| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.3 LAccepted-AOC | ₹28.3 L | L1 | Accepted-AOC Award of Contract |
| 2 | L2₹28.8 L+₹47,402.58 (1.67%)Rejected-Finance | ₹28.8 L+₹47,402.58 (1.67%) | L2 | Rejected-Finance Not Being Lowest |
| 3 | L3₹30.3 L+₹1.9 L (6.72%)Rejected-Finance | ₹30.3 L+₹1.9 L (6.72%) | L3 | Rejected-Finance Not Being Lowest |
| 4 | L4₹31.4 L+₹3.0 L (10.7%)Rejected-Finance | ₹31.4 L+₹3.0 L (10.7%) | L4 | Rejected-Finance Not Being Lowest |
| 5 | L5₹33.4 L+₹5.0 L (17.7%)Rejected-Finance | ₹33.4 L+₹5.0 L (17.7%) | L5 | Rejected-Finance Not Being Lowest |
| Sl No | Description | Qty | Unit | M/s Meher Construction L2 | Ms. M.D. Auty L1 | MS. N.R. PENTA AND SONS L4 | M/S-B.R.SONAWANE L6 | MS. A.S. CONSTRUCTION L8 | sardar construction L7 | M/S. AMERHAMZA GULAB SHAIKH L5 | M/S SHOURYA ENGINEERS AND CONTRACTORS L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface excavation n.exc (not exceeding) 30cm deep and avreging 15cm deep and getting out in soil / loose soil. | 660.8 | Sqm | 69 ₹45,595.2 | 25 ₹16,520 | 50 ₹33,040 | 20 ₹13,216 | 25 ₹16,520 | 45 ₹29,736 | 50 ₹33,040 | 10 ₹6,608 Lowest |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas in any type of Soil (exceeding 30cm to 1.5mtr in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge. Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 1,707 | Cum | 118 ₹2,01,426 Lowest | 190 ₹3,24,330 | 120 ₹2,04,840 | 130 ₹2,21,910 | 125 ₹2,13,375 | 125 ₹2,13,375 | 200 ₹3,41,400 | 200 ₹3,41,400 |
| 3.00 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas in any type of Soil (exceeding 1.5m to 3.0mtr in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto top, as directed by Engineer-in-charge. Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 969 | Cum | 186 ₹1,80,234 | 200 ₹1,93,800 | 190 ₹1,84,110 | 200 ₹1,93,800 | 140 ₹1,35,660 Lowest | 185 ₹1,79,265 | 240 ₹2,32,560 | 225 ₹2,18,025 |
| 4.00 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas in ordinary rock (exceeding 1.50 m to 3.00mtr in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto top, as directed by Engineer-in-charge. Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 1,200 | Cum | 350 ₹4,20,000 | 240 ₹2,88,000 | 280 ₹3,36,000 | 650 ₹7,80,000 | 150 ₹1,80,000 Lowest | 300 ₹3,60,000 | 350 ₹4,20,000 | 250 ₹3,00,000 |
| 5.00 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas in ordinary rock (exceeding 3.00m to 4.50mtr in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto top, as directed by Engineer-in-charge. Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 814.4 | Cum | 425 ₹3,46,120 | 270 ₹2,19,888 | 440 ₹3,58,336 | 800 ₹6,51,520 | 170 ₹1,38,448 Lowest | 400 ₹3,25,760 | 400 ₹3,25,760 | 300 ₹2,44,320 |
| 6.00 | Excavation in trenches n.exc 1.5M wide and n.exc 1.5M in depth; and getting out in Hard / dense soil | 148.8 | Cum | 150 ₹22,320 | 200 ₹29,760 | 600 ₹89,280 | 140 ₹20,832 Lowest | 250 ₹37,200 | 150 ₹22,320 | 200 ₹29,760 | 200 ₹29,760 |
| 7.00 | M&L for PCC 1:4:8 type D2 (40mm graded aggregate) in foundations, filling and mass concrete. | 37.52 | Cum | 3,786 ₹1,42,050.72 | 4,100 ₹1,53,832 | 2,800 ₹1,05,056 | 4,200 ₹1,57,584 | 3,850 ₹1,44,452 | 4,000 ₹1,50,080 | 4,000 ₹1,50,080 | 2,500 ₹93,800 Lowest |
| 8.00 | Concrete bed to drain pipes including packing under, and haunching against the sides of pipes after they are laid and tested;in | 372 | RM | 146 ₹54,312 | 90 ₹33,480 | 300 ₹1,11,600 | 120 ₹44,640 | 80 ₹29,760 Lowest | 350 ₹1,30,200 | 280 ₹1,04,160 | 120 ₹44,640 |
| 9.00 | M&L for type C1 1:3:6 (20mm graded aggregate) set in CM 1:6 Pre-cast cement concrete block masonry with solid blocks, exc. 10 cm in width and setting in mortar, complete all as specified. | 41.28 | Cum | 4,000 ₹1,65,120 Lowest | 5,900 ₹2,43,552 | 4,500 ₹1,85,760 | 4,000 ₹1,65,120 Lowest | 5,700 ₹2,35,296 | 6,500 ₹2,68,320 | 5,500 ₹2,27,040 | 5,800 ₹2,39,424 |
| 10.00 | S&F GI Pipes 100 mm heavy class (ISI Marked), fixed to wall with necessary clamps or laid in trenches/ floor/ wall etc and including bends complete all as specifed and directed. | 372 | RM | 1,640 ₹6,10,080 | 1,800 ₹6,69,600 | 1,650 ₹6,13,800 | 1,400 ₹5,20,800 Lowest | 1,815 ₹6,75,180 | 1,900 ₹7,06,800 | 1,680 ₹6,24,960 | 1,800 ₹6,69,600 |
Tender Value
₹40.2 L
EMD Value
₹81,000
Closing Date
10 Jun 2026, 6:00 pmClosed
Garrison Engineer (North) Ahilyanagar
Military Engineer Services Garrison Engineer (North) Nagar Pathardi Road Ahilyanagar Fort Ahilyanagar 414 002
PROVN OF RAIN WATER HARVESTING WORKS AT CERTAIN LOCATIONS OF ACC AND S AND PROVISION OF 01 x MINOR WORK AT MDC UNDER AGE BR I AT GE (N) AHILYANAGAR.
2026_MES_766617_1
8250/E8
Open Tender
Civil Works
Item Rate
180 days
Garrison Engineer (North) Ahilyanagar
As per NIT
8 documents required · 8 mandatory
₹500
Garrison Engineer (North) Ahilyanagar
₹81,000
Yes
27 Jul 2026
20 May 2026
12 Jun 2026
20 May 2026
10 Jun 2026
3 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface excavation n.exc (not exceeding) 30cm deep and avreging 15cm deep and getting out in soil / loose soil. | 660.8 | Sqm | 100 | ₹66,080 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas in any type of Soil (exceeding 30cm to 1.5mtr in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge. Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 1,707 | Cum | 100 | ₹1,70,700 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas in any type of Soil (exceeding 1.5m to 3.0mtr in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto top, as directed by Engineer-in-charge. Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 969 | Cum | 100 | ₹96,900 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas in ordinary rock (exceeding 1.50 m to 3.00mtr in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto top, as directed by Engineer-in-charge. Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 1,200 | Cum | 100 | ₹1,20,000 |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas in ordinary rock (exceeding 3.00m to 4.50mtr in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto top, as directed by Engineer-in-charge. Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr. | 814.4 | Cum | 100 | ₹81,440 |
| 6 | Excavation in trenches n.exc 1.5M wide and n.exc 1.5M in depth; and getting out in Hard / dense soil | 148.8 | Cum | 100 | ₹14,880 |
| 7 | M&L for PCC 1:4:8 type D2 (40mm graded aggregate) in foundations, filling and mass concrete. | 37.52 | Cum | 100 | ₹3,752 |
| 8 | Concrete bed to drain pipes including packing under, and haunching against the sides of pipes after they are laid and tested;in | 372 | RM | 100 | ₹37,200 |
| 9 | M&L for type C1 1:3:6 (20mm graded aggregate) set in CM 1:6 Pre-cast cement concrete block masonry with solid blocks, exc. 10 cm in width and setting in mortar, complete all as specified. | 41.28 | Cum | 100 | ₹4,128 |
| 10 | S&F GI Pipes 100 mm heavy class (ISI Marked), fixed to wall with necessary clamps or laid in trenches/ floor/ wall etc and including bends complete all as specifed and directed. | 372 | RM | 100 | ₹37,200 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
TenderDOCUS8250.pdf
Tender Documents • 1.36 MB
BOQ_858558.xls
BOQ • 0.54 MB
Amendmentletter8250-1.pdf
PDF • 0.29 MB
Amendmentletter8250.pdf
PDF • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .