Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC PLOT NO 1629 SHARMA CHHAK TALCHER ANGUL ODISHA 759107 | ANUGUL | ODISHA | 759107 | L1 | Accepted-AOC ACCEPTED AND AWARDED SINCE THE BIDDER IS L-1 | |
| 2 | L2₹3.9 L+₹1.4 L (53.8%)Rejected-Finance | L2 | Rejected-Finance SINCE THE BIDDER IS NOT L1 | |
| 3 | L3₹4.1 L+₹1.5 L (58.6%)Rejected-Finance AT PO GHANTAPADA TALCHER DIST ANGUL ODISHA PIN 759103 | TALCHER | ANGUL | ODISHA | 759103 | L3 | Rejected-Finance SINCE THE BIDDER IS NOT L1 |
| Sl No | Description | Qty | Unit | M/S. BHANJA ENGINEERING WORKS L2 | M/S M BADAR ENTERPRISES L3 | JAY JAGANNATH ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00Materials | ||||||
| 1.01 | Front wheel oil seal | 2 | Pc | 147 ₹294 | 151 ₹302 | 95 ₹190 Lowest |
| 1.02 | Front wheel bearing (Small) | 2 | Pc | 1,255 ₹2,510 | 1,291 ₹2,582 | 813 ₹1,626 Lowest |
| 1.03 | Rear wheel oil seal | 4 | Pc | 205 ₹820 | 211 ₹844 | 133 ₹532 Lowest |
| 1.04 | Rear wheel bearing | 1 | Pc | 2,830 ₹2,830 | 2,911 ₹2,911 | 1,833 ₹1,833 Lowest |
| 1.05 | Bearing grease | 4 | Kg | 578 ₹2,312 | 594 ₹2,376 | 374 ₹1,496 Lowest |
| 1.06 | Axle packing, Washer, Split Pin etc | 1 | LS | 158 ₹158 | 162 ₹162 | 102 ₹102 Lowest |
| 1.07 | Wheel hub stud and nut (F&R) | 6 | Pc | 210 ₹1,260 | 216 ₹1,296 | 136 ₹816 Lowest |
| 1.08 | Mobil filter | 1 | Set | 609 ₹609 | 626 ₹626 | 394 ₹394 Lowest |
| 1.09 | Water separator | 1 | Set | 2,095 ₹2,095 | 2,155 ₹2,155 | 1,357 ₹1,357 Lowest |
Tender Value
₹3.8 L
EMD Value
₹4,700
Closing Date
28 Jul 2025, 5:00 pmClosed
SO eNM LINGARAJ AREA
OFFICE OF THE GENERAL MANAGER LINGARAJ AREA, AT/PO- DEULBERA COLLIERY, DIST- ANGUL, ODISHA, 759102
Repairing / Maintenance work of School Bus of TATA-1512 bearing Regd. No- OD-35-4949 of Lingaraj OCP, Lingaraj Area, MCL
2025_MCL_339625_1
GM/LA/SO/EnM/e-Ten/25-26/18 DT-15.07.25
Open Tender
Miscellaneous Works
Item Rate
21 days
LINGARAJ OCP
AS PER NIT
3 documents required · 3 mandatory
₹4,700
13 Sept 2025
16 Jul 2025
30 Jul 2025
17 Jul 2025
28 Jul 2025
17 Jul 2025
17 Jul 2025 - 21 Jul 2025
Amount
Materials
Front wheel oil seal
Front wheel bearing (Small)
Rear wheel oil seal
Rear wheel bearing
Bearing grease
Axle packing, Washer, Split Pin etc
Wheel hub stud and nut (F&R)
Mobil filter
Water separator
Diesel filter
Air filter set
Front air brake liner with rivets (O/S)
Rear air brake liner with rivets (O/S)
Brake ratchet assly (F&R)
New clutch plate assly (GB-40)
Pressure plate assly (GB-40)
Release bearing assly
Clutch fork
Clutch cylinder assly
Clutch cylinder hose pipe
U J Cross assly
G.B. Flange
Cross holder assly
Tie rod end assly
Drag link assly
King pin assly (Major)
Rear axle (Shaft assly)
New rexin
Bostic, Kamdi Clip etc
Shaft Bolt and Nut
Aluminium cheker plate (8'x1')
G I Plate 18 gauge (8'x1')
Nut and Bolt with Washer
Aluminium jali
Window fibre glass
Piston liner sleeve
Piston ring
Engine full gakset
New piston assly
C.R. Bush
Main bearing
Connecting rod bearing
Cam bush
Valve guide
Valve seat
Valve lock
Valve oil seal
Oil pump assly
Cam shaft assly
Head tiki
Inlet and exhaust valve
Anabond
Trust washer
Head jacket
Connecting rod assly
Labour Charges
Dismantling, greasing and re-fitting of Front and rear wheel hub
Polishing of both Front & Rear Brake drum
Front and rear brake system repairing works
Replacement of filters and engine tuning works and changing of Engine oil (Deptt. Supply)
Dismantling and repairing of Gear box and clutch system and re fitting the same after overhauling
Opening and fitting of brake ratchet, clutch cylinder, rear axle shaft
Replacement of U J Corss, G.B. Flange, Cross-holder, Tie rod assly and Drag link assly
King pin opening, repairing / overhauling and fitting
Lathe/ Machining, rimouring work of king pin & bush and front axle
Front axle opening and refitting
Removal of Complete seat and repairing/ stitching and fitting
Seat frame opening, welding / repairing and fitting
Front and rear mud-guard making / welding and fitting with floor repairing and checker plate setting
Both side jali opening, repairing, welding and fitting
Opening and fitting of broken and damaged side glass
Dismantling of engine system and re fitting the same after overhauling
Head opening,testing / polishing works
Lathe / machining work of engine including valve, seat etc resetting and others
Piston liner sleeve opening and refitting
F.I. Pump opening, caliberating / overhauling and fitting with needful materials
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
M/S. BHANJA ENGINEERING WORKS (BID ID -1170587)
M/S M BADAR ENTERPRISES (BID ID -1170584)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .