Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.7 CrAccepted-AOC NO 155B NEERPALAIPATTI PUDUKKOTTAI DISTRICT 622 515 | PUDUKKOTTAI | TAMIL NADU | 622515 | ₹2.7 Cr | 1 | Accepted-AOC L1 Accepted |
| 2 | 2₹2.8 Cr+₹9.0 L (3.34%)Rejected-Finance NO 74 NEERPAZHANI VIRAALIMALAI TALUKA PUDUKKOTTAI DISTRICT 622 515 | PUDUKKOTTAI | TAMIL NADU | 622515 | ₹2.8 Cr+₹9.0 L (3.34%) | 2 | Rejected-Finance L2 Rejected |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | MEGALA CONSTRUCTION L2 | VEERA CONSTRUCTION AND ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.10Strengthening of the road from K.Nangupatti to Rapoosal road (via) S.Nangupatti Km 0/0 - 4/480 (R-201) | |||||
| 1.20 | Clearing and grubbing Scrub jungle road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 5,349.6 | m2 | 6 ₹32,097.6 | 5.9 ₹31,562.64 Lowest |
| 1.30 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 2,674.8 | m3 | 140 ₹3,74,472 | 131 ₹3,50,398.8 Lowest |
| 1.40 | Existing BT surface picking including cost and conveyance of all Laboue Charges to site etc., complete. | 5,572.5 | m2 | 25 ₹1,39,312.5 | 21.8 ₹1,21,480.5 Lowest |
| 1.50Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. | |||||
| 1.60 | KM 0/0- 1/000 | 90 | m3 | 500 ₹45,000 | 470 ₹42,300 Lowest |
| 1.70 | KM 1/000 - 2/000 | 90 | m3 | 500 ₹45,000 | 482 ₹43,380 Lowest |
| 1.80 | KM 2/000 - 3/000 | 88.02 | m3 | 510 ₹44,890.2 | 494 ₹43,481.88 Lowest |
| 1.90 | KM 3/000 - 4/000 | 90 | m3 | 520 ₹46,800 | 505 ₹45,450 Lowest |
| 2.00 | KM 4/000 - 4/480 | 43.2 | m3 | 530 ₹22,896 | 505 ₹21,816 Lowest |
Tender Value
₹2.7 Cr
EMD Value
₹2.7 L
Closing Date
21 Jan 2025, 3:00 pmClosed
ADDITIONAL COLLECTOR (DEVELOPMENT)
DRDA., PUDUKKOTTAI
Package No. 09 - Viralimalai Panchayat Union - Strengthening and Five Year Maintanance of the Road from K.Nangupatti to Rapoosal Road (via) S.Nangupatti in Nangupatti Panchayat Under NABARD RIDF XXX-2024-25
2024_RDTN_515181_1
PDKT/DRDA/NABARD/09
Open Tender
Civil Works - Roads
Item Rate
180 days
Viralimalai
Please refer tender document
4 documents required · 4 mandatory
₹0
₹2.7 L
DRDA PUDUKKOTTAI
7 Aug 2025
30 Dec 2024
21 Jan 2025
30 Dec 2024
21 Jan 2025
30 Dec 2024
7 Jan 2025
Amount
Strengthening of the road from K.Nangupatti to Rapoosal road (via) S.Nangupatti Km 0/0 - 4/480 (R-201)
Clearing and grubbing Scrub jungle road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Existing BT surface picking including cost and conveyance of all Laboue Charges to site etc., complete.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per 10.00 square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminous macadam based on job mix formula mixed in hot mix plant of drum type in one layer for overlay as shown in drawing using paving Bitumen 60/70 penetration grade as per IS 73 and aggregates conforming to grading 50mm thick
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for KM and HM stones
Kilo metre stone
Hecta metre stone
Provision for Name Board Cum Citizen Board
Provision for Cautionary Sign Boards
Provision for Mandatory Sign Boards
Provision for Chevron Signs
Road Marking with Hot applied Thermoplastic compound with Reflectorising glass beads on Bituminous surface
Provision for Construction Hard Bed Culvert @ Ch 2180 m (22 Metre)
Earth work excavation for foundation soil as per SS 20 B for foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete. Below sill
PAVEMENT M30 MIX Wearing Coat with CC 1 : 1.5 : 3 mix using 65% of 25mm, 25% of 12mm, and10% of 6mm IRC metal including cost of all materials and labour charges for mixing, laying, compacting and curing etc. complete. - 75mm uniform thickness
Maintenance of the road
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
MEGALA CONSTRUCTION (BID ID -1229232)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .