding, Re-jumpering the same properly. | 1 | Span | 500 ₹500 Lowest | 500 ₹500 Lowest | 1,500 ₹1,500 | 1,450 ₹1,450 |
| 1.09 | Re-sagging of loose ABC cable with opening consumer cable connections and Re- connections the same complete in all respect. | 1 | Span | 400 ₹400 | 300 ₹300 Lowest | 500 ₹500 | 450 ₹450 |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
16 Sept 2025, 1:00 pmClosed
Superintending Engineer
Electricity Distribution Circle II Saharanpur
Various work of pole welding running in area EDSD ITI
2025_PVVNL_1047171_2
10/W/EDC II/SRE/2025-26
Open Tender
Electrical Works
Lump-sum
180 days
SAHARANPUR
Please refer tender document
2 documents required · 2 mandatory
₹1,180
Yes
SE EDC II SRE
₹2,000
Yes
18 Oct 2025
8 Sept 2025
16 Sept 2025
8 Sept 2025
16 Sept 2025
8 Sept 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .