Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical qualified |
| 2 | Accepted-Technical | Accepted-Technical qualified |
| 3 | Accepted-Technical S O TSEWANG RIGZIN R O GYA | Accepted-Technical qualified |
Tender Value
₹75.2 L
EMD Value
₹1.5 L
Closing Date
18 May 2026, 12:00 pmClosed
Executive Engineer phe div leh
Executive Engineer phe div leh
Construction of Water Supply Scheme at 5th Battalion ITBP Camp at BURTSE UNDER Deposit Fund
2026_PWD_18847_6
E-Tender no 498 of phe div leh
Open Tender
Civil Works - Others
Percentage
60 days
leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
Executive Engineer phe div leh
₹1.5 L
20 May 2026
16 May 2026
19 May 2026
16 May 2026
18 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto1.5m, as directed by Engineer-in Charge All kinds of soil | 330 | Sqm | 104.97 | ₹34,640.1 |
| 2 | Earth work inexcavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge All kinds of Soil 50% | 164.09 | cum | 245.94 | ₹40,356.29 |
| 3 | Ordinary Rock | 163.17 | Cum | 452.99 | ₹73,914.38 |
| 4 | Extra for every additional lift of 1.5 m or part there of in excavation/banking excavated or stacked materials 1st lift All kinds of soil | 13.88 | Cum | 105.25 | ₹1,460.87 |
| 5 | Ordinary Rock | 13.88 | Cum | 189.27 | ₹2,627.07 |
| 6 | 2nd lift All kinds of soil | 11.18 | cum | 210.5 | ₹2,353.39 |
| 7 | Ordinary Rock | 11.18 | cum | 378.54 | ₹4,232.08 |
| 8 | 3rd lift All kinds of soil | 8.76 | cum | 315.75 | ₹2,765.97 |
| 9 | Ordinary Rock | 8.76 | cum | 567.81 | ₹4,974.02 |
| 10 | 4th lift All kinds of soil | 6.64 | cum | 315.75 | ₹2,096.58 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_45254.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .