Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 7TH FLOOR EASTERN WING CENTENNIAL SQUARE 6A DR AMBEDKAR ROAD KODAMBAKKAM CHENNAI 600024 | CHENNAI | CHENNAI | TAMIL NADU | 600024 | Admitted-Finance |
| 2 | Admitted-Finance 9TH FLOOR PRIMA BAY TOWER B GATE NO 5 SAKI VIHAR ROAD POWAI MUMBAI 400072 | MUMBAI | MUMBAI | MAHARASHTRA | 400072 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
2 Nov 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
VINOD KUMAR
VINOD KUMAR CHIEF MANAGER SUBCONTRACT TECHNIP INDIA LTD NOIDA UP INDIA PIN CODE 201301
BORED CAST IN SITU PILING AND GROUND IMPROVEMENT WORKS FOR RPTU UNIT OF NREP PROJECT NUMALIGARH REFINERY
2021_NRL_650003_1
TPIL/CONS/NRL/200663C/002
Open Tender
Civil Works
Works
304 days
NUMALIGARH REFINERY LTD NUMALIGARH
AS PER NOTICE INVITING TENDER
6 documents required · 6 mandatory
₹0
Exempted
8 Dec 2021
25 Sept 2021
3 Nov 2021
25 Sept 2021
2 Nov 2021
13 Oct 2021
25 Sept 2021 - 1 Oct 2021
120 days
Amount
General Description : All Supply, Fabrication, Erection, Construction works shall be performed as per AFC Drawings, Project Specifications, Project Standards, General Notes, Indian Codes, etc., (NOTE: For Item Sr. No. Bidder to refer the price schedule attached with tender Part-IIa at priced section)
SITE GRADING : Grubbing, scrubbing & clearing the areas, removal of roots / boulders, breaking clods, making up the hollow produced by removal of roots / boulders with available earth, clearing the site of all objectionable / unserviceable materials by means of manual or mechanical excavation as per directions of Engineer-in-Charge. Including loading, transport, unloading and disposal of the unserviceable material at designated areas within the plant boundary and leveling the same.
BORED CAST-IN SITU CONCRETE PILES: Execution of pile bore by rotary and/or percussion means in any soil , by approved technique through all types of sub soil strata, including the use of bentonite mud, supply of Ready Mix Concrete(RMC) only, casting and vibration of concrete of grade M30 as per the design mix using either Ordinary Portland Cement of Grade 43/Grade 53 or Portland Puzzolana cement(fly ash based/calcined based) conforming to IS 1489 Part1&2 (with minimum cement content 400 kg/m3) , including concrete quality control tests as per Approved QCP, supplying admixtures and other materials including plasticizers if required as per specification TP-1ZZZA-CV-SPE-0037 for BCIS piling/NR-0ZZZZ-CV-SPE-0002 Specification for Concrete Works/recommendations, excluding the cost of steel reinforcement but including the cost of boring with casing and/or bentonite solution (include any additive or admixture if necessry to avoid soil cave-ins) for maintaining borehole side, tremie concreting, supply of necessary materials , machineries and labours and carrying out all ancillary works, disposal of surplus materials including excavated earth/muck/other materials, bentonite for all leads and lifts within refinery premises, shifting of plant and equipment from one pile location to other, all complete as per drawing and direction of Engineer-in-charge. issue of driving records shall be in the scope of sub-contractor without any additional charge. Mobilising and Demobilising of Equipment / Tools and Tackles as required for executing the Piling work and / or shifting the Equipment from one location to another as required and as directed by Engineer-In-charge. The quoted rate shall also include mateial Inspection and testing. Rate including the material filled above cut-off level Rate includes all ancillary equipments, materials, tools, tackles , laboiur etc. all complete necessary to install Bored cast-in-situ R.C.C. piles at site, as per Technical specification and demobilization of the same after completion of job.Quoted Rate shall also include Contractor's preparedeness plan and mitigation measures for working during the monsoon period. The bore hole above the pile cutoff level shall be finished with same concrete of height variable according to construction sequence (minimum 600mm) and balance height by sand or crushed stone as per drawing, specification and directions of Engineer-in-charge for the following diameter & length of piles. Rate includes supplying and mixing of approved brand of BI-POLAR CONCRETE PENETRATING CORROSION INHIBITING ADMIXTURE ( as per specification TP-1ZZZA-CV-SPE-0016) in concrete as per manufacturer's specification for protection of reinforcement against corrosion. Supply of admixture and Testing as per ASTM/ IS codes in Contractor's scope. Application of Polymer in place of Bentonite shall be as per the direction of EIC without any extra cost. Pile Measurement: Length of each pile x No of Piles. Length of each pile shall be measured from Pile Cutt Off Level as per actual driving records or as per IFC Drawings (boring / concreting/ filling above the cutt off level till working Level shall not be considered). Cut Off Level shall be as per the IFC Drawings.
All above activities for Diameter of pile-500 MM, length of pile 20M from C.O.L
All above activities for Diameter of pile-600 MM, length of pile 20M from C.O.L
All above activities for Diameter of pile-750 MM, length of pile 20M from C.O.L
All above activities for Diameter of pile-500 MM, length of pile above 20M from C.O.L up to 30 M from COL
All above activities for Diameter of pile-600 MM, length of pile above 20M from C.O.L up to 30 M from COL
All above activities for Diameter of pile-750 MM, length of pile above 20M from C.O.L up to 30 M from COL
Extra for supply , using and proper disposal of polymer instead of bentonite for Diameter of pile-500 MM, length of pile ~20-25M (Approx.), Grade of Concrete-M30, with minimum cement content of 400 kg/m3) .“Application of Polymer in place of Bentonite shall be as per the direction of EIC. ”
Extra for supply , using and proper disposal of polymer instead of bentonite for Diameter of pile-600 MM, length of pile ~20 25M (Approx.), Grade of Concrete-M30, with minimum cement content of 400 kg/m3). “Application of Polymer in place of Bentonite shall be as per the direction of EIC. ”
Extra for supply , using and proper disposal of polymer instead of bentonite for Diameter of pile-750 MM, length of pile ~20-25M (Approx.), Grade of Concrete-M30, with minimum cement content of 400 kg/m3). “Application of Polymer in place of Bentonite shall be as per the direction of EIC. ”
EMPTY BORING: Empty boring for vertical piles measured from working level to plus 600mm above the Cut off level for following dia piles.
All activities and scope same as item no 4 but for 500mm dia pile
All activities and scope same as item no 4 but for 600mm dia pile
All activities and scope same as item no 4 but for 750mm dia pile
REINFORCEMENT CAGE FOR CAST-IN-PLACE CONCRETE PILES: Supplying and placing in position high strength deformed bar reinforcement cage of specified grade conforming to IS: 1786 for RCC Cast-in-Situ piles for full length of pile, including straightening, cleaning, uncoiling, cutting, bending to required shape & lengths as per details, binding with sub-contractor's own 18 SWG black soft annealed binding wire, supplying and placing with proper cover blocks, supports, chairs, spacers, welding, if required, to form a rigid cage; returning of unused / scrap/ unserviceable steel to storage point for all heights and depths etc., all complete including supplying as per instructions of the Engineer-in-Charge. All the rebars above C.O.L to be protected, by the piling contractor, by polyethylene sleeves against the water/soil. Included : Inspection and test of materials Measurement: Weight calculated as the unit weight multiplied by the finished net bar length as per IFC drawings. Scrap and construction materials such as joints, spacers, overlapping and supporting rods not indicated shall not be considered in the measurement. Steel Grade Fe 500D conforming to IS 1786 specified minimum percentage elongation (>14.5%) as per IS13920
INITIAL LOAD TEST): LOADING TEST (COMPRESSION): Conducting Vertical Load Test on pile by direct loading on piles as per project specification/ latest IS code including the necessary preparatory work, finishing pile head by breaking off the concrete above the cutoff level, disposal of concrete debris, supply & erection of kentledge of suitable magnitude, labour, excavation upto required level/depth, back filling, compaction etc., removal of load along with all preparatory work and measuring equipment after execution of test, all tools and tackles required, analyzing the results, making the report and submitting the records and reports, all complete as per specifications and directions of Engineer-in-Charge. Including all tests with regards to Definition of methodology and materials to conduct the test, NOTE : Cost of Pile excluded. Measurement : Number of test Loading test on Initial test pile .
All activities and scope same as 6.0 but for 500 mm dia. Bored cast in situ pile
All activities and scope same as 6.0 but for 600 mm dia. Bored cast in situ pile
All activities and scope same as 6.0 but for 750 mm dia. Bored cast in situ pile
INITIAL LOAD TEST): LOADING TEST (HORIZONTAL OR LATERAL LOADING TEST): Conducting Lateral Load Test on pile by direct loading on piles as per project specification/ latest IS code including the necessary preparatory works, pile head preparation by breaking off the concrete above the cutoff level, disposal of concrete debris, supply & erection of kentledge of suitable magnitude, labor, excavation upto required level/depth, back filling, compaction etc., removal of load along with all preparatory works and measuring equipment after execution of test, all tools and tackles required, analyzing the results, making the report and submitting the records and reports, all complete as per specifications and directions of Engineer-in-Charge. Including all tests with regards to Definition of methodology and materials to conduct the test, NOTE: Cost of Pile excluded. Measurement : Number of test Loading test on Initial test pile
All activities and scope same as 7.0 but for 500 mm dia. Bored cast in situ pile
All activities and scope same as 7.0 but for 600 mm dia. Bored cast in situ pile
All activities and scope same as 7.0 but for 750 mm dia. Bored cast in situ pile
INITIAL LOAD TEST): LOADING TEST (TENSILE TEST OR UPLIFT): Conducting Pull Out Test on pile by direct loading on piles as per project specification/ latest IS code including the necessary preparatory work, finishing pile head by breaking off the concrete above the cutoff level, disposal of concrete debris, supply & erection of kentledge of suitable magnitude, labour, excavation upto required level/depth, back filling, compaction etc., removal of load along with all preparatory works and measuring equipment after execution of test, all tools and tackles required, analyzing the results, making the report and submitting the records and reports, all complete as per specifications and directions of Engineer-in-Charge. Including all tests with regards to Definition of methodology and materials to conduct the test, NOTE: Cost of Pile excluded. Measurement : Number of test Loading test on Initial test pile
All activities and scope same as 8.0 but for 500 mm dia. Bored cast in situ pile
All activities and scope same as 8.0 but for 600 mm dia. Bored cast in situ pile
All activities and scope same as 8.0 but for 750 mm dia. Bored cast in situ pile
ROUTINE LOAD TEST : LOADING TEST (COMPRESSION): Conducting Vertical Load Test on pile by direct loading on piles as per project specification/ latest IS code including the necessary preparatory work, finishing pile head by breaking off the concrete above the cutoff level, disposal of concrete debris, supply & erection of kentledge of suitable magnitude, labour, excavation up to required level/depth, back filling, compaction etc., removal of load along with all preparatory work and measuring equipment after execution of test, all tools and tackles required, analyzing the results, making the report and submitting the records and reports, all complete as per specifications and directions of Engineer-in-Charge. Including all tests with regards to Definition of methodology and materials to conduct the test, NOTE : i) Cost of Pile excluded. ii) Cost of excavation and Pile Head Breaking up to cut off level payable under respective Pile Integrity Test Item. Measurement : Number of test Loading test on working pile .
All activities and scope same as 9.0 but for 500 mm dia. Bored cast in situ pile
All activities and scope same as 9.0 but for 600 mm dia. Bored cast in situ pile
All activities and scope same as 9.0 but for 750 mm dia. Bored cast in situ pile
LOADING TEST (TENSILE TEST OR UPLIFT): Conducting Pull Out Test on pile by direct loading on piles as per project specification/ latest IS code including the necessary preparatory work, finishing pile head by breaking off the concrete above the cutoff level, disposal of concrete debris, supply & erection of kentledge of suitable magnitude, labour, excavation upto required level/depth, back filling, compaction etc., removal of load along with all preparatory works and measuring equipment after execution of test, all tools and tackles required, analyzing the results, making the report and submitting the records and reports, all complete as per specifications and directions of Engineer-in-Charge. Including all tests with regards to Definition of methodology and materials to conduct the test, NOTE : i) Cost of Pile excluded. ii) Cost of excavation and Pile Head Breaking up to cut off level payable under respective Pile Integrity Test Item. Measurement : Number of test Loading test on working pile
All activities and scope same as 10.0 but for 500 mm dia. Bored cast in situ pile
All activities and scope same as 10.0 but for 600 mm dia. Bored cast in situ pile
All activities and scope same as 10.0 but for 750 mm dia. Bored cast in situ pile
LOADING TEST (HORIZONTAL OR LATERAL LOADING TEST): Conducting Lateral Load Test on pile by direct loading on piles as per project specification/ latest IS code including the necessary preparatory works, pile head preparation by breaking off the concrete above the cutoff level, disposal of concrete debris, supply & erection of kentledge of suitable magnitude, labor, excavation upto required level/depth, back filling, compaction etc., removal of load along with all preparatory works and measuring equipment after execution of test, all tools and tackles required, analyzing the results, making the report and submitting the records and reports, all complete as per specifications and directions of Engineer-in-Charge. Including all tests with regards to Definition of methodology and materials to conduct the test, NOTE : i) Cost of Pile excluded. ii) Cost of excavation and Pile Head Breaking up to cut off level payable under respective Pile Integrity Test Item. Measurement : Number of test Loading test on working pile
All activities and scope same as 11.0 but for 500 mm dia. Bored cast in situ pile
All activities and scope same as 11.0 but for 600 mm dia. Bored cast in situ pile
All activities and scope same as 11.0 but for 750 mm dia. Bored cast in situ pile
INTEGRITY TEST ON WORKING PILE: Conducting Integrity test on piles (NDT Test) on all working piles of any diameter including necessary excavation and pile chipping, pile head preparation, mobilizing all necessary equipment, technicians, head preparation, setup, interpretation, computation, analysis of results and submission of reports all complete as per project specifications/ IS code and as directed by Engineer-in-charge for all dia. of piles(500mm, 600mm &750mm). Note: Cost of Pile excluded. Measurement : Number of test
EXCAVATION: Earth work in excavation for all kind of Soil including all labour, materials, dressing of sides, pumping & bailing out water accumulated due to rain and / or subsoil waters and including disposal or stacking, leveling and neatly dressing as decided by Engineer-in-Charge including providing temporary supports to existing service lines like water pipes, sewerage, electric cables, etc., if any, complete, including shoring/ strutting /sheet pile, all materials and labour complete and as directed by Engineer-in-Charge for following depth. Dewatering system supply, installtion of number of wells, pumps and all associated works complete, maintenance, etc., from Start of excation works till piling works execution and pile testing are completed and as per directions of Engineer-in-Charge. Rate for de-commissioning of dewatering system shall also be considered. Excavated soil shall be disposed at least up to the distance of 500 meter from the plant Boundary for backfilling and the charges for the same is included in this item. - From grade level upto 3.0m depth
TRANSPORTATION / DISPOSAL OF SURPLUS EARTH /DEBRIS / MUCK ETC.: Transportation of surplus earth/debris, muck, marsh,bentonite/polymer slurry,vegetation remains to dumping area outside site Carting the surplus excavated earth/rocks and debris from construction area beyond the initial lead of 500 meters to the approved dumping area outside the plant boundary at below mentionedd distance from the site, including re-excavating the deposited soil excavated earlier, transportation, loading, unloading, laying at all depths/heights, stacking, levelling and dressing both the area (viz. from where the earth is carted and where it is deposited) to required levels and slopes complete with all lifts. Any payment of fee, duties and royalties etc for using the dump. Note : Outing gate of Refinery shall be decided by NRL / EIC as per the site condition.
Transportation to any designated area outside refinery premises with a lead up to 5 km
Transportation to any designated area outside refinery premises with a lead more than 5 km and up to 10 Km
Transportation to any designated area outside refinery premises with a lead more than 10 Km and up to 15 km
FOREST ROYALTY REIMBURSEMENT: To obtain transit permit for excavation and transportation of the surplus excavated earth outside refinery premises (as directed by EIC) Contractor shall deposit Forest Royalty to Forest Department. The Forest Royalty shall be reimbursed to the contractor on actual based on production of proof of payment i.e Forest Royalty Challans time to time.
STONE COLUMNS/GROUND IMPROVEMENT Designing & supplying all material, tools, tackles and constructing stone columns as specified, and to control settlements, as per design, guidelines, material specifications, construction methods given in Job supply specification. Mobilisation of adequate number of rigs, tools, tackles, plant, equipment etc. and all accessories required for the construction of the stone columns/ ground improvement as per specifications and demobilising the same after the works are complete.
STONE COLUMNS BELOW SHALLOW FOUNDATION FOR ENHANCEMENT OF NET SBC & LIQUEFACTION MITIGATION Provide and construct stone columns of minimum length of 10.0 M below bottom of sand layer provided beneath foundation (2.6m below FGL) including all material, labour etc. all complete as per specifications to improve the existing net safe bearing capacity of soil to 12 T/M² limiting the settlement to 25mm (post erection of structures) (to be proven by initial and routine load tests specified in Job Supply specification) for Shallow foundation with liquefaction mitigation of soil layers as per geotechnical report. (Unit of measurement -Rm starting from Cut off Level i.e. 2.6 Metre from FGL to the Termination Toe of Stone Column).
600 mm dia stone column
700 mm dia stone column
800 mm dia stone column
DESIGN CALCULATIONS Provide design calculations depicting desired net SBC and mitigation of liquefaction & method to achieve the same in line with specification TP-1ZZZA-CV-SPE-0040. Also, provide stone columns layout for item no. 16.1 for EPCM2 approval before start of execution
Approval of IIT or NIT for item no. 16.2 before start of execution
STONE COLUMNS AROUND CONCRETE PILES FOR LIQUEFACTION MITIGATION
Provide and construct 600 mm dia stone columns of minimum length of 10.5 M below bottom of foundation (2.5 m below FGL) including all material, labour etc. all complete as per specifications between and around 500/600/750mm dia. concrete piles with liquefaction mitigation of soil layers as per geotechnical report. Length of each stone column shall be measured from bottom of foundation level as per actual driving records or as per IFC Drawings (boring / filling above founding level till working Level shall not be considered). Bottom of foundation Level shall be as per the IFC Drawings.
Provide and construct 700 mm dia stone columns of minimum length of 10.5 M below bottom of foundation (2.5 m below FGL) including all material, labour etc. all complete as per specifications between and around 500/600/750mm dia. concrete piles with liquefaction mitigation of soil layers as per geotechnical report. Length of each stone column shall be measured from bottom of foundation level as per actual driving records or as per IFC Drawings (boring / filling above founding level till working Level shall not be considered). Bottom of foundation Level shall be as per the IFC Drawings.
Provide and construct 800 mm dia stone columns of minimum length of 10.5 M below bottom of foundation (2.5 m below FGL) including all material, labour etc. all complete as per specifications between and around 500/600/750mm dia. concrete piles with liquefaction mitigation of soil layers as per geotechnical report. Length of each stone column shall be measured from bottom of foundation level as per actual driving records or as per IFC Drawings (boring / filling above founding level till working Level shall not be considered). Bottom of foundation Level shall be as per the IFC Drawings.
DESIGN CALCULATIONS Provide design calculations for 16.3.1,16.3.2 &16.3.3 depicting desired increase in N-value in order to mitigate soil liquefaction for the unit (Corresponding piling layouts provided later by EPCM2) & method to achieve that N-value in line with specification TP-1ZZZA-CV-SPE-0040. Also provide stone columns layout between and around concrete piles for item no. 16.3.1,16.3.2 &16.3.3 for EPCM2 approval before start of execution
Approval of IIT or NIT for item no. 16.3.7 before start of execution
To carry out specified no. of initial load tests on single columns (at 1.5 times design load as per clause 3.5 of IS15284 part 1. Contributory area for Design load should be calculated in line with clause 7.4 of IS15284 part 1) at specified locations as given by the consultant/client as per Job Supply specifications with necessary kentledge etc. complete in all respects and making a report there of to confirm achievement of net SBC as mentioned in item 16.1
To carry out vertical plate initial load tests on ground within a group of three adjacent stone columns (at 1.5 times design load as per clause 3.5 of IS15284 part 1. Contributory area for Design load should be calculated in line with clause 7.4 of IS15284 part 1) at specified locations as given by the consultant/client as per Job Supply spec.to confirm achievement of net SBC as mentioned in item 16.1
To carry out specified no. of routine load tests on single columns (at 1.1 times design load as per clause 3.6 of IS15284 part 1. Contributory area for Design load should be calculated in line with clause 7.4 of IS15284 part 1) at specified locations as given by the consultant/client as per Job Supply specifications with necessary kentledge etc. complete in all respects and making a report thereof to confirm achievement of net SBC targeted for item 16.1
To carry out vertical plate routine load tests on ground within a group of three adjacent stone columns(at 1.1 times design load as per clause 3.6 of IS15284 part 1. Contributory area for Design load should be calculated in line with clause 7.4 of IS15284 part 1) at specified locations as given by the consultant/client as per Job Supply spec. and making a report thereof to confirm achievement of net SBC targeted for item 16.1
Conducting Electric Static cone penetration test (ECPT) conforming to ASTM D5778-20 for minimum 10.5M depth to specify N-Value for item 16.3.1,16.3.2,16.3.3 at specified depths to confirm improvement in N-value to nullify liquifaction patential.
Stone Sand Blanket (Applicable only below shallow foundation with SBC improvement) The stone sand blanket shall be laid over the top of the stone columns for minimum 500mm thickness or as per the governing design criteria and will be compacted to a relative dry density of 85 percent. Compaction shall be carried out with rollers or by any other suitable mechanical equipment. Stone / Sand shall be laid in layers of 150mm and compacted to achieve desired compaction. The Stone Sand Blanket shall be constructed with mixture of 75 mm and down stone aggregates and well graded medium to coarse sand of Fineness Modulus not less than 2.2 mixed in the ratio of 2:1 (2 Stone Aggregates: 1 sand).
EMPTY BORING FOR STONE COLUMN Empty boring for stone columns measured from working level to bottom of foundation level and filling with natural soil/sand for following dia stone columns. (Applicable for both Stone Column below Shallow Foundation & Stone Column around Concrete Piles)
All activities and scope same as item no 16.10. but for 600mm dia stone column
All activities and scope same as item no 16.10. but for 700mm dia stone column
All activities and scope same as item no 16.10. but for 800mm dia stone column
COMPACTION GROUTING/ GROUND IMPROVEMENT Designing & supplying all material, tools, tackles and carrying out compaction grouting as specified, and to control settlements, as per design, guidelines, material specifications, construction methods given in Job supply specification. Mobilisation of adequate number of rigs, tools, tackles, plant, equipment etc. and all accessories required for the execution of the compaction grouting as per specifications and demobilising the same after the works are complete.
COMPACTION GROUTING AROUND CONCRETE PILES FOR LIQUEFACTION MITIGATION
Provide and execute compaction grouting of minimum length of 10.5 M below bottom of foundation (2.5 m below FGL) including all material, labour etc. all complete as per specifications between and around 500/600/750mm dia. concrete piles with liquefaction mitigation of soil layers as per geotechnical report. (Unit of measurement -Cubic Meter starting from 2.5 m below FGL ). This includes Rotary Drilling with NW size (89 mm) casing/stringer rod installed in vertical/inclined direction (as per site requirements), using wash boring method & as per grid of spacing based on approved drawing, in soil from FGL/WPL to the required depth including cost of all machinery, labour, fuel & water charges as directed by Engineer In Charge.
DESIGN CALCULATIONS Provide design calculations for 17.1.1 depicting desired increase in N-value in order to mitigate soil liquefaction for the unit (Corresponding piling layouts provided by EPCM2) & method to achieve that N-value in line with specification TP-1ZZZA-CV SPE?0039. Also provide compaction grouting pipes layout between and around concrete piles for item no. 17.1.1 for EPCM2 approval before start of execution
Approval of IIT or NIT for item no. 17.2 before start of execution
Conducting Electric Static cone penetration test (ECPT) conforming to ASTM D5778-20 for minimum 10.5 M depth to specify N-Value for piled area for item 17.1.1 as per reuirements given in IS13094:1992 clause 9.2 at specified depths to confirm improvement in N-value to nullify get the desired net SBC
DISMANTLING: Dismantling of existing structures or part (taking all necessary safety precautions) at all levels and breaking in to small pieces (suitable for backfilling) including all leads and lifts supply of all tools & tackles, labour, crane,consumables. necessary scaffolding, propping, underpinning etc.and disposal within refinery premises , all complete as specified and directed by Engineer-in-charge.
All type of RCC, PCC, BRICK WORK
Dismantling and removal of existing steel structure,members,pipes,cables etc. including cutting and disposal anywhere within refinery premises , all complete as specified and directed by Engineer-in-charge.
Keller Ground Engineering India Pvt Ltd
M/s ITD Cementation India Limited
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .