| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 CrAccepted-AOC | ₹4.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹5.0 Cr+₹10.3 L (2.12%)Rejected-Finance 1 292 SOUTHSTREET THIYAGAVAN SERI RAMANATHAPURAM 623530 | RAMANATHAPURAM | TAMIL NADU | 623530 | ₹5.0 Cr+₹10.3 L (2.12%) | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical PEURAYUR KAMUTHI TALUK RAMANATHAPURAM | RAMANATHAPURAM | TAMIL NADU | 623115 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | MKT SUMAN Private Limited L2 | SRI BALAMURUGAN AND CO L1 |
|---|---|---|---|---|---|
| 1.00Part I- Strengtherning the Road From Ramnad Municipal Limit to Salaikudieruppu road in Madakootan Panchayat KM 0/0-3/820 (R-7) in Ramanathapuram Block. | |||||
| 2.00Picking the Existing B.T surface including all labour charges etc complete | |||||
| 3.00 | KM 0/0-3/820 | 4,535.13 | Sqm | 21.84 ₹99,047.24 | 21.5 ₹97,505.29 Lowest |
| 4.00Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte. | |||||
| 5.00 | KM 0/0-3/820 | 1,306.12 | cum | 131.29 ₹1,71,480.49 Lowest | 131.29 ₹1,71,480.49 Lowest |
| 6.00Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. | |||||
| 7.00 | KM 0/0-1/0 | 224.01 | cum | 918.69 ₹2,05,795.75 Lowest | 918.69 ₹2,05,795.75 Lowest |
| 8.00 | KM 1/0-2/0 | 186.75 | cum | 928.12 ₹1,73,326.41 Lowest | 928.12 ₹1,73,326.41 Lowest |
| 9.00 | KM 2/0-3/0 | 222.71 | cum | 937.55 ₹2,08,801.76 Lowest | 937.55 ₹2,08,801.76 Lowest |
| 10.00 | KM 3/0-3/820 | 182.86 | cum | 946.98 ₹1,73,164.76 Lowest | 946.98 ₹1,73,164.76 Lowest |
Tender Value
Refer Docs
EMD Value
₹5.0 L
Closing Date
2 Jun 2025, 3:00 pmClosed
The Additional Collector (Dev.)
DRDA, Ramanathapuram
Ramanathapuram District - Ramanathapuram and Kamuthi Block - 21/MGSMT/2025-26
2025_RDTN_559354_1
R3/1988/2025
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA
As per Tender Document
4 documents required · 4 mandatory
₹0
₹5.0 L
2 Sept 2025
19 May 2025
2 Jun 2025
19 May 2025
2 Jun 2025
19 May 2025
Amount
Part I- Strengtherning the Road From Ramnad Municipal Limit to Salaikudieruppu road in Madakootan Panchayat KM 0/0-3/820 (R-7) in Ramanathapuram Block.
Picking the Existing B.T surface including all labour charges etc complete
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road marking with Hot Applied Thermopalstic compound with reflectorising Glass beads on Bituminous surface
Kilo metre stone
Hecta metre stone
providing and Fixing of Sign Board for Stanadard Spectifiaction
Part II: Strengtherning the road From Vannikudi to Vella Road KM 0/0-1/440,(R-84) in Ramanathapuram Block.
Picking the Existing B.T surface including all labour charges etc complete
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road marking with Hot Applied Thermopalstic compound with reflectorising Glass beads on Bituminous surface
60cm Equilateral trainangle Cautinotry Sign Board
60cm cricle sign board
Chevron Sign 90cm Octagan
Kilo metre stone
Hecta metre stone
Culvert 1.50m Span CH- 650 M
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte.
Cement concrete with (1:4:8) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
Below G.L Supply nd erection of Steel Centering including cost and all labour charges for concrete works etc., complete
Above G.L Supply nd erection of Steel Centering including cost and all labour charges for concrete works etc., complete
Cement concrete with (1:3:6) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
Cement concrete with (1:2:4) mix using 20mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
R.C.C (1:1 1/2:3) using 20mm HBG metal including cost and conveyance of all labour charges etc.
Suppling and fabrication charges for Steel including cost and conveyance of all materials and labour charges etc complete.
Provision for Bitumen Pad Including all Labour Charges
Part - III Strengthening road from V.Moolakaraipatti - Melaramanathi road in Km 0/0-3/90 in Kamuthi Block.
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,
Picking the Existing B.T surface including all labour charges etc complete
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road marking with Hot Applied Thermopalstic compound with reflectorising Glass beads on Bituminous surface
Hecta metre stone
Kilo metre stone
Providing and fixing of Sign board for Standard specification
Construction of Minor Bridge at Ch 05m
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting butinclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation as per standard specification
Supplying and filling in foundation and basement with FILLING SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification
Cement Concrete 1:4:8 mix Using Hand Broken Granite 40 mm stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below Sill)
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above Sill)
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (20mm Metal)
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete. (Below Sill Level)
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete. (Below Sill Level)
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete. (Above Sill Level)
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C work
Construction of un - reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement thickness as per design, over a prepared surface with 43 grade cement or any other type as per clause 1501.2.2 M30 (Grade), coarse and fine aggregates confirming to IS: 383, maximum size of coarse aggegate not exceeding 25mm mixed in a concrete mixer of not less than 0.2 Cum capacity and appropriate weigh batcherusing approved mixer design laid in approved fixed side forwork (steel channel, laying and fixing of 125microns thick polythene film, wedges, steel plates etc, complete
Providing and Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per Drawing and MORD Technical Specification.
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Construction of 1.50m Span RCC Slab Culvert at Ch 130m
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting butinclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation as per standard specification
Supplying and filling in foundation and basement with FILLING SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification
Cement Concrete 1:4:8 mix Using Hand Broken Granite 40 mm stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
Cement Concrete 1:3:6 Using 40 mm gauge Hand Broken Granite stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
Cement concrete 1:2:4 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.(Below Sill)
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.(Below Sill)
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.(Above Sill)
Cement concrete 1:2:4 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C work
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall & Deck slab
Provisding fixing for Tar Paper for bearing between Bed block & Deck Slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Construction of 1.50m Span RCC Slab Culvert at Ch 350
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting butinclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation as per standard specification
Supplying and filling in foundation and basement with FILLING SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification
Cement Concrete 1:4:8 mix Using Hand Broken Granite 40 mm stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
Cement Concrete 1:3:6 Using 40 mm gauge Hand Broken Granite stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
Cement concrete 1:2:4 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.(Below Sill)
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.(Below Sill)
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.(Above Sill)
Cement concrete 1:2:4 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C work
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall & Deck slab
Provisding fixing for Tar Paper for bearing between Bed block & Deck Slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Construction of 1.50m Span RCC Slab Culvert at Ch 1380m
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting butinclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation as per standard specification
Supplying and filling in foundation and basement with FILLING SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification
Cement Concrete 1:4:8 mix Using Hand Broken Granite 40 mm stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
Cement Concrete 1:3:6 Using 40 mm gauge Hand Broken Granite stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
Cement concrete 1:2:4 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.(Below Sill)
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.(Below Sill)
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.(Above Sill)
Cement concrete 1:2:4 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C work
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall & Deck slab
Provisding fixing for Tar Paper for bearing between Bed block & Deck Slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Construction of 1.50m Span RCC Slab Culvert at Ch 2437m
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting butinclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation as per standard specification
Supplying and filling in foundation and basement with FILLING SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification
Cement Concrete 1:4:8 mix Using Hand Broken Granite 40 mm stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
Cement Concrete 1:3:6 Using 40 mm gauge Hand Broken Granite stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
Cement concrete 1:2:4 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.(Below Sill)
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.(Below Sill)
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.(Above Sill)
Cement concrete 1:2:4 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C work
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall & Deck slab
Provisding fixing for Tar Paper for bearing between Bed block & Deck Slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Construction of 1.50m Span RCC Slab Culvert at Ch 2940
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting butinclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation as per standard specification
Supplying and filling in foundation and basement with FILLING SAND in layers not more 15 cm thick well rammed watered and compacted .complete complying to standard specification
Cement Concrete 1:4:8 mix Using Hand Broken Granite 40 mm stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
Cement Concrete 1:3:6 Using 40 mm gauge Hand Broken Granite stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
Cement concrete 1:2:4 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.(Below Sill)
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.(Below Sill)
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.(Above Sill)
Cement concrete 1:2:4 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C work
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall & Deck slab
Provisding fixing for Tar Paper for bearing between Bed block & Deck Slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Construction of Toe wall at Ch 3200-3677m
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting butinclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation as per standard specification
Cement Concrete 1:4:8 mix Using Hand Broken Granite 40 mm stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
Cement Concrete 1:3:6 Using 40 mm gauge Hand Broken Granite stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete.
Providing Expansion joint for every 10m interval
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
MKT SUMAN Private Limited (BID ID -1356767)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .