| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 CrAccepted-Finance AT LOKAPADA PO P S AUL DISTRICT CUTTACK PIN 754219 | CUTTACK | CUTTACK | ODISHA | 754219 | ₹6.7 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹7.1 CrAccepted-Finance AT PO POSUDA ODISHA PIN 757102 | POSUDA | MAYURBHANJ | ODISHA | 757102 | ₹7.1 Cr | L2 | Accepted-Finance L2 |
| 3 | L3₹7.1 CrAccepted-Finance A CLASS DEGREE ENGG CONTRACTOR AT WARD NO 02 P O BHANJPUR DIST MAYURBHANJ | MAYURBHANJ | ODISHA | ₹7.1 Cr | L3 | Accepted-Finance L3 |
| 4 | L4₹7.2 CrAccepted-Finance | ₹7.2 Cr | L4 | Accepted-Finance L4 |
| 5 | L5₹7.4 CrAccepted-Finance | ₹7.4 Cr | L5 | Accepted-Finance L5 |
Tender Value
₹9.1 Cr
EMD Value
₹9.1 L
Closing Date
13 Feb 2026, 5:00 pmClosed
CCE RWC Baripada
CCE RWC Baripada
PWD Road to Sorisakatha Road Under MMSY-DRR in the District Mayurbhanj for the year 2025-26.
2026_CERWI_125139_1
NCB No 402 Road MMSY DRR
National Competitive Bid
Civil Works - Roads
270 days
SE RW Division, Udala
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹9.1 L
Yes
7 Apr 2026
29 Jan 2026
16 Feb 2026
29 Jan 2026
13 Feb 2026
29 Jan 2026
29 Jan 2026 - 12 Feb 2026
Clearing grass and removal of rubbish up to a distance of 50 mtr outside the periphery of the area and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per specification and as per the direction of Engineer -in –charge.
Dismantling of existing structures like culverts, bridges, retaining walls and other sturcture comprising of masonry, cement concrete wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead of 1000m as per Technical Specification Clause 202
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by manual means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoSRT&H Specifications for Road & Bridge works (4th Revision)and as per the direction of engineer in charge.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site).
Construction of granular sub-base by providing close grade granular sub-base grading-III material as per table-100-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per clause 401 of MOSRT&H Specifications for Road & Bridges work (4th Revision) as per direction of Engineer-in-Charge. (Material with Crushiable like stone screening)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including pre mixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Clause 406 of MoSRT&H Specifications for Road & Bridge works (4th Revision).
Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub-base, with 43 grade cement or any other type as per Clause 1501.2.2, M30 (grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars near approaches to bridges and culverts (expansion joints), admixtures as approved, curing of concrete slabs for 14 days, curing compound and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.
Earth work in excavation of foundation & plinth in hard soil including levelling the bed etc complete as per the direction of Engineer in charge.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Providing and laying reinforced cement concrete pipe NP3 for culverts including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106 of MoRD but excluding the charges of GST & as per direction of the Engineer-in-Charge.
HPC 600 mm Dia Single Row
HPC 1000 mm Dia Single Row
HPC 1000 mm Dia Double Row
Cement concrete of M-150 having maximum compressive strength of 150 kg./cm2 ( test to be conducted) on 150 mm. cubes tested at 28 days including curing (tests conducted in accordance with IS-456 & IS-516) & conforming to clause-302 of IRC 21/1987 using clean crusher broken hard granite coarse aggregate of 40 mm. size down grade of approved quality to be protested in the laboratory) obtained from approved quarry the proportion mix, grading conforming to relevant ISI/IRC codes pre-approved including arranging of reinforcement as per approved drawing including hoisting, lowering concrete in layers not exceeding 150 mm. thick each compacting with vibrator watering & curing for 28 days centering shuttering & finishing the exposed surface smooth providing grooves & beads where necessary including cost, conveyance royality & taxes of all labour machineries etc. required for the work complete in all respects including dismantling the centering & shuttering as per specification & direction of Engineer-in-Charge.
Foundation
Sub-Structure
RCC of design mix of M-25 grade having specified characteristics compressive strength/ target mean strength of 300kg./cm2 in design mix with minimum quantity of cement as specified in IRC Code of 150 mm. cubes at 28 days curing after mixing & tests conducted in accordance with relevant clauses of IS 456/IS 516/IRC 216/1987/IRC-78/1983 using crusher broken granite course aggregate of 20mm. .sizes & proportion as specified in clause-302.6.2 of IRC 21/1987 & IS-10262 & subject to mix design in conformity with the grading & proportion of different materials for concrete as specified in the relevant codes of approved quality, obtained from approved quarry & using minimum quantity of cement confirming to codal provision including hoisting, lowering & laying concrete in layers not exceeding 15cm thick compacting with vibrators watering & curing for 28 days including water tight steel centering , shuttering & form works finishing the exposed surface smooth providing beads & grooves wherever necessary including cost, conveyance royalties and all other taxes of all materials with all leads & lifts, cost of all labour T&P & machineries etc. required for the work including dewatering if necessary, complete in all respects as per direction of the Engineer-in-Charge but excluding cost, conveyance of tor steel & binding wire & labour charges for straightening, cutting, bending, binding welding & tying the grills lapping spacing etc. where ever necessary & hoisting & placing in position ( to be paid separately as required for RCC works)
Foundation
Sub-Structure
Super-Structure
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 and as per the direction of the Engineer-in-charge.
Rough Stone Dry Packing in approns and Revetment with hard Granite Stones. etc, complete as per specification & direction of Engineer in charge.
RCC of design mix of M-300 grade having specified characteristics compressive strength/ target mean strength of 300kg./cm2 in design mix with minimum quantity of cement as specified in IRC Code of 150 mm. cubes at 28 days curing after mixing & tests conducted in accordance with relevant clauses of IS 456/IS 516/IRC 216/1987/IRC-78/1983 using crusher broken granite course aggregate of 20mm. .sizes & proportion as specified in clause-302.6.2 of IRC 21/1987 & IS-10262 & subject to mix design in conformity with the grading & proportion of different materials for concrete as specified in the relevant codes of approved quality, obtained from approved quarry & using minimum quantity of cement confirming to codal provision including hoisting, lowering & laying concrete in layers not exceeding 15cm thick compacting with vibrators watering & curing for 28 days including water tight steel centering , shuttering & form works finishing the exposed surface smooth providing beads & grooves wherever necessary including cost, conveyance royalties and all other taxes of all materials with all leads & lifts, cost of all labour T&P & machineries etc. required for the work including dewatering if necessary, complete in all respects as per direction of the Engineer-in-Charge but excluding cost, conveyance of tor steel & binding wire & labour charges for straightening, cutting, bending, binding welding & tying the grills lapping spacing etc. where ever necessary & hoisting & placing in position ( to be paid separately as required for RCC works)
Wearing Coat
Supply of HYSD bars confirming to grade S-415 cutting bending, binding, lapping, splicing, welding etc. (conforming to ISI specification) & jointing if necessary by lapping & tying the grills & placing in position as required for RCC works as per the approved design, hoisting, lowering & laying position including cost & conveyance of tor steel & binding wires of 18 to 20 gauge(as to be approved by the Deptt.) etc. complete (weight of binding wire shall not be considered for payment at all which will be borne by the contractor (standard CO-efficient of different sizes of the steel shall be considered & welding & lapping should confirm to relevant clause of IRC-21/1987)
Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
Providing and erecting Informatory retro-reflectorised sign as per IRC-67-2012 made of class-B retro-reflective sheeting of high intensity prismatic grade sheeting as per ASTMD4956-09type-III and IV strictly conforming to clause 6.7of IRC67-2012 and vide clause 801.3, fixed over aluminium sheeting, 2.00mm thick as per clause 6.5.2 of IRC:67-2012 or A.C.P (Aluminium Composite Panel) used for sign boards with a thermo plastic core of blow density polythylene (LDPE) between two thick sheets of aliminium with over all thickness of 4mm and aliminium thichness of 0.5mm on both sides supported on mildsteel square post 80mmx80mmx3mm, 2nos and 5nos horizontal and 3no vertical extra supporting member of M.S pipe of size 50mmx50mmx3mm firmly fixed to the ground by means properly designed foundation withM-15 grade cement concrete 90cmx90cmx15cm, 150cm below ground level of as per approved drawing including cost, conveyance, royality, taxes of all materials, labour, T&P, excavation, curingetc. complete,under supervision of Engineer-In-Charge.Size-12'X8'(3657mm x 2438mm Rectangle)
Providing and erecting direction and place identification retro-reflectorized sign as per IRC 67made of high intensity grade sheeting vide Clause 801.3, fixed over Aluminium sheeting 2mm thick supported on a mild steel single/double angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade concrete 45 x 45 x 60 cm, 60 cm below ground level as per drawing and technical specfication Clause 801 of of specification for road & bridge works (5th revision) & as directed by Engineer in charge..
600 mm Equilateral traingle
600 mm Circular
Provision for Road sinage masonary structure for citizen information board,painting of 200 m & k.m stone etc complete and as per the direction of engineer in charge.
5th Kilometer stone
Ordinary Kilometer stone
200 mm stone
200 mm dia RCC guard post.
Maintenance
Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment ,level and slopes as per technical specification Clause 1902
1 st Year
2 nd Year
3 rd Year
4 th Year
5 th Year
1 st Year
2 nd Year
3 rd Year
4 th Year
5 th Year
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903
1 st Year
2 nd Year
3 rd Year
4 th Year
5 th Year
Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1908
1 st Year
2 nd Year
3 rd Year
4 th Year
5 th Year
Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912
1 st Year
2 nd Year
3 rd Year
4 th Year
5 th Year
Cutting of branches of trees and shrubs from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914
1 st Year
2 nd Year
3 rd Year
4 th Year
5 th Year
Cutting of shrubs from the road way or with in R.O.W and disposal of shrubs to suitable locations as per technical specifications Clause 1914
1 st Year
2 nd Year
3 rd Year
4 th Year
5 th Year
Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914
1 st Year
2 nd Year
3 rd Year
4 th Year
5 th Year
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
techsummary_577969.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.19 MB
DTCN1.pdf
Tender Documents • 27.96 MB
BOQ_577969.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid