| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC 49 B 139 B TIRUNELVELI BYPASS ROAD SALAI PUDUR KAYATHAR THOOTHUKUDI | TIRUNELVELI | TAMIL NADU | 627001 | L1 | Accepted-AOC Responsive |
| Sl No | Description | Qty | Unit | S VELLAPANDI & CO L1 |
|---|---|---|---|---|
| 1.00Civil Work | ||||
| 2.00PUMP HOUSE | ||||
| 3.00 | Earthwork excavation in hard stiff clay,black cotton, hard red earth, shales,murrams, ordinary gravel stoney earth mixed with 50% fair sized boulders etc.,with initial lead of 10m and lift Ist depth of 2m | 15.04 | 1Cum | 269 ₹4,045.76 Lowest |
| 4.00 | Filling with clean river sand complying with standard specification including watering ramming and consolidation etc.,For Foundation | 5.15 | 1Cum | 1,759 ₹9,058.85 Lowest |
| 5.00 | Levelling coarse in cement concrete 1:4:8 (one cement,four sand and eight aggregate) using 40mm hard broken stone for foundation and leveling coarse including cost of all materials,mixing,placing, ramming, curing,finishing etc., complete and as directed For foundation | 1.63 | 1Cum | 5,548 ₹9,043.24 Lowest |
| 6.00 | Refilling the foundation with excavated Soil (other than sand) in layers more than 15cm thick, watering, well ramming, consolidating, complying with standard specification | 11.56 | 1Cum | 160 ₹1,849.6 Lowest |
| 7.00 | Brick work in CM 1:5 using country bricks for basement of size 8.75" X 4.25" X 2.25" including cost of all materials, labour charges, curing etc., for basement | 6.08 | 1Cum | 6,528 ₹39,690.24 Lowest |
| 8.00 | Brick work in CM 1:5 using country bricks for basement of size 8.75" X 4.25" X 2.25" including cost of all materials, labour charges, curing etc., for Super structure | 23.55 | 1Cum | 6,625 ₹1,56,018.75 Lowest |
| 9.00 | Reinforced Cement Concrete 1:1.5:3 (One cement,one and half sand and three aggregate) using 20 mm Machine crushed HBG stone for the following members excluding the cost of reinforcement and fabricating, centering, shuttering and strutting charges but including the cost of all materials, mixing, placing in position, lifting, vibrating, finishing & curing, etc. complete. UP TO GL | 11.08 | 1Cum | 9,556 ₹1,05,880.48 Lowest |
| 10.00 | AT GROUND FLOOR | 17.89 | 1Cum | 9,704 ₹1,73,604.56 Lowest |
Tender Value
₹2.3 Cr
EMD Value
₹2.3 L
Closing Date
13 Mar 2026, 3:00 pmClosed
COMMISSIONER TIRUNELVELI
1 Sn High Road Tirunelveli Municipal Corporation
Construction of Pump room,toilet,supply and erection of 90 HP HSC motor in 10 lakh litre ground level sump in Achimadam (Kumaran colony) and supply and jointing of 200 mm DI pipe -2800 m laying of 350 mm DI pipe- 2000 m from Achimadam sump.
2026_MAWS_671544_3
64/2025-26
Open Tender
Civil Works - Water Works
Works
1 Sn High Road Tirunelveli Municipal Corporation
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹2.3 L
1 Sn High Road Tirunelveli Municipal Corporation
21 Oct 2026
6 Mar 2026
13 Mar 2026
6 Mar 2026
13 Mar 2026
6 Mar 2026
9 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Work | - | - | - | - |
| 2 | PUMP HOUSE | - | - | - | - |
| 3 | Earthwork excavation in hard stiff clay,black cotton, hard red earth, shales,murrams, ordinary gravel stoney earth mixed with 50% fair sized boulders etc.,with initial lead of 10m and lift Ist depth of 2m | 15.04 | 1Cum | 2,507 | ₹37,705.28 |
| 4 | Filling with clean river sand complying with standard specification including watering ramming and consolidation etc.,For Foundation | 5.15 | 1Cum | 2,508 | ₹12,916.2 |
| 5 | Levelling coarse in cement concrete 1:4:8 (one cement,four sand and eight aggregate) using 40mm hard broken stone for foundation and leveling coarse including cost of all materials,mixing,placing, ramming, curing,finishing etc., complete and as directed For foundation | 1.63 | 1Cum | 2,509 | ₹4,089.67 |
| 6 | Refilling the foundation with excavated Soil (other than sand) in layers more than 15cm thick, watering, well ramming, consolidating, complying with standard specification | 11.56 | 1Cum | 2,510 | ₹29,015.6 |
| 7 | Brick work in CM 1:5 using country bricks for basement of size 8.75" X 4.25" X 2.25" including cost of all materials, labour charges, curing etc., for basement | 6.08 | 1Cum | 2,511 | ₹15,266.88 |
| 8 | Brick work in CM 1:5 using country bricks for basement of size 8.75" X 4.25" X 2.25" including cost of all materials, labour charges, curing etc., for Super structure | 23.55 | 1Cum | 2,512 | ₹59,157.6 |
| 9 | Reinforced Cement Concrete 1:1.5:3 (One cement,one and half sand and three aggregate) using 20 mm Machine crushed HBG stone for the following members excluding the cost of reinforcement and fabricating, centering, shuttering and strutting charges but including the cost of all materials, mixing, placing in position, lifting, vibrating, finishing & curing, etc. complete. UP TO GL | 11.08 | 1Cum | 2,513 | ₹27,844.04 |
| 10 | AT GROUND FLOOR | 17.89 | 1Cum | 2,514 | ₹44,975.46 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_807077.xls
BOQ • 0.47 MB
1biddocument.pdf
Tender Documents • 0.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .