| 1 | 1₹1.8 CrAccepted-AOC CHANDAULI | UTTAR PRADESH | 221009 | ₹1.8 Cr | 1 | Accepted-AOC 1ST LOWEST |
| 2 | 2₹1.8 Cr+₹1.1 L (0.63%)Rejected-AOC | ₹1.8 Cr+₹1.1 L (0.63%) | 2 | Rejected-AOC 2ND LOWEST |
Tender Value
₹1.9 Cr
EMD Value
₹3.7 L
Closing Date
25 Feb 2023, 3:00 pmClosed
SE XII CIRCLE IW LKO
GANGA SINCHAI BHAWAN, TELIBAGH, LUCKNOW
DOUBLE FLAT C.C. TILE LINING WORK FOR PROTECTION OF DAMAGE INTERNAL SECTIONS BETWEEN KM. 112.700 TO KM. 113.040 R/B , KM. 116.400 TO KM. 116.490 R/B and KM. 117.100 TO 117.170 L/B OF SHARADA SAHAYAK FEEDER CHANNEL LOT 1 RETENDER
2022_UPIDC_756271_5
05/SE-XII/2022-23
Open Tender
Civil Works
Fixed-rate
180 days
LUCKNOW
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
₹3.7 L
21 Mar 2023
20 Feb 2023
25 Feb 2023
20 Feb 2023
25 Feb 2023
20 Feb 2023
Amount
Cleaning thick jungle and thorney bushes without uprooting. With proper disposal.
Earth work for restoration of damaged internal slope and daula by power transport for a lead of up to 3 k.m. including excavation, loading, unloading,manual compaction and dressing including all lift
Supply and laying of sandy earth/ sand filled E.C. bages including all cost of earth , empty bags, labour, stiching with sutely, laying and placing in position for making of coffer dam etc.
Dewatering of water by 5 H.P. Diesel Pump including suction & delivery pipe, operator and P.O.L. with all labour ,T&P etc. required for proper complition of work.
Earth work in excavation for foundation of toe wall and sleeper etc. including lead up to 30 m & lift upto 1.5 m excluding mechanical compaction but including manual compaction and dressing to profile.
Centering and Shuttering for CC Work including rent of shuttering , material, labour and T&P required for proper completion of work.
Laying Cement Concrete in foundation 1:3:6 (M-10) with 20 mm crushed stone grit including cost of material, labour, T&p etc, complete.
RR Stone masonry work in 1:4 CM including 3 M lift and 60 M lead including all cost of material, labour, T&P etc. complete.
Making subgrade for Double Flat Brick lining work including watering , compaction , and preparation of surface.
Supplying & laying 75 mm thick Local sand river/silt from canal bed as subbase material below the lining.
1:2:4 Cement Concrete (M-20 ) on Curve portion & Upper side of slope with 10 to 20 mm stone grit including cost of material, labour, T&p etc, complete.
Class 150 Brick work in 1:4 CM including 3 M lift and 60 M lead including all cost of material, labour, T&P etc. complete.
Providing and applying 10 mm to 15 mm average (12.50 mm ) with 1:4 Cement mortar including all cost of material, labour, T&P etc. for proper completion of the work .
Providing and laying 75 mm Thick layer of 1st Class 150 Brick for lining work with 1:3 cement mortar with 3 M lift and 60 M lead including all cost of material, labour, T&P etc. for proper completion of the work.
Providing and applying 10 mm to 15 mm Cement Sandwitched Plaster in 1:3 C.M. including all cost of material, labour, T&P etc. for proper completion of the work .
Providing and applying 5 mm thick Cement mortar in 1:3 below CC Tile including all cost of material, labour, T&P etc. for proper completion of the work .
Providing and Laying Top Layer with C.C. Grade-( M-20) Tile of size 300x150x50 mm lining with 1:3 cement mortar including all lead & lift, material, labour, T&P etc. required for proper Completion of the Work.
Providing and filling in position bitumen mix filler of proportion 80 kg of hot bitumen 1 kg cement and 0.025 cum. Fine sand in expantion joint in width upto 1.25 cm, depth upto 5 cm including cost of material , labour, T&P cost of fuel. For proper completion of work.
DHARAM DEV CHAUHAN
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .