Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance S F NO 472 C3 VINAYAGA GARDEN SUKKALIYUR KARUR 639 003 | KARUR | KARUR | TAMIL NADU | 639003 | Admitted-Finance |
| 2 | Rejected-Technical | Rejected-Technical BQR not satisfied |
Tender Value
Refer Docs
EMD Value
₹13,000
Closing Date
8 Dec 2022, 3:00 pmClosed
The Superintending Engineer// Tirupur EDC
OFFICE OF THE SUPERINTENDING ENGINEER, TIRUPUR ELECTRICITY DISTRIBUTION CIRCLE, 3rd FLOOR, KRBS TOWER, 208 / 650, METTUPALAYAM BUS STOP, PERUMANALLUR ROAD, TIRUPUR 641 602
Survey, Supply, Erection, Testing and Commissioning of 11 KV 3 Phase Aerial Bunched XLPE Insulated Al Cable of Size 3X95 plus 1X95 sq. mm with accessories in 11 KV Kumaranandapuram Feeder of 110/11 KV Kumar Nagar SS under UDAY Scheme
2022_EB_267236_1
Spec.WOT.116/2022-23 Dt.21.11.2022
Open Tender
Electrical Works
Turn-key
180 days
Town North Section of Tirupur Division
2 documents required · 2 mandatory
₹0
₹13,000
Yes
15 Mar 2023
23 Nov 2022
9 Dec 2022
23 Nov 2022
8 Dec 2022
23 Nov 2022
23 Nov 2022 - 8 Dec 2022
Supply of 11 KV Three Phase Aerial Bunched Cable of size 3 X 95 + 1 X 95 sq mm
Supply of Cable Straight Through Joint Kit suitable for 95 sq. mm
Supply of T Jointing Kit
Supply of End Termination Kit
Supply of Suspension Clamp Assembly including Pole Clamps
Supply of Dead End Clamp / Anchor Clamp Assembly including Brackets, Pole Clamps
Supply of End Caps
Supply of Spiral Earth Electrodes
Supply of Grounding Connection for Messenger Wire
Supply of Anchor Sleeve for Messenger Wire
Labour Charges for Erection of 11 KV Three Phase Aerial Bunched Cable of size 3 X 95 + 1 X 95 sq mm
Labour Charges for Erection of Cable Straight Through Joint Kit suitable for 95 sq. mm
Labour Charges for Erection of T Jointing Kit
Labour Charges for Erection of End Termination Kit
Labour Charges for Erection of Suspension Clamp Assembly including Pole Clamps
Labour Charges for Erection of Dead End Clamp / Anchor Clamp Assembly including Brackets, Pole Clamps
Labour Charges for Erection of End Caps
Labour Charges for Erection of Spiral Earth Electrodes
Labour Charges for Erection of Grounding Connection for Messenger Wire
Labour Charges for Erection of Anchor Sleeve for Messenger Wire
Excavation & backfilling of pole pit for pole above 8.00 m length by using JCB / manual
Erection of RCC, REC, PSC pole above 8.00 m length by using crane / manual
Erection of metal support above 9 m / RSJ / rail pole / tubular pole
Earthing of pole with GI wires 4 or 6 SWG by coil earthing
Excavation & backfilling of stay pit of 4.5 to 5 feet depth using JCB / Manual
Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.
Fixing of HT LAS (3 Nos.)
Fixing of V cross arm 3.5 feet
Fixing of HT / LT TI fitting
Dismantling of RCC, REC, PSC & metal pole of all sizes including the closing of the pit
Labour Charges for Testing & Commissioning of Complete Line
SUB TOTAL (Items 1 to 31)
EPF @ 13.00 % (Items 11 to 31)
ESI @ 3.25 % (Items 11 to 31)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .