| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.9 LAdmitted-Finance 37 222 BUNDU KATRA AGRA UP | AGRA | UP | L1 | Admitted-Finance | |
| 2 | L2₹39.2 L+₹2.3 L (6.37%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹42.4 L+₹5.5 L (14.8%)Admitted-Finance A 103 VEERA GARDEN AMBEDKAR NAGAR ALWAR 301001 RAJ | ALWAR | RAJASTHAN | 301001 | L3 | Admitted-Finance | |
| 4 | L4₹42.5 L+₹5.6 L (15.1%)Admitted-Finance VAIDHYA GALI KHERAGARH AGRA 283121 | AGRA | AGRA | UTTAR PRADESH | 283121 | L4 | Admitted-Finance | |
| 5 | L5₹44.9 L+₹8.0 L (21.7%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Hitesh Construction L3 | M/s ASK Enterprises L6 | M/s Yash Electrical and Maintenance L7 | S.R.Enterprises L9 | PD GUPTA AND COMPANY L1 | M/S GAURI CONSTRUCTION L5 | triveni enterprises L2 | M/S KAMAKHYA CONTRACTORS L4 | vandana enterprises L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavating in trenches not exc 1.5 meter wide and not exc 1.5 meter in depth for foundation etc or for laying of cables, pipes etc and getting out in soft/loose soil complete all as specified and directed. | 790 | Cum | 150 ₹1,18,500 | 150 ₹1,18,500 | 100 ₹79,000 Lowest | 100 ₹79,000 Lowest | 100 ₹79,000 Lowest | 109 ₹86,110 | 120 ₹94,800 | 100 ₹79,000 Lowest | 100 ₹79,000 Lowest |
| 2.00 | Returning, filling in, including spreading, leveling, watering and well ramming in layers not exc 25 cm thick in soft/loose soil complete all as specified and directed. | 660 | Cum | 75 ₹49,500 | 50 ₹33,000 | 50 ₹33,000 | 35 ₹23,100 | 71 ₹46,860 | 9 ₹5,940 | 5 ₹3,300 Lowest | 30 ₹19,800 | 72 ₹47,520 |
| 3.00 | Removal of excavated soil/ material to a distance not exc 50 metre and depositing where directed at a level not exc 1.50 metre above the starting point complete all as specified and directed. | 130 | Cum | 100 ₹13,000 | 50 ₹6,500 | 10 ₹1,300 Lowest | 35 ₹4,550 | 71 ₹9,230 | 19 ₹2,470 | 10 ₹1,300 Lowest | 20 ₹2,600 | 122 ₹15,860 |
| 4.00 | Taking up or down GI tubing and connections of 15 mm bore, fixed in walls, ceiling, floors, trenches etc, complete all as specified and directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 600 | RM | 20 ₹12,000 | 15 ₹9,000 | 10 ₹6,000 | 5 ₹3,000 | 5 ₹3,000 | 4.9 ₹2,940 Lowest | 5 ₹3,000 | 10 ₹6,000 | 10 ₹6,000 |
| 5.00 | Taking up or down steel water tubing and connections of 20mm bore, fixed in walls, ceiling, floors, trenches etc. complete all as specified and directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 850 | RM | 25 ₹21,250 | 20 ₹17,000 | 10 ₹8,500 | 6 ₹5,100 | 6 ₹5,100 | 4.9 ₹4,165 Lowest | 8 ₹6,800 | 10 ₹8,500 | 10 ₹8,500 |
| 6.00 | Taking up or down steel water tubing and connections of 25mm bore, fixed in walls, ceiling, floors, trenches etc. complete all as specified and directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 680 | RM | 30 ₹20,400 | 25 ₹17,000 | 10 ₹6,800 | 7 ₹4,760 | 7 ₹4,760 | 4.9 ₹3,332 Lowest | 10 ₹6,800 | 10 ₹6,800 | 15 ₹10,200 |
| 7.00 | Taking up or down steel water tubing and connections of 40mm bore, laid in trenches etc. complete all as specified and directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 420 | RM | 35 ₹14,700 | 35 ₹14,700 | 10 ₹4,200 | 9 ₹3,780 | 8 ₹3,360 | 4.9 ₹2,058 Lowest | 12 ₹5,040 | 15 ₹6,300 | 17 ₹7,140 |
| 8.00 | Taking up or down steel water tubing and connections of 50mm bore,laid in trenches etc. complete all as specified and directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 860 | RM | 40 ₹34,400 | 40 ₹34,400 | 10 ₹8,600 | 10 ₹8,600 | 9 ₹7,740 | 4.9 ₹4,214 Lowest | 15 ₹12,900 | 15 ₹12,900 | 17 ₹14,620 |
| 9.00 | Taking up or down GI water tubing and connections of 80mm bore laid in trenches etc. complete all as specified and directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 580 | RM | 60 ₹34,800 | 45 ₹26,100 | 20 ₹11,600 | 11 ₹6,380 | 10 ₹5,800 | 5.9 ₹3,422 Lowest | 20 ₹11,600 | 15 ₹8,700 | 22 ₹12,760 |
| 10.00 | Taking up or down water tubing and connections of 100mm bore laid in trenches etc. complete all as specified and directed..
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 910 | RM | 70 ₹63,700 | 60 ₹54,600 | 20 ₹18,200 | 13 ₹11,830 | 12 ₹10,920 | 6.9 ₹6,279 Lowest | 35 ₹31,850 | 15 ₹13,650 | 25 ₹22,750 |
Tender Value
₹47 L
EMD Value
₹94,000
Closing Date
26 Aug 2026, 6:00 pmClosed
GE Alwar
Alwar
REPAIR/ MAINT OF DISTRIBUTION OF WATER SUPPLY PIPE LINE AND CONNECTED ITEMS FOR OTM AREA OF ARTY BDE, INF BDE AND DIV REGT AT ITARANA CANTT UNDER GE ALWAR
2026_MES_780242_1
8545/E8
Open Tender
Civil Works - Water Works
Item Rate
330 days
Alwar
As per NIT documents
6 documents required · 6 mandatory
₹500
GE Alwar
₹94,000
Yes
22 Sept 2026
23 Jul 2026
28 Aug 2026
23 Jul 2026
26 Aug 2026
12 Aug 2026
23 Jul 2026 - 5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating in trenches not exc 1.5 meter wide and not exc 1.5 meter in depth for foundation etc or for laying of cables, pipes etc and getting out in soft/loose soil complete all as specified and directed. | 790 | Cum | 1.25 | ₹987.5 |
| 2 | Returning, filling in, including spreading, leveling, watering and well ramming in layers not exc 25 cm thick in soft/loose soil complete all as specified and directed. | 660 | Cum | 100 | ₹66,000 |
| 3 | Removal of excavated soil/ material to a distance not exc 50 metre and depositing where directed at a level not exc 1.50 metre above the starting point complete all as specified and directed. | 130 | Cum | 53 | ₹6,890 |
| 4 | Taking up or down GI tubing and connections of 15 mm bore, fixed in walls, ceiling, floors, trenches etc, complete all as specified and directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 600 | RM | 10 | ₹6,000 |
| 5 | Taking up or down steel water tubing and connections of 20mm bore, fixed in walls, ceiling, floors, trenches etc. complete all as specified and directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 850 | RM | 11 | ₹9,350 |
| 6 | Taking up or down steel water tubing and connections of 25mm bore, fixed in walls, ceiling, floors, trenches etc. complete all as specified and directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 680 | RM | 1.25 | ₹850 |
| 7 | Taking up or down steel water tubing and connections of 40mm bore, laid in trenches etc. complete all as specified and directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 420 | RM | - | - |
| 8 | Taking up or down steel water tubing and connections of 50mm bore,laid in trenches etc. complete all as specified and directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 860 | RM | - | - |
| 9 | Taking up or down GI water tubing and connections of 80mm bore laid in trenches etc. complete all as specified and directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 580 | RM | 100 | ₹58,000 |
| 10 | Taking up or down water tubing and connections of 100mm bore laid in trenches etc. complete all as specified and directed..
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of this Schedule. | 910 | RM | 100 | ₹91,000 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Tender8545.pdf
Tender Documents • 0.92 MB
BOQ_873982.xls
BOQ • 3.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .